Scope of supply ......................................................................................................................................5
Function .................................................................................................................................................5
Declaration of Conformity .....................................................................................................................27
3
4
Important Notes
Usage for the intended purpose
BB 2, BB 1, BB 2 with dampers, BB 1 with dampers:
The swing and dual-plate check valves ensure unidirectional flow in pipes by preventing a backflow
of liquids or gases.
Use this equipment only within the specified pressure and temperature ratings and check corrosion
resistance and chemical suitability for the application in question.
Safety note
The valve must only be installed and commissioned by qualified staff.
Maintenance and service work must only be performed by adequately trained persons who have a
recognised level of competence.
Danger
The valve is under pressure during operation.
When loosening flanged connections or sealing plugs, hot water, steam, corrosive liquids
or toxic gases may escape. This presents the danger of severe burns and scalds to the
whole body or severe cases of poisoning.
Installation and maintenance work should only be carried out when the system is
depressurized.
The valve becomes hot or extremely cold during operation. This presents the risk of
severe burns to hands and arms. Installation and maintenance work should only be
carried out at room temperatures.
Sharp edges on internals present a danger of cuts to hands. Always wear industrial
gloves for installation and maintenance work.
Pressure Equipment Directive (PED)
The equipment fullfills the requirements of the Pressure Equipment Directive PED 97/23/EC. BB...C and
BB...A for applications with fluids of group 1 and 2; BB...G for applications with fluids of group 2.
With CE marking (apart from equipment according to section 3.3).
ATEX (Atmosphère Explosible)
The equipment does not have its own potential source of ignition and is therefore not subject to the
ATEX Directive 94/9/EC.
The equipment can be used in potentially explosive areas 0, 1, 2, 20, 21, 22 (1999/92/EC).
The equipment is not Ex marked.
Explanatory Notes
Scope of supply
BB 1...
1 Dual-plate check valve type BB 1...
1 Installation manual
BB 2...
1 Dual-plate check valve type BB 2...
1 Installation manual
BB 1... D
1 Dual-plate check valve type BB 1... with dampers
1 Installation manual
BB 2... D
1 Dual-plate check valve type BB 2... with dampers
1 Installation manual
Description
Swing and dual-plate check valves BB feature two separately suspended semi-circular plates pivoting
on an independent hinge pin. The two plates open and close automatically allowing fluid to flow
in one direction only. The opening pressure and closing time can be customized by modifying the
spring characteristic. Hydraulic dampers are also available as optional extras to solve waterhammer
problems. Installation in any position, with due regard to our installation recommendations. Our
dual-plate check valves are fitted with eyebolts for easy installation and transit protection.
Please note that dual-plate check valves should not be used on reciprocating compressors, piston
pumps or where pulsating flow exists.
Function
The low opening pressure of the dual-plate check valves is a function of the spring characteristics.
When the opening pressure is reached the hinge sides of the plates open first, thereby eliminating
any possibility of the seats scuffing. As the pressure and flowrate rise, the opening angle increases
symmetrically. Media entering the valve at an unfavourable angle (e. g. due to pipe bends) may cause
an asymmetrical opening of the plates. If centrifugal pumps are installed upstream of the valve it
becomes necessary to arrange for a defined stabilizing section. Systems where pulsating flow exists
require specially designed dual-plate check valves. Make sure to install valves that are not fitted with
springs in a vertical position with upward flow. Please note the installation recommendations outlined
in the following pages.
5
6
Technical Data
Corrosion Resistance
When used for its intended purpose the safe functioning of the valve will not be impaired by corrosion.
Sizing
The valve body must not be subjected to sharp increases in pressure. The dimensional allowances for
corrosion reflect the latest state of technology.
Name Plate / Marking
For pressure & temperature ratings see indication on trap body (DN 50 – DN 125) or specification on
the name plate (DN 150 to DN 1200).
According to EN 19 the following indications are stated on the name plate:
■ Manufacturer’s brand
■ Type designation
■ Pressure class PN or Class
■ Material number
■ Max. temperature
■ Max. pressure
■ Stamp on valve body, e. g. specifies the quarter and the year of production
(Example: 4
th
quarter 2004).
4
04
Name plate BB... DN 150 to DN 1200
Direction of flow
Text on valve body BB... DN 50 to DN 125
Direction
of flow
Item number
Designation
Materials
facturing
date
Size / nominal
pressure
DesignationSize / Nominal pressure
Materials
Max.
pressure
Item
number
Min.
temperature
Notified bodyManu-
Max. pressure / temperature
Min. pressure / temperature
Notified body
Design
BB 1...
H
I
I
J
G
J
G
E
F
A
E
A
B
A
C
D
Fig. 1
H
7
8
Design – continued –
BB 1... with dampers
J
J
G
A
E
A
B
C
D
H
I
Fig. 2
I
H
G
E
F
A
M
Design – continued –
BB 2...
G
H
I
I
H
L
J
J
K
F
D
B
C
Fig. 3
G
L
K
9
10
M
A
D
E
B
Y
G
ES
T
R
A
Design – continued –
BB 2... with dampers
Fig. 4
G
H
I
I
H
G
L
J
L
J
K
K
F
D
B
E
C
M
Design – continued –
Key
A Sealing plug with gasket BB 1...
B Eyebolt
C Name plate
D Body
E Plate support BB 1...
F O-ring
G Semi-circular valve plates
H Spring left
I Spring right
J Hinge pin
K Hinge pin support BB 2...
L Threaded bolt BB 2...
M Damper (cpl.) with gasket
11
12
Installation
Danger
Danger of severe injuries, death and destruction caused by the explosion of explosive
gas-air mixtures.
An electrically insulated installation between pipe flanges can cause static electricity.
If the equipment is to be installed in explosion-risk areas, appropriate measures have to
be taken in order to discharge static electricity (earthing)!
Springs
The dual-plate check valve BB 1..., BB 2... with standard springs may be fitted in horizontal pipework
or in vertical pipework with upward flow. For downward flow special springs are required. For more
information refer to our data sheet “Dual-Plate Check Valve BB”.
Spring “7 WA”
Spring for 7 mbar opening pressure, suitable for horizontal installation or vertical installation with
upward flow.
Spring “2 WA”
Spring for 2 mbar opening pressure, suitable for horizontal installation or vertical installation with
upward flow.
Spring “5 VO”
Spring for 5 mbar opening pressure, suitable for vertical installation with downward flow. These
springs are also suitable for horizontal installation, opening pressure 20 mbar.
Note
Installing a dual-plate check valve with spring type “5 VO” in horizontal lines or vertical
lines with upward flow may result in loud noises, scuffing and subsequent wear on the
seat.
BB 1..., BB 2...
1. Please note our installation recommendations on page 16.
2. Clean plate seats.
Horizontal flow: Insert flange bolts through bottom flange bore and tighten nuts.
3.
Use off-the-shelf seals.
4. Mount and align dual-plate check valve BB, making sure that the eyebolt
Insert and tighten flange bolts.
6. Mount and align dual-plate check valve BB. Insert off-the-shelf seals (top). Insert and tighten flange
bolts.
B is on top.
Installation – continued –
BB 1... with dampers, BB 2... with dampers
1. Please note our installation recommendations on page 14.
2. Use only the eyebolt
damping cylinder
not tread on damping cylinder M.
3. Do
4. Proceed as described under “BB 1..., BB 2...”.
B as aid when installing the valve. Do not attach steel or nylon slings to
M.
13
14
Installation – continued –
Examples of Installation
incorrectcorrect
Fig. 5
Fig. 6
optimumwith pump
Fig. 7
Fig. 8
Commissioning
BB 1..., BB 2...
Dual-plate check valves BB... do not require special preparations prior to their commissioning. If
the springs or O-rings of the dual-plate check valves BB 1... have been replaced check plugs
positive sealing and, if necessary, retighten them. Please refer to pages 21 to 23 for information on
torques.
If the dual-plate check valves BB... have not been properly positioned in the pipework or are fitted with
unsuitable springs the consequent vibrations and clattering of the plates will give rise to loud noises.
In this case either increase the capacity of the pump or replace the springs by suitable ones. Please
observe the installlation notes.
Do not attach objects to or tread on the damping cylinders M of the dual-plate check valves BB with
dampers.
A for
Operation
BB 1..., BB 2...
If the dual-plate check valves BB... have not been properly positioned in the pipework or are fitted with
unsuitable springs the consequent vibrations and clattering of the plates will give rise to loud noises.
In this case either increase the capacity of the pump or replace the springs by suitable ones. Please
observe the installation notes.
Do not attach objects to or tread on the damping cylinders M of the dual-plate check valves BB with
dampers.
15
16
Maintenance
GESTRA dual-plate check valves BB ... do not require any special maintenance.
However, in certain cases (cf. “Commissioning”) it might be necessary to replace the springs
or O-rings.
Danger
Note that springs are preloaded, which means that they can jump out of the plate body
when the valve is being installed or removed.
This presents the risk of injuries to hands, arms and face.
BB 1... Changing springs and O-rings
12
Dual-plate check valve BB 1...Undo screws, remove springs and withdraw hinge pins.
34
Take out springs, semicircular plates,
support plates and, if fitted, O-rings.
Insert new springs with tension plates and
hinge pins.
Maintenance – continued –
BB 1... Changing springs and O-rings – continued –
56
Insert and tighten screws.Remove tension plates.
7
Install dual-plate check valve BB 1...
Tools
■ Spanner socket A. F. 17, 19, 22, 24 mm to DIN 3124
■ Hexagon socket spanner A. F. 5, 6, 10, 12 mm to ISO 2936
■ Torque spanner 10-60 Nm, 60-120 Nm, DIN ISO 6789
17
18
Maintenance – continued –
Danger
Note that springs are preloaded, which means that they can jump out of the plate body
when the valve is being installed or removed.
This presents the risk of injuries to hands, arms and face.
BB 2... Changing springs
12
Dual-plate check valve BB 2...Undo threaded bolts, turn semicircular plates to the
left.
34
Take out semicircular plates, springs and support
plates.
Remove support plates, cover springs and withdraw
hinge pins.
Maintenance – continued –
BB 2... Changing springs – continued –
56
Insert new springs using tension plates.
Fit hinge pins and support plates.
78
Remove tension plates.
Align support plates.
Insert semicircular plates with springs and support
plates.
19
20
Maintenance – continued –
BB 2... Changing springs – continued –
90
Align semicircular plates. Insert and tighten threaded
bolts.
Tools
■ Spanner socket A. F. 17, 19, 22, 24 mm to DIN 3124
■ Hinged face spanner A. F. 2- 8 mm (for valves with polymer/hard rubber lining)
■ Torque spanner 10-60 Nm, 60-120 Nm, DIN ISO 6789