GE Industrial Solutions A Series Lighting Control Panelboards Replacement of Back plane User Manual

r
f
A
b
p
r
g
A
A
A
A
A
A
DEH41093 Installation Instructions R02
g
r
WARNING: Danger of electrical shock or injury. Turn OFF power service to the line side of the panel board or switchboard before working inside the equipment or removing any component. Equipment is to be
Replacement of Back plane assembly
Catalog No. Qty Description
SRGLCPCB12 1 12 Ckt Back Plane replacement kit SRGLCPCB18 1 18 Ckt Back Plane replacement kit SRGLCPCB24 1 24 Ckt Back Plane replacement kit SRGLCPCB30 1 30 Ckt Back Plane replacement kit SRGLCPCB36 1 36 Ckt Back Plane replacement kit SRGLCPCB42 1 42 Ckt Back Plane replacement kit
Removal of Existing Back Plane Assembly:
1. Ensure that the Installer is properly grounded while
2. Remove the front cover and dead front of the Panel board
3. Remove the center barrier by unscrewing the four mtg
4. Remove all the breakers on the side of back plane that
5. Unscrew the connecting cables ends to DB25 connecto
6. Remove all the caplugs on the back plane assembly to be
7. Unscrew the hold down bracket mtg screw as per side
8. Unscrew Philips head screws holding the tray cover &
9. Remove the tray cover by lifting it.
10. Remove the back plane assembly.
Reinstallation instructions:
1. Locate the back plane assembly into the embossment
2. Drop down the tray cover so as it snaps on all the plastic
3. Tighten all the Philips headed screws to torque of 10 lb-
4. Assemble the hold down bracket and fastened it to the
5. Insert the caplug on the DB25 Pin connector of back plane
6. Connect the DB25 connector cables by pressing the end
7. Install the breakers on the side on the replaced back plane
8. Install the center barrier and tighten mtg the screws to hold
9. Install the dead front and front cover of the Panel board /
installed and maintained by properly trained and qualified personnel only.
working near the controller box area
/ Integrated switch board
screws which covers the line straps of each breaker.
needs to be replaced 4a) Unscrew the breaker line strap mtg screw 4b) Hold the breaker and lift upwards & avoid it rotating
on the back plane assembly to be replaced.
replaced. Save caplugs for new back plane assembly.
required on the controller box and then remove the hold down bracket.
save them.
provided in panel plastic mounting base tray and embossment provided on the top & bottom end caps.
tray snap tabs
inch to the tray cover so as to secure the back plane firmly.
controller box with hold down mtg screw & torque to 10 lb­inch
assembly on the other end.
of the cables firmly and tighten two knurled screws o cable end to torque of 5-10 lb-inch.
assembly. Breakers to be mounted straight down 7a) Align breaker line strap screw to bus bar strap mtg hole and breaker connector to back plane connector. 7b) Push the breaker on to the plastic base mtg rail. 7c) Torque the line strap screw to 35 lb-inch.
it firmly. Press this barrier on each breaker so it covers the Line straps properly.
Integrated Switch board.
Series® Lighting Control Panel boards
Top end cap Embossment
Hold down Bracket
Back Plane Assy
Caplugs
Philips head screws
Top End Ca
Snap tab
Plastic Base tray Embossment
Externally Mounted Controller Assembly
DB25 Connector Cable
Internally Mounted Controller Assembly
Back Plane Connecto
Breaker Installation
Panel mtg Base
Hold down bracket mt
screw
Bottom End Cap
Hold down Bracket
Tray cove
Back Plane: ASRGLCPCB12 ASRGLCPCB18 ASRGLCPCB24 ASRGLCPCB30 ASRGLCPCB36
Bottom end cap Embossment
Controller Box
Hold down
racket mtg screw
Line Strap
GE Consumer & Industrial General Electric Company, Plainville, CT 06062
2004 General Electric Company DEH41093 R02
Loading...