Food Equipment Technologies Company
600 Rose Road
Lake Zurich x IL x 60047-0429 x USA
Internet: www.fetco.com
Phone: (800) 338-2699 (US & Canada)
(847) 719-3000
Fax: (847) 719-3001
Email: sales@fetco.com
techsupport@fetco.com
Description & Features
The CBS-2030e and CBS-2030s series feature patented intermittent spray over technology, which works like this:
The following variables are programmed for each batch size:
Brew volume Prewet percent (Percentage of the brew volume)
Brew time Prewet delay (The time between prewetting and the brew cycle.)
Bypass percent
(CBS-2031s & 2032s only)
(Percentage of the brew volume)
Using these variables, the software calculates how much water to use for prewetting and brewing. The total brew
time is divided into several 30 second cycles. Within these cycles, the software calculates how long to spray water
over the coffee grounds, and how long to pause before the next cycle begins.
Drip delay (The time between the end of the brew cycle
and the unlocking of the brew basket.)
Features
All Models: CBS-2031s & CBS-2032s Only:
Two fully programmable batch sizes per side Magnetic brew basket sensor
Adjustable prewetting cycle Brew basket safety locks
Electronically controlled hot water service Adjustable bypass
Brew temperature protection
Specifications
Requirements
Water Requirements:Electrical: See electrical configuration chart.
CBS-2031e/2031s: 20-75 psig, ¼ gpm
CBS-2032e/2032s: 20-75 psig, ½ gpm
* Based on standard factory settings: 4.0 minute brew time; 0% prewet; 200 F water.
3
Dimensions & Utility Connections
CBS-2031e / CBS-2031s
CBS-2032e / CBS-2032s
DWG 201108-000
DWG 201109-000
4
Installation
(For Qualified Service Technicians Only)
Keys To A Successful Installation
If not installed correctly by qualified personnel, the brewer will not operate properly and damage may result.
Damages resulting from improper installation are not covered by the warranty.
Here are the key points to consider before installation:
Electrical:
All FETCO brewers require NEUTRAL. Ground is not an acceptable substitute. Installation without neutral
may cause damage to the electronic components.
The electrical diagram is located on the inside of the lower cover.
The installation must comply with applicable federal, state, and local codes having jurisdiction at your
location. Check with your local inspectors to determine what codes will apply.
Plumbing:
This equipment is to be installed to comply with the applicable federal, state, or local plumbing codes.
The water line must be flushed thoroughly prior to connecting it to the brewer to prevent debris from
contaminating the machine.
Verify that the water line will provide at least ¼ gallon per minute for the CBS-2031, and ½ gallons per
minute for the CBS-2032 before connecting it to the brewer.
General:
Utilize only qualified beverage equipment service technicians for installation. A Service Company Directory
may be found on our web site, http://www.fetco.com.
Installation Instructions
Brewer Setup
1. Review the Dimensions for the unit you are installing. Verify that the brewer will fit in the space intended for it,
and that the counter or table will support the total weight of the brewer and dispensers when filled.
2. The brewer’s legs are shipped inside the brew baskets.
Remove the brew basket(s) and the coffee dispenser(s).
Place the brewer on its back and screw in the legs.
3. Place the brewer on the counter or stand.
4. When the brewer is in position, level it front to back as well
as side to side by adjusting the legs.
5. Remove the lower cover to access the water and electrical connections. Knock-outs are provided in the back
and base of the brewer body for the connections.
Water Connection
1. Water inlet is a 3/8 inch male flare fitting.
2. The brewer can be connected to a cold or hot water line. Cold water is preferred for best coffee flavor, but hot
water will allow for faster recovery times.
3. Install a water shut off valve near the brewer to facilitate service. If an in-line water filter is used, it should be
installed after the water shut off valve and in a position to facilitate filter replacement.
4. Flush the water supply line and filter before connecting it to the brewer.
5. Verify that the water line will provide at least ¼ gallon per minute for the CBS-2031, and ½ gallon per minute
for the CBS-2032, and that the water pressure is between 20 and 75 psig.
Warning: Legs are to be adjusted for
level ing the br ewer only. Do not use
f or height adjustm ent or extend them
higher than necessary.
5
Electrical Connection – US & Canada
1. Verify that the actual voltage at the electrical service connection is compatible with the specifications on the
brewer’s serial number label. Make sure the electrical service includes neutral.
2. The temperature and water tank fill level are pre-set at the factory. There is no need to turn off the heaters
during the installation process. The heaters are disabled by the control board until the tank is full of water. The
heating process will start automatically when the tank has filled.
3. The CBS-2031 is factory equipped with a 120 V cord and plug. The CBS-2032 has only a terminal block for
connecting the incoming power wires. Consult local codes to determine if a cord and plug can be installed, or if
the unit must be hard wired.
4. A fused disconnect switch or circuit breaker on the incoming power line must be conveniently located near the
brewer, and its location and markings known to the operators.
5. The body of the brewer must be grounded to a suitable building ground.
A ground lug is provided in the brewer next to the power terminal block.
Use only 10 gauge copper wire for grounding.
6. Electrical connections must be secured in-place within the unit to meet
War ning : To prevent
electrical shock, this
u nit must be properly
grounded.
national and local standards.
7. Finally, connect the incoming power wires to the terminal block as shown in accordance with applicable codes.
CBS-2031e / CBS-2031s
Can be connected to 120 VAC or 120/208-240 VAC
Factory Configuration
120 VAC, 3 wires
GROUND
L1
N
L2
L2 - NOT USED
Optional Field Conversion*
120/208-240 VAC, 4 wires
Step 1: Remove the factory provided 120 V cord &
Step 2: Connect the incoming wires to the terminal
plug from the terminal block.
block in accordance with applicable codes.
GROUND LUG
L1
N
L2
CORD WITH
NEMA 5-20P PLUG
CBS-2032e / CBS-2032s
Can be connected only to 120/208-240 VAC
GROUND LUG
GROUND
WIRE
120V 120V
GROUND
WIRE
*This procedure must be performed only by a qualified
service technician or electrician.
N
208-240V
Notice: In order for this product to comply with the
requirements of the Underwriters Laboratories listing,
the following conditions apply:
1.) This unit must be hard wired for 120/208-240 VAC.
2.) Once the unit is converted to 120/208-240 VAC
operation, it cannot be converted back to 120
VAC operation.
L1
N
L2
120V 120V
N
208-240V
6
Final Setup
1. Turn on the incoming water supply line and inspect both inside
and outside of the brewer for leaks in all fittings and tubes
2. Turn on the incoming power.
3. Press the brewer’s main power switch, which is hidden behind the
front leg of the brewer. The control panel on/off switch will begin
flashing. Press this switch.
4. Within 6 seconds, the hot water tank will begin filling until the
water is sensed by the probe at the top of the tank. The display will
read “FIL”. The heaters will be disabled by the control board until
the tank is full.
5. While the water is heating, the display will read “LO” and the
actual water temperature will be displayed. After the water has
reached the set temperature, the display will be blank. There is no
“ready” light.
6. Review the Operating Instructions. Brew one full batch (water
only) on each side to confirm proper fill levels. The brewer is
factory set with water only (no coffee) to dispense the correct
amount of water. If the actual volume is slightly different from the
programmed volume, fine tuning the brewer may be necessary.
See #60 – 61 in the Advanced Settings & Diagnostics section.
7. Re-attach the covers after one final inspection for leaks. Look
closely in the top of the brewer at the dispense fittings during this
inspection.
Operator Training
Review the operating procedures with whoever will be using the
brewer. Pay particular attention to the following areas:
1. Always pre-heat the dispensers before the first use of each day by
filling them half way with hot water, and letting them stand for at
least 15 minutes.
2. Don't remove the brew basket until it has stopped dripping.
3. Make sure the dispenser is empty before brewing into it.
4. Show how to attach covers, close, and or secure the thermal
dispensers for transporting.
5. Show the location and operation of the water shut off valve as well
as the circuit breaker for the brewer.
6. Steam from the tank will form condensation in the vent tubes. This
condensation will drip into and then out of the brew baskets. 1/4
cup discharging overnight is possible. Place an appropriate
container under each brew basket when not in use.
7. We recommend leaving the power to the brewer on overnight. The
water tank is well insulated and will use very little electricity to
keep the tank hot. Leaving the brewer in the on position will also
avoid delays at the beginning of shifts for the brewer to reach
operating temperature.
7
Operating Instructions
Control Panel Functions
Only switches that are active are illuminated.
Switches that are inactive or disabled are invisible.
X Main Power Switch
Controls all power to brewer
Indicator lamp at top of panel.
Y Control Panel On/Off Switch
Affects only control panel. Does
not disconnect main power.
Flashing = Off
Lit = On
Invisible = Main Power Off
Z Display
”FILL” = Water tank is filling.
”LO XXX” = Unit is heating, not
ready to brew. (XXX = actual
temperature.)
Blank = Ready to brew.
Also displays error messages.
[ Stop Switches
Stops brew cycle
Lit = Brew cycle in progress
Invisible = Not brewing, or dripping
in progress
\Brew Switches
Starts brew cycle
Must be held in for 1 second
Flashing = Brew cycle in progress
Lit = Ready to brew
Invisible – Not ready to brew, or
batch disabled
(See Programming Section)
]Hot Water Switch
Dispenses hot water from faucet
Hold in to dispense
Brewing
1. Turn the main power switch and control
panel switch on.
2. Prepare a brew basket with the correct size
filter and appropriate amount of coffee.
3. Slide the brew basket completely into the
rails.
4. Place a clean, empty, preheated dispenser
under the brew basket.
5. Select a batch from the available choices,
and hold the corresponding BREW button in
for 1 second to start the brew cycle.
6. The STOP button will illuminate, and the
selected BREW button will flash, indicating
that brewing is in progress. All other BREW
buttons will extinguish.
7. When the brew cycle is finished, the STOP
button will extinguish and the BREW button will
continue flashing, indicating that coffee may still
be dripping from the bottom of the brew basket.
8. Before removing the brew basket or dispenser,
visually verify that dripping has stopped.
Notes:
Preheat dispenser by filling at least ½ full with
water at brewing temperature. Allow it to sit for
at least 15 minutes before draining.
8
Loading...
+ 17 hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.