ABB ACS150, ACS350 Installation Guide

ACS150 and ACS350
MUL1-R1 Installation instructions
1
1. Fasten the gland box frame to drive with two M4×12 screws.
2
2. Fasten the gland box frame to wall with four M4 screws (not included).
3b
3a
3. Install clamps (3a) for control cables (see power cable lead-throughs), or if cables are run in conduits, replace all clamps with suitable glands (not included). Run cables through the clamps and tighten. Strip cable ends. Fasten the grounding conductor (PE) of the input power cable and the twisted shield of motor cable under the grounding clamps (3b). Connect the conductors to appropriate terminals. See Electrical installation in the drive manual.
4
4. With FPBA-01 or FCAN-01 option modules, remove the detachable lid (4) from the gland box cover.
© 2006 ABB Oy. All Rights Reserved. 3AFE68642868 Rev. D / 03.03.2006
7
6
5, 6, 7. With any fieldbus option module except FRSA-00, remove the support plate (5), install the I/O clamping plate (6) and the option grounding plate (7) to the gland box frame. See Mechanical installation in the drive manual.
5
8. Install the gland box cover.
9. Fasten the cover with two M4×12 screws.
12
10
11
8
9
11. Fasten the hood to drive with two M3×12 screws.
10. Install the hood. First position the front edge carefully, then press the hood downwards until it snaps on.
12. Fasten the hood to wall with one M4 screw (not included).
13. ACS350 and ACS150 drives with MUL1-R1 option installed.
ABB Oy AC Drives P.O. Box 184 FIN-00381 HELSINKI FINLAND Tel. +358 10 22 11, Fax: +358 10 22 22681, Internet: http://www.abb.com