WARNING: Danger of electrical shock or injury.
OFF
Turn switchboard before workin
ment or removing any component. Do
e not remove circuit other component until the power is turned OFF.
General
These instructions apply to the following catalog numbers:
• Circuit breaker modules AMC2GM and AMC3GM
• Circuit breaker frames SGDA, SGHA, SGLA and SGPA
ower ahead of the panelboard or
inside the
rotective devices or an
GEH5674 Installation Instructions R03
Spectra Series™ Power Panelboards
Circuit Breakers and Modules
A & C Phase As Received
A & B Phase
Installation
1. Phase balancing for two-pole devices on three-phase
systems. Reposition the bus clip assembly from A or C
phase to B phase as shown in Figures 1 and 2. Remove the screws and the bus clip assembly. Move the bus clip to the B phase location. Fasten the bus clip assembly with the screws tightened to 27–32 in-lb.
2. Install the circuit breaker.
a. Main devices (lugs only on ON side of circuit
breaker). Place the OFF side of the breaker over the
stud posts, as shown in Figure 3. Secure the breaker OFF side to the module with hex-head Belleville washers and tighten to 90–110 in-lb. Secure the breaker ON side to the module with round-head screws and flat washers and tighten to 40–50 in-lb.
b. Branch devices (lugs only on OFF side of the
breaker). Place the ON side of the breaker over the
stud posts, as shown in Figure 3. Secure the breaker ON side to the module with head-head Belleville washers and tighten to 90–110 in-lb. Secure the breaker OFF side to the module with round-head screws and flat washers and tighten to 40–50 in-lb.
A or C Phase
Location
B Phase
Location
screws and
screws and
A or C Phase
Location
B & C Phase
Figure 2. Phase diagram showing positions of bus clips.
Round-Head
Screw & Flat
Washer
Hex-Head Screw
& Belleville
Washer
Stud
Post
Latch
Screw
Latch
Figure 3. Installing the breaker on the module.
Figure 1. Bus clip locations on the breaker module.
3. Install the breaker module. Fully retract the latches
g
quip
y
p
and hook one side of the breaker module to the interior rail, as shown in Figure 4. Release the latch. Pivot the module onto the bus bars and engage the second latch. Release the latch. Tighten the latch screws to 25 in-lb, as shown in Figure 5.
Latch
Latch
Screw
Latch
Screw
Figure 5. Securing the module to the interior.
4. Wire the circuits. Refer to the label on the circuit breaker for the proper tightening torque.
5. Filler plate kits. Install filler plate kit AFP4SGS on the module.
Figure 4. Positioning the breaker module on the interior rail.
Attention – Procedure for Aluminum Terminations
1. Strip the insulation, being careful to not nick the wire.
2. Clean the wire strands with a wire brush.
3. Thoroughly coat the stripped conductor with a
suitable antioxidant compound, such as ALNOX or PENETROX A13.
4. Insert the conductor and tighten the connector screw to the torque indicated on the rating label.
These instructions do not cover all details or variations in e ma
be met in connection with installation, operation, or maintenance. Should further information be desired or should
articular problems arise that are not covered sufficiently for the purchaser’s purposes, the matter should be referred to the
GE Company.
ment nor do they provide for every possible contingency that
GE Industrial Systems
General Electric Company 41 Woodford Ave., Plainville, CT 06062
GEH5674 R03 0701 © 2001 General Electric Company
Loading...