AC or DC Powered, Managed
PoE+ Gigabit Switch with SFP
Model: ES-8-150W
Introduction
Thank you for purchasing the Ubiquiti Networks® EdgeSwitch™.
This Quick Start Guide is designed to guide you through the
installation and also includes the warranty terms.
Package Contents
EdgeSwitch ES-8-150W
Power CordMount Brackets
Mounting Screws
(M4, Qty. 4)
TERMS OF USE: All Ethernet cabling runs must use CAT5 (or above). It is the customer’s
responsibility to follow local country regulations, including operation within legal frequency
channels, output power, indoor cabling requirements, and Dynamic Frequency Selection
(DFS) requirements.
(Qty. 2)
Screw Anchors
(M4, Qty. 4)
Bracket Screws
(M4, Qty. 8)
AC or DC Powered, Managed
PoE+ Gigabit Switch with SFP
Model: ES-8-150W
Quick Start
Guide
System Requirements
• Linux, MacOSX, or Microsoft Windows 7/8/10
• Web Browser: Mozilla Firefox, Google Chrome, Microsoft
Edge, or Microsoft Internet Explorer 11
Installation Requirements
• Phillips screwdriver (for shelf or wall mounting)
• (Optional) 42 to 56VDC power source, such as the
EdgePower™ EP-54V-150W, for stand-alone DC power or
redundant power backup.
• For indoor applications, use Category 5 (or above) UTP
cabling approved for indoor use.
• For outdoor applications, shielded Category 5 (or above)
cabling should be used for all wired Ethernet connections
and should be grounded through the AC ground of the
power supply.
We recommend that you protect your networks from
harmful outdoor environments and destructive ESD events
with industrial-grade, shielded Ethernet cable from Ubiquiti
Networks. For more details, visit www.ubnt.com/toughcable
WARNING: To reduce the risk of fire or electric shock,
do not expose the switch to rain or moisture.
Note: Although the cabling can be located outdoors,
the EdgeSwitch itself should be housed inside a
protective enclosure.
Hardware Overview
LEDs
PoE
RJ45
Link/Speed/Activity
System
RJ45 LEDs
LED
PoE
Link/
Speed/
Activity
Link/Speed/Activity
StateStatus
OffNo PoE
AmberIEEE 802.3af/802.3at
Green24V Passive
OffNo Link
Link Established at
Amber
10/100Mbps
Flashing Indicates Activity
Link Established at
Green
1000Mbps (1 Gbps)
Flashing Indicates Activity
SFP
System LED
StateStatus
Steady BlueInitializing.
Flashing BlueResetting to factory defaults.
Steady WhiteReady for use and working properly.
SFP LEDs
LED
Link/
Speed/
Activity
StateStatus
OffNo Link
Green
Link Established at 1Gbps
Flashing Indicates Activity
Front Panel
PortDescription
RJ45 ports support 10/100/1000 Ethernet
RJ45 1-8
connections and configurable Power over
Ethernet (auto PoE+ or 24V Passive).
Hot-swappable SFP ports support 1 Gbps
SFP 1-2
connections.
There are two methods to reset the EdgeSwitch
to factory defaults:
Runtime Reset (Recommended)
The EdgeSwitch should be running after bootup
is complete, and the System LED is white. Press
and hold the Reset button. The EdgeSwitch
will reboot, and the System LED becomesblue
after three seconds. Continue to hold the
Reset button for about 15seconds until the
Reset
System LED flashes blue for two seconds. This
Button
indicates that the EdgeSwitch has reset to its
factorydefaults.
Power-on Reset
1. Disconnect power from the EdgeSwitch.
2. Reconnect power while holding the Resetbutton for about 15seconds until the System
LED flashes blue for two seconds. This
indicates that the EdgeSwitch has reset to its
factory defaults.
RJ45 1-8SFP 1-2
Reset Button
Back Panel
Console Port
DC Input Ground
PortDescription
RJ45 serial console port for Command
Line Interface (CLI) management. Use an
RJ45-to-DB9, serial console cable, also
known as a rollover cable, to connect
the Console port to your computer. Then
Console
AC Power
DC Input
Ground
Note: The redundant DC power source may be used
as a hot backup. The DC power source will provide
continuous power in the event of an interruption or
loss of AC power.
configure the following settings as needed:
• Baud rate 115200
• Data bits 8
• Parity NONE
• Stop bits 1
• Flow control NONE
Connect the included Power Cord to the AC Power port.
Optional DC input for connecting a
redundant or stand-alone 42 to 56VDC
power source, such as the EdgePower
EP-54V-150W.
Ground bonding point for an optional
ground wire.
AC Power
Side Panels
Ventilation Holes
WARNING: FAILURE TO PROVIDE PROPER VENTILATION
MAY CAUSE FIRE HAZARD. KEEP AT LEAST 20 MM OF
CLEARANCE NEXT TO THE VENTILATION HOLES FOR
ADEQUATE AIRFLOW.
WARNING: The ES-8-150W must not be stacked. Do not
place it on top of another switch. Do not place anything
on top of the ES-8-150W.
Hardware Installation
The EdgeSwitch may be placed on a desktop, or mounted on
a shelf or wall.
Shelf Mounting
1. Position the two Mount Brackets as shown below, and
attach the brackets using the eight Bracket Screws.
2. Secure the EdgeSwitch to the shelf using the four
MountingScrews.
Loading...
+ 19 hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.