Frymaster HPTARB Service Manual

Heated Pass Through
Service and Parts
Frymaster, a member of the Commercial Food Equipment Service Association, recommends using CFESA Certified Technicians.
*8195931*
24-Hour Service Hotline
1-800-551-8633
Price: $6.00
JULY 2011
NOTICE
IF, DURING THE WARRANTY PERIOD, THE CUSTOMER USES A PART FOR THIS ENODIS EQUIPMENT OTHER THAN AN UNMODIFIED NEW OR RECYCLED PART PURCHASED DIRECTLY FROM FRYMASTER/DEAN, OR ANY OF ITS AUTHORIZED SERVICE CENTERS, AND/OR THE PART BEING USED IS MODIFIED FROM ITS ORIGINAL CONFIGURATION, THIS WARRANTY WILL BE VOID. FURTHER, FRYMASTER/DEAN AND ITS AFFILIATES WILL NOT BE LIABLE FOR ANY CLAIMS, DAMAGES OR EXPENSES INCURRED BY THE CUSTOMER WHICH ARISE DIRECTLY OR INDIRECTLY, IN WHOLE OR IN PART, DUE TO THE INSTALLATION OF ANY MODIFIED PART AND/OR PART RECEIVED FROM AN UNAUTHORIZED SERVICE CENTER.
THE HEATED PASS THROUGH IS NOT SUITABLE FOR OUTDOOR USE. WHEN OPERATING
THIS UNIT, IT MUST BE PLACED ON A HORIZONTAL SURFACE.
THE HEATED PASS THROUGH IS NOT SUITABLE FOR INSTALLATION IN AN AREA WHERE
A WATER JET CAN BE USED. THIS APPLIANCE MUST NOT BE CLEANED WITH A WATER
JET.
FOR YOUR SAFETY
DO NOT STORE OR USE GASOLINE OR OTHER FLAMMABLE VAPORS AND LIQUIDS IN
THE VICINITY OF THIS OR ANY OTHER APPLIANCE.
DO NOT OPERATE OR SERVICE THE HPT SERIES WITHOUT FIRST READING THIS
MANUAL.
DO NOT OPERATE THE HPT UNLESS IT HAS BEEN PROPERLY INSTALLED AND CHECKED.
DO NOT OPERATE THE HPT UNLESS ALL SERVICE AND ACCESS PANELS ARE IN PLACE
AND PROPERLY SECURED.
DO NOT ATTEMPT TO REPAIR OR REPLACE ANY COMPONENT OF THE HPT UNLESS ALL
POWER TO THE UNIT HAS BEEN DISCONNECTED.
USE CAUTION WHEN SETTING UP, OPERATING, OR CLEANING THE HEATED PASS
THROUGH TO AVOID CONTACT WITH HEATED SURFACES.
HEATED PASS THROUGH
SERVICE AND PARTS
1. Parts Ordering and Service Information
Parts orders may be placed directly with your local Frymaster Factory Authorized Servicer (FAS)/Distributor. Your nearest Frymaster FAS’s/ Distributors can also be found on Frymaster’s Web site, Frymaster.com. or you can contact the Frymaster Service Department at 1-800-24-FRYER or 1-318-865-1711.
To speed up your order, the following information is required: Model Number _________________________ Serial Number _________________________ Voltage _______________________________ Item Part Number _______________________ Quantity Needed _______________________
Service may be obtained by contacting your local Frymaster Authorized Service Center/Distributor. Service information may be obtained by calling the Frymaster Service Department. The following information will be needed in order to assist you quickly and efficiently:
Model Number _________________________ Serial Number _________________________ Nature of theProblem_____________________________________________________________ ______________________________________________________________________________ ______________________________________________________________________________
Also include any other information which may be helpful in solving your service problem.
RETAIN AND STORE THIS MANUAL IN THE EQUIPMENT MANUAL FOR FUTURE USE.
2. General
The Heated Pass Through or HPT is designed to hold assembled sandwiches. By circulating heated air evenly across the open staging area, the unit keeps sandwiches hot without drying or cooking.
3. Installation/Set Up
Upon arrival, inspect the HPT for concealed damage. Immediately report any damage to the delivering freight company. Claims must be filed within 15 days after receipt of the unit.
Make sure that the unit is placed on an even surface and that the area surrounding the HPT is free of clutter that would interfere with airflow.
Install the Filter Screen
The filter screen is designed to prevent debris from entering the cowl assembly and clogging the blower. Slip the part over the vent opening on the ON/OFF switch side of the unit. The filter screen snaps into position.
The filter screen snaps into place on the air-intake tower.
1
HEATED PASS THROUGH
SERVICE AND PARTS
Power Requirements:
Voltage – Two models: 208 VAC and 240 VAC
Frequency - 208V/60 Hz, 240V/50-60 Hz
Single Phase
20 amp Service
4. Operation
1. Plug the unit into the power source.
2. Press the ON/OFF rocker switch to the ON
position.
3. Place product in the HPT in accordance with the
restaurant’s established procedures.
THIS APPLIANCE IS EQUIPPED WITH A
GROUNDING PLUG FOR YOUR
PROTECTION AGAINST SHOCK HAZARD
AND MUST BE PLUGGED INTO A
PROPERLY GROUNDED RECEPTACLE.
DO NOT CUT OR REMOVE THE
GROUNDING PRONG.FROM THIS PLUG.
DANGER
Air Tower
If the 240 VAC model is operated on 208 VAC, the unit will heat slowly and may not reach maximum temperature. If the 208 VAC model is operated on 240 VAC, component damage is likely. To ensure proper operation, the power source should match the voltage on the rating plate on the bottom of the HLZ.
Heated air flows
from the air tower
across the plate
and into the cowl.
Plate
ON/OFF Switch
Power Cord
Blower
Cowl
Air flow through the HPT
Plate
2
Loading...
+ 8 hidden pages