Contents
1 About this guide............................................................................................................................................. 4
Related documents............................................................................................................................................................4
Information symbols...........................................................................................................................................................4
2 Site preparations........................................................................................................................................... 6
Site selection.......................................................................................................................................................................6
System ground....................................................................................................................................................................7
Fans and airow..................................................................................................................................................................7
Fan combinations......................................................................................................................................................... 7
3 S4100–ON Series installation........................................................................................................................ 9
Unpack the system............................................................................................................................................................9
Rack or cabinet installation..............................................................................................................................................10
Rack mount safety considerations........................................................................................................................... 10
1U Tool-less mount installation.........................................................................................................................................11
S4100-ON Series system installation............................................................................................................................. 15
System power-up............................................................................................................................................................. 18
Power up sequence....................................................................................................................................................18
After system installation...................................................................................................................................................18
This guide provides site preparation recommendations, step-by-step procedures for rack mounting and desk mounting, inserting modules,
and connecting to a power source.
CAUTION: To avoid electrostatic discharge (ESD) damage, wear grounding wrist straps when handling this equipment.
WARNING: Only trained and qualied personnel can install this equipment. Read this guide before you install and power up this
equipment. This equipment contains two power cords. Disconnect both power cords before servicing.
WARNING: This equipment contains optical transceivers, which comply with the limits of Class 1 laser radiation.
1
Figure 1. Class 1 laser product tag
WARNING: When no cable is connected, visible and invisible laser radiation may be emitted from the aperture of the optical
transceiver ports. Avoid exposure to laser radiation. Do not stare into open apertures.
Topics:
•Related documents
•Information symbols
Related documents
For more information about the S4100–ON Series, see the following documents:
•Dell Networking OS10 Enterprise Edition User Guide
•Dell Networking S4100–ON Series Setup Guide
•Dell Open Networking Hardware Diagnostic Guide
•Dell S4100–ON Series Release Notes
NOTE
: For the most recent documentation, visit Dell Support: www.dell.com/support.
Information symbols
This book uses the following information symbols:
NOTE
: The Note icon signals important operational information.
CAUTION: The Caution icon signals information about situations that could result in equipment damage or loss of data.
4About this guide
WARNING: The Warning icon signals information about hardware handling that could result in injury.
WARNING: The ESD Warning icon requires that you take electrostatic precautions when handling the device.
About this guide5
Site preparations
The S4100–ON Series is suitable for installation as part of a common bond network (CBN).
You can install the system in:
•Network telecommunication facilities
•Data centers
•Other locations where the National Electric Code (NEC) applies
For more information about the S4100–ON Series specications, see Specications.
NOTE: Install the S4100–ON Series switch into a rack or cabinet before installing any optional components.
Topics:
•Site selection
•Cabinet placement
•Rack mounting
•System ground
•Fans and airow
•Power
•Storing components
2
Site selection
Install Dell equipment in restricted access areas.
A restricted access area is one where service personnel can only gain access using a special tool, lock, key, or other means of security. The
authority responsible for the location controls access to the restricted area.
Ensure that the area where you install your S4100–ON Series switch meets the following safety requirements:
•Near an adequate power source. Connect the system to the appropriate branch circuit protection according to your local electrical
codes.
•Environmental—switch location—continuous temperature range is from 50° to 104°F (from 5° to 40°C).
•Operating humidity is from 5 to 85 percent noncondensing, continuous.
•In a dry, clean, well-ventilated, and temperature-controlled room, away from heat sources such as hot cooling vents or direct sunlight.
•Away from sources of severe electromagnetic noise.
•Positioned in a rack or cabinet, or on a desktop with adequate space in the front, back, and sides for proper ventilation and access.
For more information about switch storage and environmental temperatures, see Specications.
Cabinet placement
Install the S4100–ON Series only in indoor cabinets designed for use in a controlled environment.
Do not install the S4100–ON Series in outside cabinets. For cabinet placement requirements, see Site selection.
6Site preparations
The cabinet must meet minimum size requirements. Airow must be in accordance with the Electronic Industries Alliance (EIA) standard.
Ensure that there is a minimum of 5 inches (12.7 cm) between the intake and exhaust vents and the cabinet wall.
Rack mounting
When you prepare your equipment rack, ensure that the rack is grounded. Ground the equipment rack to the same ground point the power
service in your area uses. The ground path must be permanent.
System ground
Dell recommends grounding your system. Use the S4100–ON Series switch in a CBN.
Fans and airow
The fans on the S4100–ON Series support two airow options: normal and reverse.
Fan combinations
Fan installation is done as part of the factory install based on SKU type. The S4100–ON Series has stock keeping units (SKUs) that support
the following congurations:
•AC PSU with fan airow from the I/O to the PSU—normal
•AC PSU with fan airow from the PSU to the I/O—reverse
•DC fan unit with airow from the I/O to the PSU—normal
•DC fan unit with fan airow from the PSU to the I/O—reverse
Be sure to order the fans suitable to support your site’s ventilation. Use a single type of airow fan in your system. Do not mix reverse and
normal airows in a single S4100-ON Series switch.
For proper ventilation, position the S4100–ON Series switch in an equipment rack or cabinet with a minimum of 5 inches (12.7 cm) of
clearance around the exhaust vents. The fan speed varies based on internal temperature monitoring. The S4100–ON Series never
intentionally turns o the fans.
Power
To connect the switch to the applicable power source, use the appropriate power cable. An AC power cable is included with the system.
When installing AC or DC systems, follow the requirements of the National Electrical Code ANSI/NFPA 70, where applicable.
The system is powered-up when the power cable is connected between the system and the power source.
CAUTION
CAUTION: On the AC system, use the power supply cable as the main disconnect device. Ensure that the socket-outlet is
located/installed near the equipment and is easily accessible.
NOTE: Module power is software controlled. You do not see module LEDs when the system powers up in ONIE.
: Always disconnect the power cable before you service the power supply slots.