All rights reserved. Transfer, copy, use or communication of this file is prohibited without authorization.
Insert SIM card
SMS test
Start
Phone call test
Switch on the H/S
Auto Test
END
Test done / check
Charge test
To check if the card is right fitting and charge
To check every key / backlight / display
To check the communication & function of hands-free
To check it can send/receive message normally
Plug the charger for at least 5mn to check if the device
takes the charge
Including the below test items:
Backlight/LCD/Keypad/receiver/Micophone/Speaker/
Headset/Battery/Melody/ Vibrator/Charger
L2 Repair Document
3. Online software update
It is authorized to download software in level 1 repair center for the handset which needs to update.
The “SoftwareUpgrade 4.7” is a software upgrade application. Handset Software can be downloaded
from TS website via it. TS Website: https://css.tclmobile.cn/.SoftwareUpgrade 4.7 is for one touch
282 while 4.86 is for MTC 268.RPFPG1801 can use SoftwareUpgrade 4.98.
3.1 Below equipments is requested when download
A handset with full charged battery.
PC with windows system.
A downloading cable.
All rights reserved. Transfer, copy, use or communication of this file is prohibited without authorization.
L2 Repair Document
Step3: Remove keypad and receiver.
Step4: Separate the side key and then remove the PCBA from Front frame.
Note: please use brush to smear the lube at the undersurface of slide keys before assembling a new
furnished frame. And move the slide keys back and forth (at least once) after smearing the lube. Otherwise,
the slide keys can work but maybe hard to move.
Step5: Separate the LCD rubber/vibrator/speaker/SOS rubber.
All rights reserved. Transfer, copy, use or communication of this file is prohibited without authorization.
Key beep and melody
problem
Check the contact on the PCBA (dirty or
oxidized)
L2 Repair Document
In case the LEVEL 2 repair can‟t solve the problem, or if the board is damaged, exchange the board.
7. PCBA exchange
If Level 2 repair does not solve the failure, the PCBA will be scraped overseas.
8. Other component exchange
The other components exchange such as
1) LCD module
2) Keypad
3) Vibrator
4) Receiver
5) Speaker
6) Microphone
7) Camera
8) FPC connection
9) Audio connector
10) Camera connector
11) Other related mechanical components
Please follow the detail steps 5.3 (Disassembly and assembly process).
But need to be very careful to handle the components with related special tool or jig (especially replacing
new components)
It is better to handle it with plastic tools (plastic tweezers and wedge etc.).
Besides operator must wear anti-static gloves, fingertips or wear static loop during the whole process of
All rights reserved. Transfer, copy, use or communication of this file is prohibited without authorization.
Key beep and melody
problem
Check the contact on the PCBA (dirty or
oxidized)
L2 Repair Document
In case the LEVEL 2 repair can‟t solve the problem, or if the board is damaged, exchange the board.
7. PCBA exchange
If Level 2 repair does not solve the failure, the PCBA will be scraped overseas.
8. Other component exchange
The other components exchange such as
1) LCD module
2) Keypad
3) Vibrator
4) Receiver
5) Speaker
6) Microphone
7) Camera
8) FPC connection
9) Audio connector
10) Camera connector
11) Other related mechanical components
Please follow the detail steps 5.3 (Disassembly and assembly process).
But need to be very careful to handle the components with related special tool or jig (especially replacing
new components)
It is better to handle it with plastic tools (plastic tweezers and wedge etc.).
Besides operator must wear anti-static gloves, fingertips or wear static loop during the whole process of
All rights reserved. Transfer, copy, use or communication of this file is prohibited without authorization.
L2 Repair Document
11.1 Other mandatory equipments
1) Final test kit (charger, battery, back cover)
2)Bench and socket
12. Packaging Requirement
1) PCBA shipment requirement:
Anti Electro-Static.
Avoid PCBA are laid to overlap each other.
Against press outside package.
2) Solution 1: Each PCBA is packaged by shield bag, put each PCBA into each cave of the carton (refer
to picture below).
3) Solution 2: Stack by special trays (15 trays maximum), put empty trays to fill space inside the carton
and all trays should be bound tightly in order to avoid PCBA move out (see picture below).
If you have any question or problem, please feel free to contact us