Fetco CBS-2121 Operators Manual

0 (0)

User’s Guide and Operator Instructions

www.fetco.com

FETCO ZURICHpour over coffee brewer model: CBS-2121

FETCO CBS-2121 ZURICH with decanter warmers

CONTACT INFORMATION

 

 

 

FETCO®

PHONE: (800) 338-2699 (US & CANADA)

 

FOOD EQUIPMENT TECHNOLOGIES COMPANY

(847)

719-3000

 

600 ROSE ROAD

FAX: (847)

719-3001

 

LAKE ZURICH • IL • 60047-0429 • USA

EMAIL: sales@fetco.com

fetco.com

INTERNET: www.fetco.com

techsupport@fetco.com

 

©2016-2018 FOOD EQUIPMENT TECHNOLOGIES COMPANY

P155

APRIL 2018

 

Fetco CBS-2121 Operators Manual

Service Manual – CBS-2121 pour over coffee brewer

Specifications FETCO® pour over coffee brewer

Description & Features

A manually operated coffee brewer-designed for 64 ounce/1.9 liter heated and unheated carafes.

Electrical Configuration CE rated brewers

Configuration Code

 

 

Warmer Positions

 

Voltage

 

kW

 

 

 

 

Amps

 

Electrical Connection

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

C212102

 

 

 

 

 

 

 

None

 

230

 

 

1.93

 

 

 

8.2

 

 

 

CEE7/7 Schuko

C212112

 

 

 

 

 

 

 

Two

 

230

 

 

2.04

 

 

 

8.6

 

 

 

CEE7/7 Schuko

Electrical Configuration North America and International brewers

 

 

 

 

 

 

 

 

 

Configuration

 

Warmer

 

 

 

Voltage

 

 

kW

 

Amps

 

 

 

 

Electrical

 

 

G

 

Code

 

 

Positions

 

 

 

 

 

 

 

 

 

Connection

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

W

 

C212101

 

 

None

 

 

100-120 Volts

 

0.92 - 1.33

 

 

9.2 - 11.1

 

 

 

NEMA 5-15P plug

 

NEMA 5-15P

 

C212111

 

 

Two

 

 

100-120 Volts

 

1.11 - 1.60

 

 

11.1 - 13.3

 

 

 

NEMA 5-15P plug

 

Plug Configuration

 

C212102

 

 

None

 

 

200-240 Volts

 

1.46-2.10

 

 

7.1 – 8.5

 

 

 

CEE 7/7 PLUG

 

 

 

C212112

 

 

Two

 

 

200-240 Volts

 

1.53-2.20

 

 

7.6 – 8.9

 

 

 

CEE 7/7 PLUG

 

 

 

 

 

For 64 ounce brew: time to pour in water-approximately one minute

 

 

 

 

Export Only 250V 16 A

 

 

 

 

 

 

 

Total brew time with final drip out: five minutes

 

 

 

 

 

 

 

 

 

 

“Schuko" CEE 7/7 PLUG

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Weights and Capacities

 

 

 

 

 

 

 

 

 

 

 

 

Dispenser

 

Height

 

Width

 

Depth

 

Water tank

 

Empty

 

Filled

 

Shipping

 

 

 

 

Shipping

Model

 

 

 

 

capacity

 

Weight

 

Weight

 

Weight

 

 

 

Dimensions

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

C212101

 

19 in

7 5/8 in

 

19 in

 

1.4 gallon

 

 

17 lbs

 

28.4 lbs

 

23 lbs

 

 

20¾” X10¾”X 12¼ "

(shown)

 

483mm

194 mm

 

470 mm

 

 

5.2 liter

 

7.7 kg

 

12.9 kg

 

10.4 kg

 

 

524mmX273X540mm

Calibrated

for 64 fl.oz./

 

 

Calibrated for 105g coffee dose

 

 

 

Coffee Filter

 

 

 

 

 

 

1.9 liter carafe

 

 

 

 

 

100-115gram 3.5-4 ounce throw

 

 

 

FETCO # F003 or 9¾” X 4½”

Allow approximately 30 inch/77cm above counter for access to pour in with standard glass carafe

Dimensions

2

P155

APRIL 2018

Installing the CBS-2121 pour over coffee brewer

CAUTION This brewer is shipped with the thermostat turned ON.

DO NOT plug in unit before pouring 3 pots or 192 oz. of water into the opening until brewer is full

(Note step 5, below); damage to the heating element or thermostat may result if started when dry.

Congratulations on your purchase of the new FETCO CBS-2121!

To start up a new unit:

Remove any protective vinyl film-if present, from the stainless steel enclosure. The protective film pulls off.

1. Place coffee brewer on a solid, level counter top, near an electrical outlet. Full brewer and dispensers weighs 28.4 pounds

2.Level the brewer: Use a bubble level and check side-to-side and also front-to-back

Do not plug in the power cord at this time.

3.Place an empty glass decanter on the lower warmer deck, under the brew basket.

4.Insert the empty brew basket into the brew rails of the brewer.

5.Slowly fill the tank with room temperature water through the opening on the top cover until water starts running in a steady stream from the brew basket (3 pots or 192 ounces). This indicates that the tank is full and primed for brewing.

6.Plug the power cord into the electrical outlet.

7.Allow the brewer to heat up to full temperature, indicated by the “READY” light on front panel.

Heat up may take up to 30 minutes for the first time the coffee brewer is plugged in. Slight dripping from the brew basket is normal as water expands when heated. Keep an empty carafe under the brew head to collect any possible drips.

When “READY” light is on.

8.Insert the empty brew basket into the brew rails of the brewer.

9.Place an empty glass decanter on the lower warmer deck, under the brew basket.

10.When “READY” light is on-the CBS-2121 is ready to brew.

For operator safety

This appliance is for commercial use only. Commercial cooking equipment may be unsafe for household use This appliance is intended for stationary indoor use. Installation and service by professional personnel only. Brewer is designed for brewing 64 ounces or 1.9 liters of coffee or tea. Pour in water only

Brewer exterior and carafe warmers are hotkeep hands and other items away.

Brewing water is 200°F do not move commercial coffee brewers once installed due to spillage. WARNING-brew basket contents are hot-use care! Allow brew to complete, usually five minutes Do not immerse the brewer in water or any other liquid

3

P155

APRIL 2018

Loading...
+ 7 hidden pages