Allied Telesis AT-iMG646PX-ON, AT-EN646 User Manual

Enclosure and Intelligent Multiservice Gateways
AT-EN646
AT-iMG646BD-ON AT-iMG646PX-ON
Installation Guide
613-000287 Rev D
trademark of Netscape Communications Corporation. All other product names, company names, logos or other designations mentioned herein are trademarks or registered trademarks of their respective owners.
Allied Telesis, Inc. reserves the right to make changes in specifications and other information contained in this document without prior written notice. The information provided herein is subject to change without notice. In no event shall Allied Telesis, Inc. be liable for any incidental, special, indirect, or consequential damages whatsoever, including but not limited to lost profits, arising out of or related to this manual or the information contained herein, even if Allied Telesis, Inc. has been advised of, known, or should have known, the possibility of such damages.

Electrical Safety and Emissions Standards

This product meets the following standards.
U.S. Federal Communications Commission
Declaration of Conformity
Manufacturer Name: Allied Telesis, Inc.
Declares that the product(s): Multiservice Gateways
Model Numbers: AT-iMG646BD-ON, AT-iMG646PX-ON
This product complies with FCC Part 15B, Class B Limits:
This device complies with part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This device must not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation.
Radiated Energy
Note: This equipment has been tested and found to comply with the limits for a Class B digital device pursuant to Part 15 of FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This equipment generates, uses and can radiate radio frequency energy and, if not installed and used in accordance with instructions, may cause harmful interference to radio or television reception, which can be determined by turning the equipment off and on. The user is encouraged to try to correct the interference by one or more of the following measures:
- Reorient or relocate the receiving antenna.
- Increase the separation between the equipment and the receiver.
- Connect the equipment into an outlet on a circuit different from that to which the receiver is connected.
- Consult the dealer or an experienced radio/TV technician for help.
Changes and modifications not expressly approved by the manufacturer or registrant of this equipment can void your authority to operate this equipment under Federal Communications Commission rules.
Industry Canada
This Class B digital apparatus complies with Canadian ICES-003.
Cet appareil numérique de la classe B est conforme à la norme NMB-003 du Canada.
RFI Emissions FCC Class B, EN55022 Class B, EN61000-3-2, EN61000-3-3,
VCCI Class B, C-TICK, CE
Immunity EN55024
Electrical Safety UL 60950 (
TUVUS)
C
3

Translated Safety Statements

Important: The indicates that a translation of the safety statement is available in a PDF document titled “Translated Safety Statements” posted on the Allied Telesis website at www.alliedtelesis.com.
4

Contents

Preface ............................................................................................................................................................ 11
Safety Symbols Used in this Document ........................................................................................................... 12
Where to Find Web-based Guides ................................................................................................................... 13
Contacting Allied Telesis .................................................................................................................................. 14
Online Support ........................................................................................................................................... 14
Email and Telephone Support.................................................................................................................... 14
Returning Products .................................................................................................................................... 14
For Sales or Corporate Information............................................................................................................ 14
Warranty..................................................................................................................................................... 14
Management Software Updates ....................................................................................................................... 15
Chapter 1: Overview ...................................................................................................................................... 17
Features ........................................................................................................................................................... 18
LEDs................................................................................................................................................................. 21
Section I: Outdoor Installation ................................................................................ 23
Chapter 2: Outdoor Installation Overview ................................................................................................... 25
Enclosure.......................................................................................................................................................... 26
Installation Options ........................................................................................................................................... 27
Chapter 3: Installing the Enclosure ............................................................................................................. 29
Reviewing Safety Precautions.......................................................................................................................... 30
Required Tools and Supplies ........................................................................................................................... 32
Tools .......................................................................................................................................................... 32
Additional Supplies..................................................................................................................................... 32
Mounting the Enclosure.................................................................................................................................... 33
Installing the Grounding Plate .......................................................................................................................... 35
Installing the Fiber Optic Drop Cable................................................................................................................ 36
Installing the Dielectric Drop Cable ............................................................................................................ 36
Securing the Fiber Optic Drop Cable................................................................................................... 36
Installing the Ground Wire ................................................................................................................... 38
Securing the Tracer Wire and Aramid Yarn......................................................................................... 39
Installing the Armored Drop Cable ............................................................................................................. 40
Installing the Ground Wire ................................................................................................................... 43
Splicing the Drop Cable and Securing the Fusion Splice Tray......................................................................... 44
Using the Two-Part Metal Splice Tray........................................................................................................ 44
Using the Plastic Splice Tray ..................................................................................................................... 48
Chapter 4: Installing the Gateway Outdoors ............................................................................................... 51
Reviewing Safety Precautions.......................................................................................................................... 52
Required Tools and Supplies ........................................................................................................................... 54
Tools .......................................................................................................................................................... 54
Additional Supplies..................................................................................................................................... 54
Installing the Gateway ...................................................................................................................................... 55
Installing the Gateway in the Enclosure ..................................................................................................... 55
5
Contents
Preparing and Connecting the Power Cord................................................................................................ 58
Mounting the Splice Tray on the Gateway.................................................................................................. 60
Connecting the Fiber Optic Cable .............................................................................................................. 61
Connecting the Telephone Wires ...............................................................................................................62
Connecting the LAN Cables ....................................................................................................................... 63
Completing the Installation ......................................................................................................................... 65
Section II: Indoor Installation .................................................................................. 67
Chapter 5: Installing the Gateway Indoors ..................................................................................................69
Reviewing Safety Precautions .......................................................................................................................... 70
Required Tools and Supplies............................................................................................................................ 72
Tools...........................................................................................................................................................72
Additional Supplies ..................................................................................................................................... 72
Preparing for the Installation ............................................................................................................................. 73
Fastening the Plywood Mounting Surface to a Wall and Preparing the Gateway.............................................74
Connecting the Ground Wire ............................................................................................................................77
Preparing and Connecting the Power Cord ...................................................................................................... 78
Connecting the Fiber Optic Cable..................................................................................................................... 81
Connecting the Telephone Wires...................................................................................................................... 82
Connecting the LAN Cables.............................................................................................................................. 83
Completing the Installation................................................................................................................................84
Section III: Troubleshooting ....................................................................................85
Chapter 7: Troubleshooting .......................................................................................................................... 87
Appendix A: Technical Specifications .........................................................................................................89
Physical Specifications ..................................................................................................................................... 89
Environmental Specifications ............................................................................................................................ 89
Power Specifications.........................................................................................................................................89
Safety and Electromagnetic Emissions Certifications ....................................................................................... 89
Power Cord Wiring............................................................................................................................................90
Appendix B: Cleaning Fiber Optic Connectors ........................................................................................... 91
Using a Cartridge-Type Cleaner .......................................................................................................................92
Using a Swab.................................................................................................................................................... 94
Appendix C: Turnup Process ....................................................................................................................... 97
Turnup Flowchart .............................................................................................................................................. 98
6

Figures

Figure 1. AT-iMG646xx Series Intelligent Multiservice Gateway.........................................................................................20
Figure 2. Gateway LEDs .....................................................................................................................................................21
Figure 3. AT-EN646 Enclosure............................................................................................................................................26
Figure 4. Mounting Hole Locations......................................................................................................................................33
Figure 5. Grounding Plate ...................................................................................................................................................35
Figure 6. Aligning the Grounding Plate................................................................................................................................35
Figure 7. Location of Fiber Optic Drop Cable and Ground Wire Entrance ..........................................................................36
Figure 8. Inserting the Wire Tie ...........................................................................................................................................37
Figure 9. Positioning the Cable ...........................................................................................................................................37
Figure 10. Drop Cable Secured to the Grounding Plate ......................................................................................................38
Figure 11. Lining Up the Ground Wire.................................................................................................................................39
Figure 12. Securing the Tracer Wire and Aramid Yarn........................................................................................................40
Figure 13. Location of Fiber Optic Drop Cable and Ground Wire Entrance ........................................................................40
Figure 14. Inserting the Wire Tie .........................................................................................................................................41
Figure 15. Opening Out the Shielding .................................................................................................................................41
Figure 16. Positioning the Cable .........................................................................................................................................42
Figure 17. Armored Drop Cable Secured to the Grounding Plate .......................................................................................42
Figure 18. Lining Up the Ground Wire.................................................................................................................................43
Figure 19. Two-Part Metal Splice Tray ................................................................................................................................44
Figure 20. Inserting the Wire Ties........................................................................................................................................45
Figure 21. Securing the Buffer Tube ...................................................................................................................................45
Figure 22. Setting the Fiber Cable in the Splice Tray ..........................................................................................................46
Figure 23. Securing the Pigtail ............................................................................................................................................46
Figure 24. Securing the Metal Splice Tray...........................................................................................................................47
Figure 25. Inserting the Wire Ties........................................................................................................................................48
Figure 26. Securing the Buffer Tube ...................................................................................................................................48
Figure 27. Setting the Fiber Cable in the Splice Tray ..........................................................................................................49
Figure 28. Securing the Pigtail ............................................................................................................................................49
Figure 29. Securing the Plastic Splice Tray.........................................................................................................................50
Figure 30. Location of the Mounting Post ............................................................................................................................56
Figure 31. Positioning the Gateway on the Mounting Post..................................................................................................56
Figure 32. Securing the Gateway to the Mounting Post ......................................................................................................57
Figure 33. Mounting the Gateway ...............................................................................................
Figure 34. Power Cord Entrance .........................................................................................................................................58
Figure 35. Proper Installation of the Terminal Block Ground Wire ......................................................................................59
Figure 36. Plugging in the DC Terminal Block.....................................................................................................................60
Figure 37. Mounting the Metal Splice Tray on the Gateway................................................................................................61
Figure 38. Mounting the Plastic Splice Tray on the Gateway ..............................................................................................61
Figure 39. Securing the Fiber Cable....................................................................................................................................62
Figure 40. Telephone Wire Entrance...................................................................................................................................63
Figure 41. Connecting the Telephone Wires .......................................................................................................................63
Figure 42. LAN Cable Entrance...........................................................................................................................................64
Figure 43. Inserting the Wire Tie .........................................................................................................................................64
Figure 44. Connecting the LAN Cables ...............................................................................................................................65
Figure 45. Connecting the Management Cable ...................................................................................................................65
Figure 46. Securing the Plywood to the Wall.......................................................................................................................74
Figure 47. Putting the Washer on the Stud .........................................................................................................................75
Figure 48. Securing the Grounding Stud .............................................................................................................................75
Figure 49. Securing the Gateway to the Mounting Surface .................................................................................................76
Figure 50. Securing the Ground Wire Lug...........................................................................................................................77
........................................57
7
Figures
Figure 51. Proper Installation of the Terminal Block Ground Wire.......................................................................................79
Figure 52. Plugging in the DC Terminal Block .....................................................................................................................80
Figure 53. Connecting the Fiber Optic Cable.......................................................................................................................81
Figure 54. Connecting the Telephone Wires .......................................................................................................................82
Figure 55. Connecting the LAN Cables ...............................................................................................................................83
Figure 56. Connecting the Management Cable ...................................................................................................................84
Figure 57. Gateway Terminal Block to Power Cord Terminal Block Wiring Diagram ..........................................................90
Figure 58. Ferrule in an SC Connector Plug........................................................................................................................91
Figure 59. Unclean and Clean Ferrule.................................................................................................................................91
Figure 60. Cartridge Cleaner ...............................................................................................................................................92
Figure 61. Rubbing the Ferrule Tip on the Cleaning Surface ..............................................................................................92
Figure 62. Lint-Free and Alcohol-Free Swabs .....................................................................................................................94
Figure 63. Cleaning a Recessed Ferrule .............................................................................................................................94
8

Tables

Table 1. Safety Symbols .....................................................................................................................................................12
Table 2. PWR, SYST, and LAN LEDs ................................................................................................................................21
Table 3. WAN LED on the ATiMG646BD-ON .....................................................................................................................22
Table 4. WAN LED on the ATiMG646PX-ON .....................................................................................................................22
Table 5. Gateway Terminal Block to Power Cord Terminal Block Wiring ...........................................................................90
9
Tables
10

Preface

This guide contains instructions on how to install the AT-EN646 enclosure and an AT-iMG646xx series intelligent Multiservice Gateway. This preface contains the following sections:
“Safety Symbols Used in this Document” on page 12
“Where to Find Web-based Guides” on page 13
“Contacting Allied Telesis” on page 14
11
Preface

Safety Symbols Used in this Document

This document uses the safety symbols defined in Table 1.
Table 1. Safety Symbols
Symbol Meaning Description
Caution Performing or omitting a specific action may
result in equipment damage or loss of data.
Warning Performing or omitting a specific action may
result in electrical shock.
12
AT-iMG646xx Series Intelligent Multiservice Gateway and AT-EN646 Enclosure Installation Guide

Where to Find Web-based Guides

The installation and user guides for all Allied Telesis products are available in portable document format (PDF) on our web site at www.alliedtelesis.com. You can view the documents online or download them onto a local workstation or server.
13
Preface

Contacting Allied Telesis

This section provides Allied Telesis contact information for technical support as well as sales or corporate information.

Online Support You can request technical support online by accessing the Allied Telesis

Knowledge Base from the following web site: www.alliedtelesis.com/support. You can use the Knowledge Base to submit questions to our technical support staff and review answers to previously asked questions.
Email and Telephone
Support
Returning
Products
For Sales or
Corporate
For Technical Support via email or telephone, refer to the Allied Telesis web site: www.alliedtelesis.com. Select your country from the list displayed on the website. Then select the appropriate menu tab.
Products for return or repair must first be assigned a Return Materials Authorization (RMA) number. A product sent to Allied Telesis without a RMA number will be returned to the sender at the sender’s expense.
To obtain an RMA number, contact the Allied Telesis Technical Support group at our web site: www.alliedtelesis.com/support/rma. Select your country from the list displayed on the website. Then select the appropriate menu tab.
You can contact Allied Telesis for sales or corporate information at our web site: www.alliedtelesis.com. Select your country from the list displayed on the website. Then select the appropriate menu tab.
Information

Warranty The AT-iMG646xx series intelligent Multiservice Gateway has a limited

warranty of two years. Go to www.alliedtelesis.com/warranty for the specific terms and conditions of the warranty and for warranty registration.
14
AT-iMG646xx Series Intelligent Multiservice Gateway and AT-EN646 Enclosure Installation Guide

Management Software Updates

New releases of management software for our managed products are available from either of the following Internet sites:
Allied Telesis web site: www.alliedtelesis.com
Allied Telesis FTP server: ftp://ftp.alliedtelesis.com
If you prefer to download new software from the Allied Telesis FTP server from your workstation’s command prompt, you will need FTP client software and you must log in to the server. Enter “anonymous” for the user name and your email address for the password.
15
Preface
16

Chapter 1

Overview

This chapter contains the follows sections:
“Features” on page 18
“LEDs” on page 21
17
Chapter 1: Overview

Features

The AT-iMG646xx-ON gateway is optimized for delivery of IP Triple Play services. With full routing and multicast capabilities, the AT-iMG646xx-ON gateway simultaneously delivers high quality IP video, up to four lines of VoIP, and differentiated data services. Security for the service provider and subscriber are ensured through Stateful-Inspection Firewall and NAT. The AT-iMG646BD model gateway accelerates the move towards network convergence through proven interoperability with major softswitch vendors using MGCP, SIP, and H.323 VoIP protocols.
Designed for one- or two-phase installation, the AT-IMG646BD-ON and AT-iMG646PX-ON gateways have integrated fiber drop cable termination and fiber splice protection. A single fiber network uplink ensures efficient use of network infrastructure, and the AT-iMG646xx-ON gateway provides six 10/100Base-T ports for connection to setup boxes, PCs, and Ethernet devices. Remote monitoring and configuration software increase service reliability and eliminate the need for truck rolls. The gateways are powered by an uninterruptible power supply for lifeline POTS.
Common features of the AT-iMG646xx series intelligent Multiservice Gateways include:
Four analog telephone ports with a pair of terminal blocks per port
Four RJ-11 pigtail connectors for in-house wiring troubleshooting
Six 10/100Base-TX Ethernet (LAN) ports with RJ-45 connectors
IP Triple Play ready
Stateful inspection firewall/NAT for customer and provider security
Single bidirectional fiber for reduced infrastructure cost
Remote configuration through AlliedView NMS or Zero Touch
Configurator software
Major softswitch manufacturer compatibility established
Service specific management and monitoring ensures quality of
service to customers
Environmentally hardened gateway for outdoor deployments
Installation flexibility from two-part enclosure and gateway design
Internal fiber management for fiber optic drop cable termination
8 hour battery backup option for lifeline POTS support
18
LEDs for system, WAN, LAN, and VoIP status
In addition to the common features listed above, the AT-iMG646BD-ON model has the following features
One 100Base-BX single fiber bidirectional uplink (WAN) port
AT-iMG646xx Series Intelligent Multiservice Gateway and AT-EN646 Enclosure Installation Guide
Up to 100Mbps bandwidth delivery
In addition to the common features listed above, the AT-iMG646PX-ON model has a 1 Gigabit PX20 802.11ah bidirectional uplink (WAN) port.
The AT-iMG646PX-ON WAN interface is compliant with the IEEE 802.3ah EPON standard. The AT-iMG646PX-ON is part of a complete EPON system when deployed in conjunction with the AT-TN118-A two-port GEPON service module in an AT-iMAP 9x00 chassis.
19
Chapter 1: Overview
Figure 1 illustrates the AT-iMG646xx series intelligent Multiservice Gateway.
878
Figure 1. AT-iMG646xx Series Intelligent Multiservice Gateway
The MAC address(es) for the AT-iMG646xx gateway are located on the label above the RJ11 and RJ45 ports.
The AT-iMG646BD-ON has a single MAC address. The AT-iMG646PX-ON gateway has two MAC addresses, one for the GEPON WAN uplink (GEPON WAN MAC or GEPON MAC), and the other for the AT-iMG646PX-ON gateway itself (Ethernet iMG MAC or iMG MAC). When the AT-iMG646PX-ON is initially registered, the OLT tries to register the unit based on the GEPON WAN MAC address. After registration, the network configuration is loaded against the AT-iMG646PX-ON MAC address.
20

LEDs

AT-iMG646xx Series Intelligent Multiservice Gateway and AT-EN646 Enclosure Installation Guide
The AT-iMG646xx series intelligent Multiservice Gateway has four LEDs, as shown in Figure 2 and three of which are described in Table 2.
880
Figure 2. Gateway LEDs
Table 2. PWR, SYST, and LAN LEDs
LED State Description
PWR On The gateway is receiving power and the voltage
is within an acceptable range.
Off The unit is not receiving power.
SYST On The unit is starting up or is malfunctioning.
Off The unit is working normally.
Flashing The gateway is downloading software and writing
it to flash memory. Do not reboot or remove power from the unit when it is in this state.
WAN On A WAN link has been established.
Off A WAN link has not been established.
Flashing The WAN link is active.
VOIP On One or all of the VoIP lines are in use.
Off None of the VoIP lines are in use.
Flashing The VoIP network is operating.
21
Chapter 1: Overview
The operation of the WAN LED varies depending upon the unit, as described in Table 3 and Table 4.
Table 3. WAN LED on the ATiMG646BD-ON
State Description
Off A WAN link has not been established.
On A WAN link has been established.
Table 4. WAN LED on the ATiMG646PX-ON
State Description
Off No optical signal detected.
Solid Amber An optical signal has been detected.
Solid Green The unit has been registered by OLT.
22

Section I

Outdoor Installation

The chapters in this section provide information and procedures for installing the enclosure and the gateway in an outdoor location. The chapters include:
Chapter 2, ”Outdoor Installation Overview” on page 25
Chapter 3, ”Installing the Enclosure” on page 29
Chapter 4, ”Installing the Gateway Outdoors” on page 51
Section I: Outdoor Installation 23
24 Section I: Outdoor Installation

Chapter 2

Outdoor Installation Overview

This chapter provides and overview of the outdoor installation and contains the following sections:
“Enclosure” on page 26
“Installation Options” on page 27
Section II: Indoor Installation 25
Chapter 2: Outdoor Installation Overview

Enclosure

The AT-EN646 enclosure houses and protects the AT-iMG646xx series gateway and is designed to be mounted on the exterior of a building. The features of the enclosure include:
Weather tight casing
Outer and inner enclosures that provide two access levels: subscriber
and service provider
Options for cable entrances
Fiber splice tray
Lockable
Dedicated grommet entries for subscriber wires and service provider
cables
Figure 3 illustrates the AT-EN646 enclosure.
840
Figure 3. AT-EN646 Enclosure
26 Section II: Indoor Installation

Installation Options

You can install the gateway and enclosure in either of the following two sequences:
Install the enclosure first, and the gateway later. In this situation, you
Install the enclosure, followed by the gateway electronics. To make
AT-iMG646xx Series Intelligent Multiservice Gateway and AT-EN646 Enclosure Installation Guide
can use the instructions in the guide that was shipped with the enclosure, or the instructions in the next chapter of this guide.
sequential installations, follow the instructions in chapter 3 followed by those in chapter 4.
Section II: Indoor Installation 27
Chapter 2: Outdoor Installation Overview
28 Section II: Indoor Installation

Chapter 3

Installing the Enclosure

This chapter describes how to install the enclosure and contains the following sections:
“Reviewing Safety Precautions” on page 30
“Required Tools and Supplies” on page 32
“Mounting the Enclosure” on page 33
“Installing the Grounding Plate” on page 35
“Installing the Dielectric Drop Cable” on page 36
“Installing the Armored Drop Cable” on page 40
“Splicing the Drop Cable and Securing the Fusion Splice Tray” on
page 44
Section I: Outdoor Installation 29
Chapter 3: Installing the Enclosure

Reviewing Safety Precautions

Please review the following safety precautions before you begin to install the enclosure.
Note
The indicates that a translation of the safety statement is available in a PDF document titled “Translated Safety Statements” on the Allied Telesis website at www.alliedtelesis.com.
Warning: Do not work on equipment or cables during periods of lightning activity.
Warning: Operating Temperature. This product is designed for an operating temperature range of -40° to +60 degrees C.
E2
All Countries: Install product in accordance with local and
National Electrical Codes.
Warning: Only trained and qualified personnel are allowed to install or to replace this equipment.
Warning: This unit is intended for installation in a restricted access location. A restricted access location in where access can only be gained by authorized service personnel through the use of a special tool, lock and key, or other means of security, and is controlled by the authority responsible for that location.
The enclosure should be mounted away from all water sources.
E8
E14
30 Section I: Outdoor Installation
Loading...
+ 68 hidden pages