
Part List
Headboard & Footboard
A 1Headboard Panel
Hardware List In Headboard & Footboard
No QtyDescriptions
1
B
C
D
Headboard Leg Right (R)
Headboard Leg Left (L)
Headboard Support Rail Front
1
1
1
2
3
4
5
6
No QtyDescriptions
Headboard Support Rail Back 1
7
38
3
CSK M4 x 16mm
CSK M4 x 32mm
JCBC Screw M6 x 35mm
JCBC Screw M6 x 50mm
8Flat Washer Ø1/4" x 20mm
8
8Spring Washer Ø1/4"
Page 1 of 6
ASSEMBLY INSTRUCTIONS
7 1L Key M4 x 65mm
8 1L Key M5
ASSEMBLY TIPS :
1. Remove hardware from box and sort by size.
2. Please check to see that all hardware and parts are present prior to start of assembly.
3. Please follow attached instructions in the same sequence as numbered to assure fast and
E
Footboard 1F
Bed Rail 2G
Drawer Slat 1H
Drawer Slat Support 1I
Bed Slat 3 Holes 3J
Bed Slat 2 Holes 10K
Bed Slat Support 3L
Center Slat With 3 Holes 1M
Drawer 2N
Slat Cover 1O
Drawer Slat Support Stopper 1P
I
H
P
easy assembly.

ASSEMBLY INSTRUCTIONS
Page 2 of 6
A
C
E
D
B
STEP 1.1: Attach & tighten the headboard leg (B) & (C) to the headboard (A). Affix headboard & headboard leg using JCBC screw M6 x 35mm (3),
spring washer (5) , flat washer (6) using L key (7).
STEP 1.2: Attach headboard support rail front (D) & affix using CSK screw M4 x 32mm (2).
STEP 1.3: Followed by attach headboard back support rail (E) & affix using CSK screw M4 x 32mm (2). (Attach at the top of wood cleat as shown in diagram.)
6
5
7
3
2
E
Wood Cleat
2
D
Wood Cleat
STEP 1.1 STEP 1.2 STEP 1.3
STEP 1.2
STEP 1.3
STEP 1.1
STEP 1.1