Daikin Modular L Smart Operation manuals

Installation, use and maintenance manual
Modular L Smart
Modular L Smart
Translation of the original instructions
Modular L Smart heat recovery units guarantee high quality indoor air at low energy costs. The range consists of six sizes, customisable by adding external modules.
Armed with an extremely flexible development, Daikin air handling units are able to satisfy all types of technical requirements.
Daikin systems guarantee respect for the environment since they are based on high levels of energy efficiency. Reduced ecological impact and low energy consumption make Daikin recovery units ideal for any type of market.
Contents
Assembly instructions
Important warnings 4
Purpose of the manual
Intended use of the machine
Safety regulations
Residual risks
Safety devices
Machine characteristics 10
Environmental conditions
Environmental contamination
Noise
Ceiling and air duct specifications
Technical data
Preheating external coil
Monitoring each filter stage pressure drop
Summary of machine operation
4 4 5
8
9
10 10 10 11 12 12 13 15
Receipt of the cartons 16 Transport 17 Unpacking and verification of integrity
After unpacking 18 Product nomenclature 19 Storage waiting for installation 20
18
Installation 21
Installation procedure 21
Commissioning 29
Configuration 29 Modular L Smart performance curves 37 About the user interface 45
Maintenance 52
Safety precautions for maintenance 52 Ordinary maintenance 53 Extraordinary maintenance 58 Diagnostics 61 Troubleshooting table 62 Optional connection 63 Repair log 71
1
Important warnings
The pictogram shows a situation of immediate danger or a dangerous situation that might cause injuries or death.
The pictogram shows that it is necessary to adopt suitable behaviour in order to avoid jeopardising staff safety and cause damages to the equipment.
The pictogram shows particularly important technical information that should be taken into consideration by the people installing or using the equipment.
Purpose of the manual
The purpose of this manual is to guide the installer and qualified operator in the installation, maintenance and proper and safe use of the equipment. For this reason, it is mandatory for all
personnel involved in installation, maintenance and supervision of the machine to read this manual.
Contact the manufacturer if any points are unclear or difficult to understand.
This manual contains information regarding:
- Technical specifications of the machine.
- Instructions for transport, handling, installation and assembly.
- Use.
- Information for instructing personnel authorised for its use.
- Maintenance activities.
All information refers in general to any unit of the Modular L Smart ranges. All the units are shipped together with a technical schematic indicating the specific weight and size of the machine received. It must be considered an integral part of this manual and therefore it must be kept with the utmost care in all its parts.
If the manual or drawings are lost, please request a new copy from the manufacturer, specifying the unit serial number as specified on the label on the unit.
In the case of divergent information between this manual and the schematic, the schematic will prevail.
Intended use of the machine
This appliance has the function of treating the air intended to condition civil and industrial environ­ments. Any other use is not in accordance with the intended use and therefore dangerous.
These ranges of units are designed for use in NON-explosive environments. For installation in potentially explosive environments, the manufacturer can design and manufacture suitable machines
(anti-explosion) that will be identified by the mark .
If the machine is used in critical situations, by type of system or environmental context, the customer must identify and adopt the technical and operational measures to avoid damage of any kind.
4
Safety regulations
Skills required for the installation of the machine
Installers must perform operations according to their professional qualifications: all activities not within one's expertise
(i.e. electrical connections) must be carried out by specialised and qualified staff so as not to endanger one's safety and the safety of the other operators interacting with the machine.
Transport and equipment handling operator: authorised person with recognised expertise in using transport
and lifting equipment.
Technical installer: expert technician, sent or authorized by the manufacturer or its representative, with adequate
skills and training to install the machine.
Assistant: technician subject to care obligations while lifting and assembling the equipment. He must be suitably
trained and informed about the operations to perform and the safety plans of the site/installation location.
In this manual, the technician competent to carry out each operation is specified.
Skills required for the use and maintenance of the machine
Generic operator: AUTHORISED to run the machine using commands placed on the keypad of the electrical control
panel. Performs only machine control operations, power on/off.
Maintenance mechanic (qualified): AUTHORISED to carry out maintenance, adjustments, replacement and repair
of mechanical parts. It must be a person competent in mechanical systems, therefore able to perform mechanical maintenance in a satisfactory and safe manner, must possess theoretical preparation and manual experience. NOT AUTHORISED to work on electrical systems.
Manufacturer's technician (qualified): AUTHORISED to perform complicated operations in every situation.
Operates in accordance with the user.
Maintenance electrician (qualified): AUTHORISED to perform service of an electric nature, adjustments,
maintenance and electrical repairs. AUTHORISED to operate in the presence of an active electrical connection inside the control panels and junction boxes. It must be a person competent in electronics and electrical engineering, therefore able to work on electrical systems satisfactorily and safely, must possess theoretical knowledge and proven experience. NOT AUTHORISED to work on mechanical systems.
Installers, users and maintenance technicians may NOT operate on the machine if:
- they are not experienced or responsible or if they are minors;
- they have a physical disability or are not in perfect physical/psychological condition;
- they are not skilled in managing the machine operating cycle;
- they have not taken part in theoretical/practical preparation training alongside an expert machine operator or controller, or alongside one of the manufacturer’s technicians.
In this manual, the technician competent to carry out each operation is specified.
5
Read this manual carefully before machine installation and maintenance and keep it for any
further future consultation by the various operators. Do not remove, tear out or rewrite any part of this manual.
All installation, assembly, electrical connections and standard/non-standard maintenance must be carried out solely by technicians who comply with legal requirements, only after turning off the power supply to the unit, and only using personal protective equipment (e.g. gloves and protective eyewear), in compliance with the standards in force in the country where the unit is used, and in compliance with the regulations on systems and safety in the workplace.
Installation, use or maintenance other than those specified in the manual may cause damage,
injury or death, invalidate the warranty and relieve the Manufacturer of any liability.
Use protective clothing and suitable equipment while handling or installing the equipment, in
order to prevent accidents and safeguard your own and other people's safety. Individuals not assigned to installation or maintenance are NOT allowed to stand or pass through the work area while the machine is assembled.
Disconnect the equipment from the mains before installing or maintaining it.
Before installing the equipment, check that the systems comply with the legal provisions in
force in the country of use and meet the specifications on the serial number plate.
It is the responsibility of the user/installer to check the static and dynamic stability relative to
the installation and to arrange environments so that people who are not competent or authorised DO NOT have access to the machine or to its commands.
It is the responsibility of the user/installer to make sure that weather conditions do not affect
the safety of persons and property during installation, use and maintenance.
Make sure the air intake is not located near any exhausts, flue-gases or other contaminating
elements.
Do not install the equipment in places exposed to strong winds, salt air, open flames or
temperatures exceeding 40°C (104°F).
After installation is complete, instruct the user on the correct use of the machine.
If the equipment does not work or functional or structural alterations are noted, disconnect
it from the mains and contact a service centre authorised by the Manufacturer or Retailer, without attempting to repair it on your own. For any replacements request the use of original spare parts.
Unauthorised actions, tampering or modifications that do not follow the information provided
in this manual can cause damage, injuries or fatal accidents and void the warranty.
The serial number plate on the unit provides important technical information, essential in case
6
of machine maintenance or repairs. We recommend that you do not remove, damage or modify it.
In order to ensure correct and safe conditions of use, it is recommended to have the unit
maintained and checked at least annually by a service centre authorised by the manufacturer or dealer.
Failure to follow these instructions may cause damage and injuries, even fatal, voids the
warranty and relieves the Manufacturer of any liability.
7
Residual risks
Despite having implemented and adopted all the safety measures indicated by applicable regulations, some residual risks remain. In particular, in some operations of replacement, adjustment and tooling max­imum attention is always required in order to work in the best possible conditions.
List of operations with residual risks
Risks for qualified personnel (electrician and mechanic)
- Handling - during unloading and handling it is necessary to pay attention to all the steps listed in this manual regarding the points of reference
- Installation - during installation it is necessary to pay attention to all the steps listed in this manual regarding the points of reference The installer must ensure the static and dynamic stability of the machine's site of installation.
- Maintenance - during maintenance it is necessary to pay attention to all the steps listed in this manual, and in particular to high temperatures that may be present in the heat transfer fluid lines to/from the unit.
- Cleaning - the machine must be cleaned only when it is switched off, by turning off the switch installed by the electrician and the switch located on the unit itself. The key for interrupting the power supply must be kept by the operator until the end of the cleaning operations. Internal cleaning of the machine must be carried out using the protections required by current regulations. While the inside of the machine does not contain particular hazards, it is necessary to pay the utmost attention so that accidents do not occur during cleaning. The heat exchange coils that have a potentially sharp finned pack must be cleaned using protective glasses and gloves suitable for handling metals.
During adjustment, maintenance and cleaning there are residual risks of variable entity. Being operations that must be performed with guards disabled, it is necessary to pay particular attention in order to avoid damage to persons and things.
Always pay close attention when performing the operations specified above.
Remember that these operations must always be performed by authorised personnel. All work must be completed in accordance with the legal provisions relating to work safety. Remember that the unit in question is an integral part of a larger system that includes other components, depending on the final characteristics of realisation and the mode of use. Therefore in the end it is the responsibility of the user and assembler to assess the residual risks and their respective preventive measures.
8
Safety devices
The machine is equipped with safety devices to prevent risks of damage to persons and for
proper operation. Always pay attention to the symbols and safety devices on the machine. It should only operate with the safety devices engaged and with fixed or movable guards installed correctly and in the proper position.
If during installation, use or maintenance the safety devices have been temporarily removed
or disabled, the machine can be operated exclusively by the qualified technician who made this change. It is mandatory to prevent other people's access to the machine. When finished, restore the devices to their proper status as soon as possible.
9
2
Machine characteristics
Environmental conditions
Modular L Smart heat recovery units are designed for use in indoor environments, installed on the ceiling. The unit cannot operate in environments containing explosive material and with a high concentration of dust.
Outside air temperature
- 5° + 46°c without pre heating heating coil
- 25°C + 46°C with pre heating electric coil for size 04 & 06
- 20°C + 46°C with pre heating electric coil for size 02 & 03 &05 &07
Operating environment temperature Temperature of the environment with the ma-
chine off (e.g., storage, transport, etc.)
Thanks to its modularity, each machine is able to adapt to different needs in terms of air flow and thermodynamic treatments.
The optimised choice of every detail, the search for maximum efficiency in each component, the adoption of specific materials and constructive solutions transform
environment friendliness and energy savings into valid and advanced technological solutions.
+5°C to +46°C
-40°C to +60°C
Environmental contamination
Depending on the installation operating environment, specific regulations must be followed and all the necessary precautions must be taken to avoid environmental issues (a system that operates in a hospital or chemical environment can have problems different from those in other sectors, even from the point of view of disposal of consumable parts, filters, etc.). It is mandatory for the buyer to inform and train workers regarding proper procedures.
Noise
The machines have been designed and manufactured in such a way as to produce sound
> 80 dB(A)
during the machine's actual use.
10
emissions below the threshold of 80 dB(A). It should be noted that every environment has its own acoustic characteristics that can greatly affect the noise perceived during operation, therefore it is necessary to consider the noise data provided as a point of reference, while it is up to the buyer to perform specific sound level measurements at the installation site and
Ceiling and air duct specifications
The ceiling where you plan to install the machine must be:
- Perfectly flat and without roughness.
- Vibration resistant.
- Able to support the weight of the equipment considering an appropriate safety margin (see table of technical data on page
12).
The equipment installed on the ceiling can adapt easily to the presence of a false ceiling. In fact, without sufficient space for up-and-over door opening, the inspection door can be transformed into a panel able to slide on accessory rails (optional) If provided, the air ducts must be connected directly to the machine, taking care to insert a suitable anti-vibration system between the machine itself and the duct. When assembly is completed they must not be taut, in order to avoid damage and transmission of vibrations. To ensure the seal of the connections and the integrity of the machine, it is essential that the air ducts be supported by special brackets that do not weigh directly on the machine.
11
Technical data
TECHNICAL DATA TABLE
SIZE
2 3 4 5 6 7
Nominal air flow rate
m3/h
Heat efficiency % FLA FLI
W
Electrical connection
WEIGHT TABLE
Gross weight with packaging Device weight Door weight Filter weight Fan weight Recuperator weight Tank panel weight
kg
kg
kg
kg
kg
kg
kg
300 600 1200 1500 2300 3000
93 93 93 92 94 93
A
2.80 4.50 4.50 4.70 8.90 9.30
371 1033 1033 1033 2033 2033
200-277 V, 1 ph
SIZE
2 3 4 5 6 7
135 190 285 295 370
125 180 270 280 355
2x10,0 2x12,0 2x18,0 2x18,0 2x22,0
2x0,2 2x0,3 2x0,5 2x0,5 2x0,5
2x2,5 2x8,5 2x8,5 2x9,0 4x8,5 4x9,0
1x9,0 1x14,0 2x15,0 2x15,0 2x24,0 2x24,0
1x13,0 1x16,0 1x24,0 1x24,0 1x29,0 1x29,0
375
360
2x22,0
2x0,5
Preheating external coil
Kindly make sure that the frontal velocity through the preheating element is maintained above 1.5 m/s for safety reasons. Make sure to connect both drain pan outlet to the drainage circuit. A common drainage can be used for both drain outlets.
Electric panel
2%
Condensation discharge
12
The machine must be tilted by approximately 2% of the width (B) (lifting it towards the electric panel)
1
Monitoring each filter stage pressure drop
It is possible to monitor the pressure drop of each filtering stage by connecting 4 differential pressure gauges as shown in the figures below. In tal modo l’unità è conforme alla norma VDI6022
+
+
-
+
-
+
-
-
13
B
A
C
F
TECHNICAL DATA
TABLE
D
H
ø14 mm
ø14 mm
ø14 mm
E
G
160 mm
80 mm
SIZE
2 3 4 5 6 7
Length (A) mm Width (B) mm Height (C) mm Hole distance (D) mm Hole distance (E) mm F (up-and-over doors)
mm 630 670 675
1660 1800 2000 2000 2000 2000
920 1100 1600 1600 2000 2000
280 350 415 415 500 500
1380
976 1156 1656 2056
F (sliding doors) mm 70 G mm 500 H mm 300
14
Summary of machine operation
2
5
4
A
3
6
C
D
1
B
1
air flow in a machine with orientation to the left
2
Filter and pre-filter
1
Exchanger by-pass
2
Heat exchanger
3
Delivery motor-driven fan group
4
Delivery motor-driven fan group
5
Intake motor-driven fan group
6
Pos. Component name Construction material
Supply air
A
Internal air
B
Exhaust air
C
Air from outside
D
1 Filter galvanised steel frame, fibreglass filter unit 2 Bypass aluzinc 3 Heat exchanger aluminium 4 Fan motor assembly size 2: composite board frame and impeller
size 3,4,5,6,7: steel frame, composite board impeller
5 Brackets galvanised steel
15
3
The means and method of transport must be chosen by the transport operator according to the type, weight and size of the machine. If necessary, draw up a "safety plan" to guarantee the safety of the people directly involved.
Receipt of the cartons
Handle the equipment following the Manufacturer's instructions on the packaging and in this manual. Always use personal protective equipment.
Upon receipt of the machine check the integrity of the packaging and the amount of parcels sent:
A) There is visible damage/one or more cartons is missing: do not install, but promptly notify the Manufacturer and the carrier that made the delivery. Alternatively you can accept the shipment "subject to verification": this will make it possible to open the cartons and check if the internal components are indeed damaged. In the latter case, as noted previously, promptly notify the Manufacturer and the carrier that made the delivery. Before opening the cartons, it is recommended to take good quality pictures to document the damage.
B) There is NO visible damage: move the machine to the site of installation.
16
4
sudden movements.
Transport
Packages can be handled with a pallet truck of suitable capacity or with a forklift. The choice of the most suitable means and method lies with the operator.
The operating area must be perfectly free from objects or people not involved in the transport.
If transport is done using a pallet truck make sure it is suitable for the weight and size of the machine. Insert the forks into the points provided for handling (usually in a central position) so as to keep the centre of gravity of the load in balance. Move the equipment carefully, avoiding
OK!
OK!
17
A
5
Unpacking and verification of integrity
We recommend the equipment be unpacked after moving it to its installation location and only when it is to be installed. This operation must be performed using personal protection equipment (i.e., gloves, safety shoes, etc.).
Do not leave the packing unattended: it is potentially harmful to children and animals (suffocation hazard).
Some packing materials must be kept for future use (wooden crates, pallets, etc.), while those that cannot be reused (i.e., polystyrene, strapping, etc.) must be disposed of in compliance with the regulations in force in the country of installation: this will protect the environment!
After unpacking
After unpacking, check the received contents:
- Installation and maintenance manual (IOM)
- Wiring diagram
- Declaration of conformity
Check therefore that you have received all the components and that they are undamaged In case of damaged or missing parts.
- Do not move, install or repair damaged components and the machine in general.
- Take quality photos to document the damage.
- Find the serial number plate on the machine and note the machine's serial number.
- Immediately notify the carrier that delivered the machine.
- Promptly contact the Manufacturer (keep on hand the serial number of your machine).
Please note that complaints or claims of damage reported after 10 days of receipt of the machine cannot be accepted.
A: Manufacturer’s name and data
Codifica
HU
Product number
Matricola Serial number
Mandata Supply Fan
MESSA IN FUNZIONE
All’avviamento consultare il manuale operavo e controllare:
1) senso di rotazione del venlatore
2) l’assorbimento del motore, il quale non deve superare il valore di targa sopraindicato
D
ALB07LBMNADBT00 A83665
ALB07LBSNADBT00
I
18C0144
PORTATA ARIA /AIR FLOW
3000
F
Corrente / Current
Tensione / Voltage 230V/1Ph/50-60Hz
DAIKIN APPLIED EUROPE S.p.A
Via Piani di Santa Maria, 72 00040 Ariccia - (ROMA) IT
A
Data Date
m3/h
H
START UP
Before the start up read carefully the operang instrucon manual and check
1) fan rotaon direcon
2) the current input must not exceed the value menoned on the above tag
MADE IN ITALY
POS Code
E
Peso
4/2018 373
Weight
B
Ripresa Return Fan
G
9.3 A
C
m3/h
B: CE markings C: Machine weight D: Code and POS E: Date of manufacture F: Supply airow rate G: Delivery airow rate H: Electrical specications (frequency, number of
phases, absorption in plate conditions)
I: Machine serial number
MANUFACTURER INFORMATION: DAIKIN APPLIED EUROPE S.P.A. Via Piani di Santa Maria, 72 - 00040 Ariccia (Roma) - Italy Tel: (+39) 06 93 73 11 - Fax: (+39) 06 93 74 014 http://www.daikinapplied.eu
18
Product nomenclature
A L B 07 L B M N A D B T 0 0
A AHU
L Modular L
B Main module
02 Size 02 03 Size 03
......
07 Size 07
R right installation L left installation
B release
M advanced controller solution S smart controller solution
E internal electric post heating coil W internal water post heating coil N no internal post heating coil
A aluminium recuperator M membrane recuperator
A Supply filter G4 B Supply filter M5 D Supply filter F7 E Supply filter F9
A Delivery filter G4 B Delivery filter M5 D Delivery filter F7 E Delivery filter F9
T Double panel thickness 50mm, mineral wool
insulation, pre-painted exterior and Aluzinc interior
0.... Production site
0.... Version
Modular L will be produced according to customer needs. However, we still designed a standard version indicated by only 7 digits ALB01R(L) B version. and that uniquely identifies a right/left machine, aluminium counter-current exchanger, double 50mm panel, with Smart controller, no internal post heating coil, F7 at supply, M5 at return Milan factory, version 0.
19
Storage waiting for installation
Waiting for the installation, the components of the machine and the relative documents must be stored in an area that:
- Is dedicated exclusively to the storage of the components.
- Is covered and protected from the weather (preferably prepare a closed area), with adequate temperature and humidity.
- Is accessible only to operators tasked with the assembly.
- Can support the weight of the equipment (check the load rating) and has a stable floor.
- Is free from other components, especially if they are potentially explosive/incendiary/toxic.
If you cannot proceed with the installation straight away, check periodically that the above-men­tioned conditions of the storage area are maintained and cover the machine with a canvas.
While waiting for the finale installation, always provide an insulating base (e.g., wood blocks) between the floor and the machine itself.
Correct storage awaiting installation
3
Any movement carried out after unpacking must be done with the doors closed. Do not move the units by pulling on the doors, if present, the uprights or other protruding parts that are not an integral part of the structure.
5÷35°C
20
Do not step on the units!
2A
6
Installation
All installation, assembly, electrical connections to the mains and extraordinary maintenance
must be performed only by qualied personnel authorised by the Retailer or Manufacturer, in compliance with the regulations in force in the country the equipment is to be used and the standards on the systems and safety in the workplace.
During installation, the area must be free from people
and objects not used for the assembly.
Before starting, make sure you have all the necessary
equipment.
Use only equipment that is in good condition and
undamaged.
Installation procedure
Before installation, read the safety instructions on the first pages of this manual. Contact the Manufacturer if any points are unclear or not perfectly understandable. A check mark next to each step will help to confirm complete and proper installation.
Step 1: Mark the drilling points .............................................................................................................................. page 22
Step 2: Make the connections ................................................................................................................................ page 24
Step 3: Perform a trial run .......................................................................................................................................... page 27
Step 4: Safety signs .........................................................................................................................................................page 28
After installation store this manual and the assembly sheet that accompanied the machine in a place that is dry and clean. This way it will be accessible to operators in the future who need to consult it. Do not remove, tear out or write on any part of this manual besides the space set aside for notes:
Step 0: Lift the unit to the ceiling
Lift the unit up to the ceiling.
To facilitate the operations of lifting and to ensure the safety of the installers, we recommend the
use of extensible pantograph lifts of the appropriate type and dimensions for the weight and size
of the unit to be installed. During lifting protective apparel must be worn to prevent injury, and individuals not assigned to installation or maintenance are NOT allowed to stand or pass through the work area.
21
Step 1: Mark the drilling points
Make sure that the ceiling where you plan to install the machine is:
- Vibration resistant.
- Able to support the weight of the equipment (see table of technical data on page 12).
The installation site must also include (fig. 4):
• An electrical system compliant with current regulations and with specifications that meet the needs
of the machine;
a coolant gas connection (in the case of connection to coils supplied by gas).
• A drain pipe with drain siphon connected to the sewerage system.
• An aeraulic system (ducts for the air to be conveyed to the environments).
Drill ø14 mm holes at the machine anchor holes Insert the appropriate anchors, lift the machine and fasten it using only the brackets and screws supplied. Make sure to connect both drain pan outlet to the drainage circuit. A common drainage can be used for both drain outlets.
Electric panel
The machine must be tilted by approximately 2% of the width (B) (lifting it towards the electric panel)
4
A
(see “technical specifications” table on page 13).
Electric panel
2%
Condensation discharge
22
Ceiling drilling
5
A
x4
Install a shockproof rubber hose.
Ceiling drilling
6
While lifting and fastening the unit it is mandatory to use protective clothing and
suitable equipment, in order to prevent accidents and safeguard your own and other people's safety. The fastening equipment should be dimensioned according to unit weight.
Individuals not assigned to the installation are NOT allowed to stand or pass through the work area during assembly.
To facilitate the operations of lifting and to ensure the safety of the installers, we
recommend the use of extensible pantograph lifts of the appropriate type and dimensions for the weight and size of the unit to be installed.
23
Loading...
+ 53 hidden pages