Franklin Fueling Systems TSP-DIS User Manual

TSP-DIS & TSP-EIS
Interstitial BriteSensor® & Standard Sensor
Installation Instructions
Franklin Fueling Systems • 3760 Marsh Rd. • Madison, WI 53718 USA
Tel: +1 608 838 8786 • 800 225 9787 • Fax: +1 608 838 6433 • www.franklinfueling.com
Overview
Conductivity Sensors
1.10
(27.94
mm)
0.62
(15.75
mm)
0.63 (15.75 mm)
2.69
(68.33 mm)
3.22
(81.79 mm)
0.63 (15.75 mm) HEX
TSP-EIS
TSP-DIS
Discriminating Interstitial Sensor (Britesensor
®
)
Electro-optic Interstitial Sensor (Standard Sensor)
Double Wall Fiberglass Tank
Manhole
Cover For
14 Inch (35.56 Cm)
Min. Dia. Manhole
1/2 or 3/4 Inch Conduit
2 Inch (50.8 Mm)
Riser Pipe
TSP-DIS
or
TSP-EIS
Sensor
Eys Seal Fitting
Interstitial
Area (Dry)
TSP-K12 Riser Cap (With Cord Grip ­ Compression Fitting)
Clean Fill Material (Gravel Typical)
Concrete Slab Per NFPA 30
Weatherproof Junction Box
Compression Fitting (Cord Grip)
Annular Space Interstitial Sensor (TSP-EIS or TSP-DIS)
Pull Wire
Doublewall Fiberglass Tank
Sensor Cable
Pull Wire
Riser Pipe
The TSP-EIS is a Standard sensor and the TSP-DIS is an intelligent BriteSensor.® These sensors are used to detect the presence of liquids in the normally dry interstitial (annular) areas of double-wall fuel storage tanks (a Class 1, Division 1, Group D Hazardous Area). Both types of sensors use electro-optical technology (LED & Prism) for liquid-detection.
Figure 1: TSP-DIS and TSP-EIS Dimensions
The TSP-EIS communicates its identication code and current detection status to the ATG console (water present or normal – no liquids detected). An open-circuit is recognized as an alarm-condition at the intrinsically safe (I.S) leak detection circuits of the FFS (Franklin Fueling Systems) ATG (Automatic Tank Gauge).
EYS Seal ttings and Epoxy to ll the tting after
operational testing is completed.
Weatherproof junction box, gasket, and cover, plus a
3/4 to 1/2 inch NPT reducing bushing if 1/2 inch RMC is used – see the ATG Installation Guide for recommended electrical junction boxes.
Wire: THHN, TFFN or THWN, 18 AWG: Red, White, &
Black or Alpha Cable # 58113, 0.131 O.D. – 1,500 feet (457 meters) maximum length. Alpha cable #58113 (INCON P / N 600-0063) must be used when using nonmetallic (PVC) conduit.
Slip joint pliers to seat the no-strip, self-sealing wire
connectors (connectors included with the sensor).
Thread UL approved sealant or pipe dope as required
for installation in UST interstitial areas (Figure 2).
2
The TSP-DIS sensor is enhanced with conductivity sensors and a small microprocessor which allows it to discriminate between water and product. The TSP-DIS also communicates its identication code and current detection status to the ATG console (water present, product present, or normal – no liquids detected).
Both sensors are supplied with no-strip electrical wire connectors, 25 feet of cable, a Model ID tag, and a cord­grip tting for connection to a weatherproof electrical junction box (see diagrams).
Testing the Sensors
Dip the tip of the sensor in a clean cup of water – a standard sensor alarm is generated for a TSP-EIS sensor and a water alarm is generated for the TSP-DIS sensor. When dipped in isopropyl alcohol, the TSP-DIS sensor will produce a product alarm.
Test sensors on a yearly basis, or more frequently — per local code.
Materials Required
Optional – TSP-DB1 Epoxy Seal kit for no-strip electrical
connectors – recommended for sites: within ood zones, high groundwater tables, with poor drainage, or when Junction Boxes are not used.
1/2 or 3/4 inch NPT (National Pipe Thread, tapered),
Rigid Metal Conduit (RMC) or nonmetallic (PVC) conduit if allowed by local codes.
Figure 2: Installation in Double-Walled Fiberglass Tanks
* TSP-KI2 Riser Cap for 2-inch riser pipes, includes a
pre-installed 1/2 inch NPT compression gland (cord grip) tting. Other riser caps are available for different riser pipe sizes – consult your factory rep.
* Riser pipe – 2 inch diameter (OD), threaded at one
end (NPT-14) with all rough edges removed / deburred from the inner edges.
Installation Sequence:
Double Wall Steel Tank
Install Height (Measured)
Manhole
Cover For
14 inch (35.56 cm)
Min. Dia. Manhole
1/2 or 3/4 Inch Conduit
2 Inch (50.8 Mm) Riser Pipe
Eys Seal
Fitting
Interstitial Area (Dry)
TSP-DIS Or
TSP-EIS
Sensor
Clean Fill Material (Gravel Typical)
TSP-KI2 Riser Cap
(With Cord Grip ­ Compression Fitting)
Concrete Slab Per NFPA 30
Weatherproof Junction Box
Compression
Fitting
(Cord Grip)
Caution
Warning
Caution
Warning
1. * Install riser pipe, manhole.
2. Install conduit, EYS ttings, and weatherproof junction box.
3. Shut off power.
ELECTRICAL DANGER Avoid electrical shock hazards: ensure all power going to the ATG console is turned off, tagged, and locked-out at the power panel before doing any maintenance or installation work at the ATG console
4. Interstitial installation – Figure 2, measure the length of the riser pipe + 1.5 x diameter of tank = _________total length. Mark this length on the cable and pull it through the TSP-KI2 riser cap cord-grip until the mark is 12 inches (30.5 cm) above the tting. Tie one end of the pull-wire to the sensor pull cap and pull the wire until the sensor cable moves just above the cord-grip (leave the pull wire in place: loop the wire around the cable) and then tighten the tting.
5. Interstitial installation (Figure 3), measure the INSTALL HEIGHT needed and add 1.5 inches for the riser cap = total height.
Mark the total height required on the sensor cable, and pull the cable through the TSP-KI2 riser cap until the mark shows at the top of the cord grip tting. Tighten the tting and lower the sensor into the interstitial area of the tank as shown in Figure 3.
8. Test sensor (verify that an alarm is produced at ATG console), if it does produce an alarm, seal EYS seal ttings and electrical connectors with epoxy.
9. Turn off power again if other devices are to be installed (Repeat Step 3).
10. Reinstall all safety covers and guards, junction box gasket and covers – use pipe-dope to seal all tting threads.
11. Install the manhole cover.
12. Record the location where the sensor was installed on the chart on the back page of these instructions. This information will be needed when programming the ATG.
13. Turn on power and program the ATG – Ref: all relating to Sensors in the Setup / Programming & Installation manuals.
General Installation Notes
* Steel double-walled tanks: codes may require a non­conductive isolation-bushing be installed between the tank and riser pipe.
It is the installer’s responsibility to comply with all applicable federal, state and local codes. Failure to do so may create an Environmental Hazard.
Plan your conduit routing. Dig trenches as necessary to install conduit from each junction box to the Intrinsically Safe (I.S.) knockouts at the ATG console. You must install a weatherproof, electrical junction box inside each manhole. The junction box should be installed high on the manhole wall to prevent it from being submerged during heavy rains.
Figure 3: Installation in double-Walled Steel Tanks
6. Pull the sensor cables through the cord grip tting at the junction box and tighten all remaining cord­grip ttings. Trim wire/cables to a 6 or 8 inch (15 or 20 cm) service-loop and splice the sensor and console wires together per Figure 4 .
7. Power up console for next step.
* Fill the bottom of the manhole with crushed stone to facilitate drainage when the sensor is installed in the interstitial space of a steel tank. Do not cover the top of the riser cap with ll material, it must remain accessible for service / sensor installation.
The conduit may enter the manhole either from the bottom or the side.
A junction box may be used inside of the building as a pull box to combine several sensor cables. If this is done, then only one I.S. conduit knockout will be used.
WARNING Conduits must have EYS
seal ttings installed in accordance
with NFPA 70 (National Electric Code) and NFPA 30A (Automotive and Marine Service Station Code). Failure to seal conduits in accordance with NFPA 30A,
and NFPA 70 could allow ammable
vapors to travel through the conduit in the ATG console. An explosion could result causing serious injury, property loss, or death.
3
CAUTION Seal all threaded ttings
TO 3-W I RE SENSOR
3 W IR ES/C ABLE FROM CON SOLE
3-C ONDUCTO R CABLE FROM SE NSOR
SENSOR N
IN(WHT)
Only remove the
j
umper link between: IN (wht) & GND (blk), wh en a sensor channel is w ired
Note: The PWR (red) terminal is only used wi th 3-w ire sensors
GND(BLK)
PWR(RED)
PWR(RED)
SENSOR 1
IN(WHT)
GND(BLK)
Insert the unstripped w ires fully into the self-sealing, no-strip electrical connector.
Use slip-joint pliers and seat the black portion
to
make a good electrical connection
GND (BLK)
PWR (RED)
IN (WHT)
Caution
and conduit threads to produce a weatherproof seal.
Figure 4: TSP-DIS / TSP-EIS Wire Splicing
and Console Wiring
Record Sensor Location
Sensor Channel # / Notes
Electrical Wiring
Reference the ATG Installation Manual and see Figure 4 for sensor wiring details.
©2008 FFS 000-1344 Rev D
Loading...