SMA SB 1100 User Manual

PV Inverters
SUNNY BOY 1100 / 1200 / 1700
Installation Guide
SB11_12_17-IEN100132 | IMEN-SB11_17 | Version 3.2
EN
SMA Solar Technology AG Table of Contents
1 Notes on this Manual. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
1.1 Area of Validity. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
1.2 Target Group . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
1.3 Additional Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
1.4 Symbols Used . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
2 Security . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
2.1 Appropriate Usage. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
2.2 Safety Instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
3 Unpacking. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
3.1 Packing List . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
3.2 Identifying the Sunny Boy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
4 Installing the Device. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
4.1 Selecting the Mounting Location. . . . . . . . . . . . . . . . . . . . . . . . 11
4.2 Mounting the Sunny Boy with a Wall Mounting Bracket . . . . . 13
5 Electrical Connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
5.1 Overview of the Connection Area . . . . . . . . . . . . . . . . . . . . . . 15
5.1.1 Exterior View . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
5.1.2 Interior View . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
5.2 Connecting the Sunny Boy to the public grid (AC). . . . . . . . . . 17
5.3 Setting the Display Language . . . . . . . . . . . . . . . . . . . . . . . . . . 22
5.4 Communication. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
5.5 Connecting the PV Generator (DC) . . . . . . . . . . . . . . . . . . . . . 23
5.6 Setting the installation country . . . . . . . . . . . . . . . . . . . . . . . . . 25
6 Commissioning the Sunny Boy . . . . . . . . . . . . . . . . . . . . . 26
6.1 Display . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
Installation Guide SB11_12_17-IEN100132 3
Table of Contents SMA Solar Technology AG
6.2 Blink Codes. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
7 Opening and Closing. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32
7.1 Opening the Sunny Boy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32
7.2 Closing the Sunny Boy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33
8 Maintenance and Cleaning. . . . . . . . . . . . . . . . . . . . . . . . 35
8.1 Check the Electronic Solar Switch for wear . . . . . . . . . . . . . . . 35
9 Troubleshooting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36
9.1 The red LED is continuously on . . . . . . . . . . . . . . . . . . . . . . . . . 36
9.1.1 Checking the PV Generator for Ground Fault. . . . . . . . . . . . . . . . . . . . . . . . 36
9.1.2 Checking the Function of the Varistors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38
10 Decommissioning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40
10.1 Removing the Sunny Boy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40
10.2 Packaging the Sunny Boy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41
10.3 Storing the Sunny Boy. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41
10.4 Disposing of the Sunny Boy . . . . . . . . . . . . . . . . . . . . . . . . . . . 41
11 Technical Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42
12 Accessories . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46
13 Contact . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47
4 SB11_12_17-IEN100132 Installation Guide
SMA Solar Technology AG Notes on this Manual

1 Notes on this Manual

This manual desc ribes how to mount, install, commission and ser vice the Sunny Boy 1100 (SB 1100), Sunny Boy 1200 (SB 1200) and Sunny Boy 1700 (SB 1700).
Store this manual where it can be accessed at all times.

1.1 Area of Validity

This manual applies to the following SMA inverters:
• Sunny Boy 1100 (discontinued model),
• Sunny Boy 1200 (available on request),
• Sunny Boy 1700.

1.2 Target Group

This manual is for qualified personnel. The tasks described in this manual may only be performed by qualified personnel.

1.3 Additional Information

You will find further information on special topics such as designing a line circuit breaker or the description of the operating parameters in the download area at www.SMA.de/en.
Refer to the user manual for detailed information on troubleshooting and operating the Sunny Boy.
Installation Guide SB11_12_17-IEN100132 5
Notes on this Manual SMA Solar Technology AG

1.4 Symbols Used

The following types of safety instructions and general information appear in this document as described below:
DANGER!
G
DANGER indicates a hazardous situation which, if not avoided, will result in death or serious injury.
WARNING!
WARNING indicates a hazardous situation which, if not avoided, could result in death or serious injury.
CAUTION!
CAUTION indicates a hazardous situation which, if not avoided, could result in minor or moderate injury!
NOTICE!
NOTICE indicates a situation that can result in property damage if not avoided.
Information
Information provides tips that are valuable for the optimal installation and operation of your product.
6 SB11_12_17-IEN100132 Installation Guide
SMA Solar Technology AG Security

2 Security

2.1 Appropriate Usage

The Sunny Boy is a PV inverter, which converts the DC current of the PV generator to AC current and feeds it into the public grid.
Principle of a PV system with this Sunny Boy
The Sunny Boy may only be operated with PV generators (modules and cabling) of protection class II. Do not connect any sources of energy other than PV modules to the Sunny Boy.
When designing the PV system, ensure that the values comply with the permitted operating range of all components at all times. The free design program "Sunny Design" (www.SMA.de/en/SunnyDesign) will assist you. The manufacturer of the PV modules must have approved the modules for use with this Sunny Boy. You must also ensure that all measures recommended by the module manufacturer for long-term maintenance of the module properties are taken (see also Technical Information "Module Technology", in the download area of www.SMA.de/en).
Do not use the Sunny Boy for purposes other than those described here. Alternative uses, modifications to the Sunny Boy or the installation of components not expressly recommended or sold by the manufacturer void the warranty claims and operation permission.
Installation Guide SB11_12_17-IEN100132 7
Security SMA Solar Technology AG
Certified Countries
The Sunny Boy 1100 / 1200 / 1700 (with according configuration) fulfill the requirements specified in the following standards and directives (dated: July/2009):
• VDE 0126-1-1 (02.2006)
• G83/1 (09.2003)
• CER/06/190 (10.2006)
• E 2750 (11.2004)
• PPC (06.2006)
• EN 50438 (12.2007)
• C10/C11 (08.2003)
• AS4777 (2005)
•MEA
• IEC-utility Meeting 216
SMA Solar Technology can preset special grid parameters for other countries / installation locations according to customer request, after evaluation by SMA Solar Technology.
You can later make modifications yourself by changing software parameters with respective communication products (e.g. Sunny Data Control). A personal password is required for this, which you can obtain from the Serviceline upon request.
8 SB11_12_17-IEN100132 Installation Guide
SMA Solar Technology AG Security

2.2 Safety Instructions

DANGER!
Danger to life due to high voltages in the Sunny Boy!
• All work on the Sunny Boy must only be carried out by qualified personnel.
• T he a ppl iance i s no t to be u sed by c hildre n or per son s wi th r educed physical, sensory or mental capabilities, or lack of experience and knowledge, unless they have been given supervision or instruction.
• Children should be supervised to ensure that they do not play with the appliance.
CAUTION!
Parts of the enclosure can get hot - Risk of burn injuries!
• Do not touch the enclosure of the Sunny Boy during operation.
NOTICE!
Foreign objects or water entering the Sunny Boy can damage the device!
Once the Electronic Solar Switch has been pulled out, the Sunny Boy only provides protection rating IP21. The Sunny Boy is then no longer protected against water and contamination with dirt!
In order that the protection rating IP65 is also provided during a temporary decommissioning, proceed as follows:
• Unplug all DC plug connectors and seal them with the protecting caps provided.
• Attach the Electronic Solar Switch again.
Grounding the PV generator
Compl y with the local r equir ements for gro unding the mod ules a nd the PV generator. SMA Solar Technology recommends to electrically bond the module frames, the racks and all metal surfaces and ground these in order to have optimal protection of the system and personnel.
Installation Guide SB11_12_17-IEN100132 9
Unpacking SMA Solar Technology AG

3 Unpacking

3.1 Packing List

Check the delivery for completeness and for visible external damage, such as cracks in the enclosure or in the display. Please contact your dealer if something is damaged or missing.
Object Quantity Description A 1Sunny Boy B 1 Wall mounting bracket C 1 Electronic Solar Switch (ESS) D 1Set of documents E 2 1 installation guide, 1 user manual F 1 Socket element G 1 Threaded sleeve H 1 Pressure screw PG13.5 I 1Sealing ring PG13.5 J 1 Fastening case PG13.5 K 1 Cable gland PG16 L 2 Protecting caps for DC connector M 1 Protective cap for AC screw clamp N 1 M6x12 cylinder head screw O 2 Plastic washer M5 (replacement for lid) P 1Jumper

3.2 Identifying the Sunny Boy

You can identify the Sunny Boy by the type plate. The type plate is on the right side of the enclosure. The serial number (serial No.) and the type (Type / Model) of the Sunny Boy are specified on the type plate.
10 SB11_12_17-IEN100132 Installation Guide
SMA Solar Technology AG Installing the Device

4 Installing the Device

4.1 Selecting the Mounting Location

DANGER!
Danger to life due to fire or explosion!
Despite careful construction, a fire can occur with electrical devices.
• Do not mount the Sunny Boy on flammable construction materials.
• Do not mount the Sunny Boy near highly flammable materials.
• Do not mount the Sunny Boy in potentially explosive areas.
CAUTION!
Parts of the enclosure can get hot - Risk of burn injuries!
• Mount the Sunny Boy in such a way that it cannot be touched inadvertently during operation.
CAUTION!
Risk of injury due to the heavy weight of the Sunny Boy!
• Take the weight of the Sunny Boy of approx. 25 kg into account for mounting.
Observe the following conditions during mounting:
• The installation method and mounting location must be suitable for the weight and dimensions of the Sunny Boy (see section 11 "Technical Data" (page42)).
• Mount on a solid surface.
• The installation location must be accessible at all times.
• Vertical installation or tilted backwards by max. 45°.
• The connection area must point downwards.
• Never install the device with a forward tilt.
• Do not install horizontally.
• Install at eye level to allow operating modes to be read.
Installation Guide SB11_12_17-IEN100132 11
Installing the Device SMA Solar Technology AG
• The ambient temperature should be below 40 °C to ensure optimal operation.
• The Sunny Boy must be easy to remove from the mounting location at any time.
• Do not expose the Sunny Boy to direct sunlight, so as to avoid power reduction due to excessive heating.
• In a living area, do not mount the unit on plasterboard walls (or similar) in order to avoid audible vibrations.
The Sunny Boy can make noises when in use which can be regarded as a nuisance when installed in a living area.
• Observe the minimum clearances to walls, other inverters or objects as shown in the diagram in or der to g uar ant ee suff ici ent heat di ssi pat ion and to have enough space for removing the Electronic Solar Switch.
12 SB11_12_17-IEN100132 Installation Guide
SMA Solar Technology AG Installing the Device

4.2 Mounting the Sunny Boy with a Wall Mounting Bracket

CAUTION!
Risk of injury due to the heavy weight of the Sunny Boy!
• Take the weight of the Sunny Boy of approx. 25 kg into account.
• When mounting the bracket, use fastening material suitable for the material.
1. Use the wall mounting bracket as a drilling template and mark the position of the drill holes.
2. Attach the wall mounting bracket to the wall using appropriate screws and washers.
Installation Guide SB11_12_17-IEN100132 13
Installing the Device SMA Solar Technology AG
3. Use the upper mounting clips to fit the Sunny Boy in the wall mounting bracket so that it cannot be pushed out of the wall mounting bracket from the side.
4. Secure the Sunny Boy in position fastening the supplied M6x12 screw.
5. Check that the unit is securely in place.
☑ The Sunny Boy is now mounted on the wall.
14 SB11_12_17-IEN100132 Installation Guide
SMA Solar Technology AG Electrical Connection

5 Electrical Connection

NOTICE!
Electrostatic discharges can damage the Sunny Boy!
Internal components of the Sunny Boy can be irreparably damaged by static discharge.
• Ground yourself before touching a component.

5.1 Overview of the Connection Area

5.1.1 Exterior View

The following figure shows the assignment of the individual enclosure openings on the bottom of the Sunny Boy.
Object Description A Plug connectors for connecting the PV strings B Socket for the connection of the Electronic Solar Switch (ESS) DC load
disconnection unit
C Cable feed-through for communication (with sealing plugs) D Plug for AC connection
Installation Guide SB11_12_17-IEN100132 15
Electrical Connection SMA Solar Technology AG

5.1.2 Interior View

The following diagram gives a schematic overview of the various components and connection points inside the Sunny Boy with the lid removed:
Object Description A Varistors, section 9.1.2  B Connection area and sockets for communication (RS485, radio), section 5.4  C Display D PE (protective earth) connecting cable for cover E Operating status LEDs F Plug socket (AC), section 5.2  G Tab for grounding the cable shield with RS485 communication H PV input plugs (DC), section 5.5  I Electronic Solar Switch (ESS) socket
16 SB11_12_17-IEN100132 Installation Guide
SMA Solar Technology AG Electrical Connection

5.2 Connecting the Sunny Boy to the public grid (AC)

Connection requirements of the grid operator
Comply with the connection requirements of your utility operator.
Cable Design
The conductor cross-section should be dimensioned in a way that output losses do not exceed 1% at nominal power. Use "Sunny Design" (www.SMA.de/en/SunnyDesign) for this.
The maximum cable lengths relative to the conductor cross-section are shown in the following table.
Conductor cross-section Maximum cable length
SB 1100 SB 1200 SB 1700
1.5 mm² 21 m 18 m 15 m
2.5 mm² 35 m 30 m 22.5 m
The conductor cross-section required in individual cases depends on the following factors:
• ambient temperature,
•routing method,
•UV resistance,
• line losses,
• valid installation guidelines of the respective country (of the installation site).
Cable Requirements
Position Designation Value A External diameter 9 ...17 mm B Conductor cross-section max. 2.5 mm² C Strip insulation 4 ... 5 mm
Installation Guide SB11_12_17-IEN100132 17
Electrical Connection SMA Solar Technology AG
Load Disconnection Unit
You must install a separate line circuit breaker for each inverter in order to ensure that the inverter can be securely disconnected under load. The maximal permissible rating is located in section 11 "Technical Data" (page42)
Detailed information and examples for the design of a line circuit breaker can be found in the Technical Information "Line Circuit Breaker" in the download area of www.SMA.de/en.
DANGER!
Danger to life due to fire!
When more than one inverter is connected to the same line circuit breaker, the protective function of the line circuit breaker is no longer guaranteed. It can result in a cable fire or the destruction of the inverter.
• Never connect several inverters to a single line circuit breaker.
• Comply with the maximum permissible fuse protection of the inverter when selecting the line circuit breaker.
NOTICE!
Damaging of the Sunny Boy by using screw type fuse elements as load disconnection unit!
A screw type fuse element, e.g. D system (Diazed) or D0 system (Neozed) is not a circuit breaker, and may not be used as a load disconnection unit. A screw type fuse element is only used as cable protection.
When disconnecting under load using a screw type fuse element, the Sunny Boy can be damaged.
• Use only a load disconnecting switch or a line circuit breaker as load disconnecting unit.
DANGER!
Danger to life due to fire!
When a generator (Sunny Boy) and a consumer are connected to the same line circuit breaker, the protective function of the line circuit breaker is no longer guaranteed. The current from the Sunny Boy and the grid can add up to overcurrent which is not detected by the line circuit breaker.
• Never connect loads between the Sunny Boy and the line circuit breaker without protection.
• Always install separate fuses for loads.
18 SB11_12_17-IEN100132 Installation Guide
SMA Solar Technology AG Electrical Connection
Overview AC connection socket
Object Description A Socket element B Threaded sleeve C Sealing ring PG13.5 D Fastening case PG13.5 E Pressure screw for PG13.5 (for cable diameters between 9 and 13.5 mm) F Cable gland PG16 (for cable diameters between 13.5 and 17 mm)
Connection Procedure
1. Choose an appropriate screw fitting for the AC cable.
2. Check the grid voltage and compare it with "VAC" on the type plate. The exact working range of the Sunny Boy is specified in the operating parameters. These can
be uploaded via a communication component or can be ordered from SMA Solar Technology.
3. Switch off the line circuit breaker and secure it to prevent it from being reactivated and ensure that no voltage is present.
4. Strip approx. 30 mm from the AC cable.
5. Shorten L and N by 5 mm.
6. Strip the wires of the cable by 4 to 5 mm.
Installation Guide SB11_12_17-IEN100132 19
Electrical Connection SMA Solar Technology AG
7. Lead the pressure screw and/or cable gland and socket tube via the AC cable.
Size used Procedure PG13.5 •Push the sealing ring into
the fastening case.
• Lead the pressure screw PG13.5 and the fastening case including the sealing ring via the AC cable.
• Lead the threaded sleeve via the AC cable.
PG16 • Lead the cable gland
PG16 via the AC cable.
• Lead the threaded sleeve via the AC cable.
8. Insert the protective earth PE (green-yellow) in the screw terminal with the earth sign on the socket element and tighten the screw.
9. Insert the neutral conductor N (blue) in the screw terminal 1 on the socket and tighten the screw.
10. Place phase L (brown or black) into screw terminal 2 on the socket insert and tighten the screw.
11. Terminal 3 on the socket element remains unused.
12. Make sure the wires are securely connected.
20 SB11_12_17-IEN100132 Installation Guide
SMA Solar Technology AG Electrical Connection
13. Screw the threaded sleeve onto the socket element.
14. Screw the pressure screw tightly onto the threaded sleeve.
Size used Procedure PG13.5
The fastening case along with the sealing ring is pressed into the threaded sleeve and can no longer be seen.
PG16
☑ AC connection socket has been screwed together.
15. Seal the socket element with the provided protecting cap if the Sunny Boy is not immediately connected.
16. Insert the AC connection socket into the AC socket on the Sunny Boy. If necessary, remove the protective cap beforehand.
17. Screw the AC connection socket's threaded ring tightly onto the AC socket on the Sunny Boy. The threaded ring acts as a seal and a cable grip for the AC connection socket.
☑ The AC cable is connected to the Sunny Boy.
DANGER!
Danger to life due to high voltages in the Sunny Boy!
• Do not switch on the line circuit breaker until the Sunny Boy is securely closed and the PV generator has been connected.
Installation Guide SB11_12_17-IEN100132 21
Electrical Connection SMA Solar Technology AG

5.3 Setting the Display Language

You can set the language of the display using the switches on the underside of the display assemblies inside the Sunny Boy.
Proceed as follows to do so:
1. Open the Sunny Boy as described in section 7.1 "Opening the Sunny Boy" (page32).
2. Set the switches to the desired language as illustrated below.
Language Switch S2 Switch S1
German B B English B A French A B Spanish A A
3. Close the Sunny Boy as described in section 7.2 "Closing the Sunny Boy" (page33).

5.4 Communication

The Sunny Boy can be equipped with a communication interface (slot see section 5.1.2 "Interior View" (page16)) in order to communicate with special data acquisition devices (e. g. Sunny WebBox) or a PC with appropriate software (e.g. Sunny Data Control).
See the communication interface manual for a detailed wiring diagram and a description of the mounting.
22 SB11_12_17-IEN100132 Installation Guide
SMA Solar Technology AG Electrical Connection

5.5 Connecting the PV Generator (DC)

Use of Adaptors
Adaptors (branch connectors) are not to be visible or freely accessible in the immediate surrounding of the Sunny Boy.
• The DC current flow may not be interrupted via adaptors.
• Always disconnect the current flow first via the Electronic Solar Switch.
• Requirements for the modules of the connected strings: – same type – same number – identical alignment – identical tilt
• The connecting wires of the PV modules must be equipped with plug connectors in order that these DC plug connectors can be connected to the DC input sockets of the Sunny Boy.
A pre-assembled set for connecting the free cable ends of a string is available as optional accessory from SMA Solar Technology (see section 12 "Accessories" (page46)).
• The following limit values at the DC input of the Sunny Boy may not be exceeded:
Sunny Boy Maximum input voltage Maximum input current SB 1100 400 V (DC) 10 A (DC) SB 1200 400 V (DC) 12.6 A (DC) SB 1700 400 V (DC) 12.6 A (DC)
DANGER!
Risk of lethal electric shock or fire!
The maximum possible input current per string is limited by the plug connectors used. If the plug connector is overloaded, an electric arc may occur and there is a fire risk.
• Ensure that the input current for each string does not exceed the maximum flow current of the plug connectors used.
Installation Guide SB11_12_17-IEN100132 23
Electrical Connection SMA Solar Technology AG
Connection Procedure
DANGER!
Danger to life due to high voltages in the Sunny Boy!
• Before connecting the PV generator, ensure that the line circuit breaker is switched off.
1. Pull the Electronic Solar Switch downwards, slightly towards the wall.
2. Check the connection cables of the PV modules for correct polarity and compliance with the Sunny Boy's maximum input voltage of 400 V (DC).
NOTICE!
Exceeding the maximum input voltage can destroy the Sunny Boy!
If the voltage of the PV modules exceeds the maximum input voltage of the Sunny Boy, it can be destroyed by the overvoltage. All warranty claims become void.
• Do not connect strings to the Sunny Boy with open circuit voltage greater than the maximum input voltage of the Sunny Boy.
• Check the system design.
3. Check the strings for ground faults, as described in section 9.1.1 "Checking the PV Generator for Ground Fault" (page36).
DANGER!
Risk of lethal electric shock!
• Do not connect strings with ground faults.
• Firstly, clear the ground fault in the respective string.
24 SB11_12_17-IEN100132 Installation Guide
SMA Solar Technology AG Electrical Connection
4. Connect faultless strings of the PV generator.
5. Close unused DC input sockets with the protective caps provided.
6. Check the Electronic Solar Switch for wear, as described in section 8.1 "Check the Electronic Solar Switch for wear" (page35), and attach until it audibly locks into place.
NOTICE!
Manipulating the connector in the handle can damage the Electronic Solar Switch!
The connector within the handle must remain movable in order to ensure proper contact. Tightening the screw voids all warranty claims and creates a fire risk.
•Do not tighten the connector screw in the Electronic Solar Switch handle.
NOTICE!
The Electronic Solar Switch can be damaged if it is inserted incorrectly!
The Electric Solar Switch can be damaged by high voltages if it has not been attached properly.
• Press the handle firmly into place on the socket of the Electronic Solar Switch until it audibly locks into place.
• Check that the handle is securely in place.
☑ The PV generator is now connected.

5.6 Setting the installation country

Using the "Default" parameter you can set the installation country and/or the grid connection standard valid for the country via a communication device (e.g. Sunny WebBox) or a PC with appropriate software (e.g. Sunny Data Control). However, this is only required if the Sunny Boy was originally ordered for another country. The standard to which the Sunny Boy was set upon delivery is specified on the type plate.
Installation Guide SB11_12_17-IEN100132 25
Commissioning the Sunny Boy SMA Solar Technology AG

6 Commissioning the Sunny Boy

1. Check the following requirements before commissioning: – device is securely in place – correct connection of the AC cable (grid) – full connection of the DC cables (PV strings) – unused DC plug connectors on the underside of the enclosure are sealed with protecting
caps – the enclosure lid is securely screwed in place – the Electronic Solar Switch (ESS) is securely plugged – the line circuit breaker is laid out correctly
2. Switch on the line circuit breaker. ☑ The green LED is glowing or blinking if there is
enough radiation: commissioning has been successful.
or:
☑ The red or yellow LED is glowing or blinking:
there has been an error. Proceed to step 3.
A Green LED In operation B Red LED Ground fault or varistor
defective
C Yellow LED Disturbance
3. Read section 9 "Troubleshooting" (page36) and, if necessary, the user manual provided. The meaning of the LED's as well as the error messages and status messages on the display are described in this section.
26 SB11_12_17-IEN100132 Installation Guide
SMA Solar Technology AG Commissioning the Sunny Boy

6.1 Display

Feeding Operation
After fault-free grid connection of the Sunny Boy, it takes approximately one minute until the following display messages are shown alternately. The display messages shown before only have the purpose of indicating the initialization of the Sunny Boy and the process of controlling whether the power supply requirements are fulfilled.
• Initially, the energy generated on the respective da y and the c urre nt op erat ing m ode a re di spla yed.
E-today 0Wh Mode MPP
• After 5 seconds or by tapping on the enclosure lid, the current feed-in output and the input voltage appear.
• After a further 5 seconds, or when you tap again, the total energy produced and the time the Sunny Boy has been connected to the grid are displayed.
• Then the cycle is restarted.
Pac 903W Vpv 260V
Disturbance
• If a disturbance occurs, the message "Disturbance" will be shown in the status bar.
• The exact failure message follows. For example, if the grid disturbance message
shown here is displayed immediately after connection, it may be due to the fact that the AC wire is not correctly connected or the line circuit breaker has not been switched on yet.
• If the disturbance was caused by a measured value that does not correspond to the standard, the value measured at the time of the disturbance is displayed. If another measurement is possible, the present value is displayed in the second line.
The precise meaning of the error and status messages are described in the Sunny Boy's user manual provided.
E-today 0Wh Mode Disturbance
Disturbance
Vac-Bfr
at: 261W present: 245V
Installation Guide SB11_12_17-IEN100132 27
Commissioning the Sunny Boy SMA Solar Technology AG
PV overvoltage
!PV-Overvoltage!
!DISCONNECT DC!
NOTICE!
Excessive DC input voltage can destroy the Sunny Boy!
Immediately disconnect the Sunny Boy from the grid!
1. Turn off the line circuit breaker.
2. Remove the Electronic Solar Switch.
3. Disconnect the DC plug connectors.
1. Check DC voltage!
Result Action
☑ The DC voltage is higher than the
maximum input voltage.
☑ The DC voltage is lower than the
maximum input voltage.
• Contact the planner / installer of the PV generator.
• Reconnect the Sunny Boy to the PV generator as described in section
5.5 "Connecting the PV Generator (DC)" (page23).
2. If the message occurs again, disconnect the Sunny Boy again and contact the Serviceline of SMA Solar Technology (see section 13 "Contact" (page47)).
28 SB11_12_17-IEN100132 Installation Guide
SMA Solar Technology AG Commissioning the Sunny Boy

6.2 Blink Codes

Overview
Green Red Yellow Status
glows continuously is not glowing is not glowing OK (feeding operation)
glows continuously is not glowing Disturbance
glows continuously OK (initialization) Flashes quickly (3 x per second) Flashes slowly (1 x per second) Briefly goes out (Approx. 1x per
second) is not glowing is not glowing is not glowing OK (night shutdown)
Feeding Operation
After a fault-free grid connection of the Sunny Boy, it takes approximately one minute until the green LED is continuously on. The blink codes shown before only have the purpose of indicating the initialization of the Sunny Boy and the process of controlling whether the power supply requirements are fulfilled.
is not glowing is not glowing OK (stop) glows continuously is not glowing Disturbance is not glowing is not glowing OK (waiting, grid monitoring) glows continuously is not glowing Disturbance
is not glowing is not glowing OK (derating) glows continuously is not glowing Disturbance
glows/flashes Disturbance
glows continuously is not glowing Disturbance
glows/flashes Disturbance
Installation Guide SB11_12_17-IEN100132 29
Commissioning the Sunny Boy SMA Solar Technology AG
Disturbance or Fault
If the Sunny Boy detects a disturbance or fault, this event is indicated through a blink code of the yellow and, where applicable, the red LEDs.
For example, if the yellow LED glows for 5 seconds immediately after connection, then goes out for 3 seconds and then flashes briefly twice, there is a grid fault. This can be due to the fact that either the AC cable has not been connected correctly or the line circuit breaker has not yet been switched on.
Explanation of the Blink Codes
For a detailed description of the blink codes, see the provided Sunny Boy user manual.
30 SB11_12_17-IEN100132 Installation Guide
SMA Solar Technology AG Commissioning the Sunny Boy
PV overvoltage
(Yellow LED flashes 4 times quickly in succession)
NOTICE!
Excessive DC input voltage can destroy the Sunny Boy!
Immediately disconnect the Sunny Boy from the grid!
1. Turn off the line circuit breaker.
2. Remove the Electronic Solar Switch.
3. Disconnect the DC plug connectors.
1. Check DC voltage!
Result Action
☑ The DC voltage is higher than the
maximum input voltage.
☑ The DC voltage is lower than the
maximum input voltage.
• Contact the planner / installer of the PV generator.
• Reconnect the Sunny Boy to the PV generator as described in section
5.5 "Connecting the PV Generator (DC)" (page23).
2. If the message occurs again, disconnect the Sunny Boy again and contact the Serviceline of SMA Solar Technology (see section 13 "Contact" (page47)).
Installation Guide SB11_12_17-IEN100132 31
Opening and Closing SMA Solar Technology AG

7 Opening and Closing

NOTICE!
Electrostatic discharges can damage the Sunny Boy!
Internal components of the Sunny Boy can be irreparably damaged by electrostatic discharge.
• Ground yourself before touching a component.

7.1 Opening the Sunny Boy

DANGER!
Danger to life due to high voltages in the Sunny Boy!
Before you open the Sunny Boy:
• Switch off the line circuit breaker and secure it to prevent it from being reactivated.
1. Pull the Electronic Solar Switch downwards, slightly towards the wall.
DANGER!
Danger to life due to unsafe disconnection from the PV generator!
Safe disconnection from the PV generator is only guaranteed after removal of the Electronic Solar Switch and of all DC plug connectors.
• Remove the DC plug connector immediately to completely disconnect the PV generator from the Sunny Boy.
2. Disconnect the PV generator from the Sunny Boy.
3. Check whether all LEDs and the display have gone out.
32 SB11_12_17-IEN100132 Installation Guide
SMA Solar Technology AG Opening and Closing
DANGER!
Danger to life due to high voltages in the Sunny Boy!
The capacitors in the Sunny Boy require 15 minutes to discharge.
• Wait 15 minutes before opening the Sunny Boy.
4. Remove all screws from the enclosure lid and pull the lid forward smoothly.
5. Rem ove the PE c onnect ion fro m th e li d by loosen ing the locking device of the PE connection on the lid.
☑ The Sunny Boy is free of voltage and you can work
on it.

7.2 Closing the Sunny Boy

1. Connect the protective earth (PE) to the enclosure lid.
2. Sec ure the enc los ure lid of the Su nny Boy by ev enl y tightening the 4 lid screws.
3. Check the DC plug connector for correct polarity and connect it.
Installation Guide SB11_12_17-IEN100132 33
Opening and Closing SMA Solar Technology AG
4. Check the Electronic Solar Switch for wear, as described in section 8.1 "Check the Electronic Solar Switch for wear" (page35), and attach until it audibly locks into place.
NOTICE!
Manipulating the connector in the handle can damage the Electronic Solar Switch!
The connector within the handle must remain movable in order to ensure proper contact. Tightening the screw voids all warranty claims and creates a fire risk.
•Do not tighten the connector screw in the Electronic Solar Switch handle.
NOTICE!
The Electronic Solar Switch can be damaged if it is inserted incorrectly!
The Electric Solar Switch can be damaged by high voltages if it has not been attached properly.
• Press the handle firmly into place on the socket of the Electronic Solar Switch until it audibly locks into place.
• Check that the handle is securely in place.
5. Switch on the line circuit breaker.
6. Check whether the Sunny Boy's display and LED display indicate normal operating mode (see section 6 "Commissioning the Sunny Boy" (page26)).
34 SB11_12_17-IEN100132 Installation Guide
SMA Solar Technology AG Maintenance and Cleaning

8 Maintenance and Cleaning

Check the correct operation of the Sunny Boy at regular intervals. Impurities such as dust or pollen can cause heat accumulation that can lead to yield losses. Also check the Sunny Boy and the cables for visible external damage. Undertake repairs if necessary.

8.1 Check the Electronic Solar Switch for wear

Check the Electronic Solar Switch for wear before plugging it in.
Result Action
☑ The metal tongues inside the connector
have no damage and no discoloration.
1. Attach the Electronic Solar Switch handle.
2. Commission the Sunny Boy.
☑ The metal tongues inside the connector
have a brown discoloration or are burned off.
Installation Guide SB11_12_17-IEN100132 35
Th e El ectron ic S ola r Switc h ca n no longer rel iab ly disconnect the DC side.
1. Replace the Electronic Solar Switch handle before attaching it again (order number see section 12 "Accessories" (page46).
2. Commission the Sunny Boy.
Troubleshooting SMA Solar Technology AG

9 Troubleshooting

If the Sunny Boy displays other blink codes or display messages than those described in section 6 "Commissioning the Sunny Boy" (page26), refer to the associated user manual in order to obtain the precise meaning of the display messages or the blink codes and, if necessary, the error correction.
Do not undertake any repairs that are not described here, but rather use the 24-hour replacement service (the Sunny Boy will be sent within 24 hours) and the repair service of SMA Solar Technology.

9.1 The red LED is continuously on

If the red LED of the status display is continuously on during operation, there is either a ground fault in the PV generator or at least one of the varistors for the overvoltage protection is defective.

9.1.1 Checking the PV Generator for Ground Fault

1. Disconnect the Sunny Boy from both the DC and AC connections, as described in section 7.1 "Opening the Sunny Boy" (page32).
NOTICE!
Excessive voltages can destroy the measuring device!
• Only use measuring devices with a DC input voltage range up to at least 500 V.
2. Measure the voltages between the plus and minus pole of a string against the ground potential.
☑ If voltage is found, there is a ground fault in the
corresponding string.
DANGER!
Risk of lethal electric shock!
In case of a ground fault, the PV generator may carry high voltages.
• Do not touch the frame of the PV generator.
• Wait until no voltage can be measured.
• Do not connect strings with ground faults to the Sunny Boy.
36 SB11_12_17-IEN100132 Installation Guide
SMA Solar Technology AG Troubleshooting
The approximate position of the ground fault can be determined from the ratio of the measured voltages between plus against ground potential and minus against ground potential.
Example:
The ground fault is between the second and third module in this case.
3. Repeat step 2 for each string.
The table illustrated below shows the various results and corresponding measures.
Result Action
☑You have found a ground fault. • The installer of the PV generator must
remedy the ground fault in the affected string before you may reconnect the string to the Sunny Boy.
•Do not reconnect the faulty string.
• Close and commission the Sunny Boy as described in section 7.2 "Closing the Sunny Boy" (page33).
☑You have found no ground fault. It is likely that one of the thermally monitored
varistors is defective.
• Check the varistors as described in section
9.1.2 "Checking the Function of the Varistors" (page38).
☑ The ground fault check is finished.
Installation Guide SB11_12_17-IEN100132 37
Troubleshooting SMA Solar Technology AG

9.1.2 Checking the Function of the Varistors

Varistors are wearing parts. Their functioning becomes restricted through aging or due to repeated responses as a result of overvoltages. It is therefore possible that one of the thermally monitored varistors has lost its protective function, and thus the red LED is lit.
Position of varistors
You can determine the position of the varistors with the help of the illustration below. Observe the following allocation of the
terminals:
• Terminal A: outer terminal (varistor connection with loop [crimp])
• Terminal B: middle terminal
• Terminal C: outer terminal (varistor connection without loop [crimp])
Check the function of the varistors as described below:
1. Open the Sunny Boy as described in section 7.1 "Opening the Sunny Boy" (page32).
2. With the aid of a multimeter, determine for both varistors in the installed state whether a conductive connection exists between connectors B and C.
Result Action
☑There is a conducting connection. There is probably another fault in the Sunny Boy.
• Close the Sunny Boy as described in section
7.2 "Closing the Sunny Boy" (page33).
• Contact the SMA Serviceline (see section 13 "Contact" (page47)).
38 SB11_12_17-IEN100132 Installation Guide
SMA Solar Technology AG Troubleshooting
Result Action
☑There is no conducting
connection.
The respective varistor is not working and must be replaced.
Varistor failure is generally due to influences which affect all varistors similarly (temperature, age, induced overvoltage). SMA Solar Technology recommends that you replace both varistors.
The varistors are specially manufactured for use in the Sunny Boy and are not commerciall y av ail abl e. T hey mus t be ordered directly from SMA Solar Technology (see section 12 "Accessories" (page46)).
• To replace the varistors, proceed to step 3.
NOTICE!
The Sunny Boy could be irreparably damaged by overvoltage!
If varistors are missing, the Sunny Boy is no longer protected against overvoltages.
• Replacement varistors should be obtained as soon as possible.
•Do not operate the Sunny Boy without varistors in systems with a high risk of overvoltages.
3. Insert an insertion tool into the openings of the terminal contacts (1).
☑ The terminals will loosen. If you do not receive an insertion tool for operating
the terminal clamps with your replacement varistors, contact SMA Solar Technology. The terminal contacts can also be provisionally serviced by a screwdriver with a 3.5 mm blade width.
4. Remove the varistor (2).
5. Insert new varistor. The pole with the small loop (crimp) must be fitted
to terminal A (3) when remounting.
6. Close the Sunny Boy as described in section
7.2 "Closing the Sunny Boy" (page33).
☑ The check of the varistors is completed.
Installation Guide SB11_12_17-IEN100132 39
Decommissioning SMA Solar Technology AG

10 Decommissioning

10.1 Removing the Sunny Boy

CAUTION!
Risk of injury due to the heavy weight of the Sunny Boy!
• Take the weight of the Sunny Boy of approx. 25 kg into account.
1. Open the Sunny Boy as described in section 7.1 "Opening the Sunny Boy" (page32).
2. Remove all cables from the Sunny Boy.
3. Close the Sunny Boy: fasten the enclosure lid to the Sunny Boy with the 4 screws.
4. Loosen the lower screw between the Sunny Boy und wall mounting bracket.
5. Remove the Sunny Boy from the wall mounting bracket.
☑ The Sunny Boy has been removed.
40 SB11_12_17-IEN100132 Installation Guide
SMA Solar Technology AG Decommissioning

10.2 Packaging the Sunny Boy

If possible, always package the Sunny Boy in the original packaging. If this is no longer available, you can also use an equivalent box. The box must be completely closeable and made to support both the weight and size of the Sunny Boy.

10.3 Storing the Sunny Boy

Store the Sunny Boy in a dry place where ambient temperatures are always between -25 °C and +60 °C.

10.4 Disposing of the Sunny Boy

Dispose of the Sunny Boy at the end of its service life in accordance with the disposal regulations for electronic waste which apply at the installation site at that time. Alternatively, send it back to SMA Solar Technology with shipping paid by sender, and labeled "ZUR ENTSORGUNG" ("for disposal") (see section 13 "Contact" (page47).
Installation Guide SB11_12_17-IEN100132 41
Technical Data SMA Solar Technology AG

11 Technical Data

PV generator connection data SB 1100 SB 1200 SB 1700
a)
Max. input voltage U Input voltage, MPP range U PV start voltage, adjustable U Max. input current I Max. input power P Voltage ripple U Internal consumption during
operation
a) The maximum open circuit voltage, which can occur at a cell temperature of 10 °C, may not exceed the maximum input voltage.
DC Max
PV
PV Start
PV Max
DC
PP
139 V ... 320 V 100 V ... 320 V 139 V ... 320 V
180 V 120 V 180 V
10 A 12.6 A 12.6 A
1210 W 1320 W 1850 W
< 10 % of the input voltage
< 4 W
(standby)
400 V
< 4 W
(standby)
< 5 W
(standby)
Grid connection data SB 1100 SB 1200 SB 1700
Nominal output power P Peak output power P Nominal output current I Max. output current I
AC nom
AC max
AC nom
AC max
1000 W 1200 W 1550 W 1100 W 1200 W 1700 W
4.4 A 5.2 A 6.7 A
5.6 A 6.1 A 8.6 A Max. fuse protection 16 A Harmonic distortion of output current
(at K
< 2 %, PAC > 0.5 P
Ugrid
ACnom
K
IAC
)
< 3 %
Short Circuit Proof grid-side via current regulation Nominal operating voltage U Voltage range
AC nom
U
AC
220 V / 230 V / 240 V
180 V ... 260 V (extended operating range) Nominal operating frequency f
Frequency range (extended operating range) Power factor (at nominal output
AC nom
f
AC
cos ϕ 1
50 Hz / 60 Hz
50 Hz: 45.5 Hz ... 54.5 Hz 60 Hz: 55.5 Hz ... 64.5 Hz
power) Overvoltage category III Test voltage (DC) 1.7 kV (1 s routine testing / 5 s type testing) Test surge voltage 4 kV (serial interface: 6 kV) Internal consumption in night
0.1 W
operation
42 SB11_12_17-IEN100132 Installation Guide
SMA Solar Technology AG Technical Data
General data SB1100 SB 1200 SB1700
EC Declaration of Conformity You can download the EC Declaration of Conformity
in the download area at www.SMA.de/en under
Certificates. Dimensions (W x H x D) 440 mm x 339 mm x 214 mm (approx.) Weight approx. 22 kg approx. 23 kg approx. 25 kg Protection rating according to DIN EN
IP65
60529 Climatic conditions according to DIN EN 50178:1998 - 04 Location of type C: Class 4K4H
Extended temperature range: -25 °C ... +60 °C
Extended humidity range: 0 ... 100 %
Extended air pressure range: 79.5 kPa ... 106 kPa
Transport of type E: Class 2K3
Temperature range -25 °C ... +70 °C Operating temperature range -25 °C ...+60 °C Max. operating altitude 2000 m above mean sea level Topology Low frequency transformer Protection class I Noise emission (typical) ≤ 39 dB(A) ≤ 41 dB(A) ≤ 46 dB(A)
Protective function DC side
All-pole disconnection unit on the DC input
Electronic Solar Switch, DC plug connector
side Overvoltage protection Thermally monitored varistors Personal protection Insulation monitoring (Riso > 1MOhm) Pole Confusion Protection Via short-circuit diode
Protective function AC side
Short Circuit Proof Current control All-pole disconnection unit grid side Automatic disconnection device
(SMA Grid Guard 2.1),
double implementation
Installation Guide SB11_12_17-IEN100132 43
Technical Data SMA Solar Technology AG
Communication interfaces SB 1100 SB 1200 SB 1700
RS485 (galvanically isolated) optional Radio optional
Electronic Solar Switch (ESS)
Electrical lifetime (in the event of a short
Min. 50 switching processes
circuit, with a nominal current of 30 A) Maximum switching current 30 A Maximum switching voltage 800 V Maximum PV power approx. 10 kW Protection rating when plugged IP65 Protection rating when unplugged IP21
Efficiency SB1100 SB 1200 SB1700
Max. efficiency η European efficiency η
max.
euro
93 % 92.1 % 93.5 %
91.6 % 90.7 % 91.8 %
Efficiency curves
Sunny Boy 1200
44 SB11_12_17-IEN100132 Installation Guide
SMA Solar Technology AG Technical Data
Sunny Boy 1700
Installation Guide SB11_12_17-IEN100132 45
Accessories SMA Solar Technology AG

12 Accessories

In the following overview you will find the corresponding accessories and replacement parts for your product. If needed, you can order these from SMA Solar Technology or your dealer.
Designation Brief description SB 1100 / 1200 / 1700
SMA order number
DC connection set Multi-Contact 3 mm
DC connection set Multi-Contact 4 mm
Tyco DC connection set TYCO adapter set, max. flow
Electronic Solar Switch ESS handle replacement part ESS-HANDLE:01 Replacement varistors Set of thermally monitored varistors
Insertion tool for replacing the varistors
Positive grounding set Upgrade kit for the positive
Negative grounding set Upgrade kit for the negative
RS485 upgrade kit RS485 interface 485PB-NR Radio upgrade kit Radio Piggy-Back for upgrading a
®
Bluetooth
Wireless
Technology upgrade kit
Multi-contact 3 adapter set max.
SWR-MC
flow current: 21 A Multi-contact 4 adapter set max.
MC-SET
flow current: 30 A
TYCO-SET
current: 30 A
SB-TV3 (2 pcs.) including insertion tool SB-TVWZ
Insertion tool for varistor sets SB-TVWZ
ESHV-P-NR
connection to ground of the DC input
ESHV-N-NR
connection to ground of the DC input
BEAMPB-NR Sunny Boy for communication with Sunny Beam, including antenna, coaxial cable, and PG cable gland (metal)
Bluetooth interface On request
46 SB11_12_17-IEN100132 Installation Guide
SMA Solar Technology AG Contact

13 Contact

If you have technical problems concerning our products, contact the S MA Servicelin e. We require t he following information in order to provide you with the necessary assistance:
• Inverter type
• Type and number of modules connected
•Communication type
• Serial number of the Sunny Boy
• Blink code or display of the Sunny Boy
SMA Solar Technology AG
Sonnenallee 1 34266 Niestetal, Germany www.SMA.de
Serviceline
Inverters: +49 561 9522 1499 Communication: +49 561 9522 2499 Fax: +49 561 9522 4699 E-mail: Serviceline@SMA.de
Installation Guide SB11_12_17-IEN100132 47
Contact SMA Solar Technology AG
48 SB11_12_17-IEN100132 Installation Guide
SMA Solar Technology AG Contact
Installation Guide SB11_12_17-IEN100132 49
Contact SMA Solar Technology AG
50 SB11_12_17-IEN100132 Installation Guide
SMA Solar Technology AG Legal Restrictions
The information contained in this document is the property of SMA Solar Technology AG. Publishing its content, either partially or in full, requires the written permission of SMA Solar Technology AG. Any internal company copying of the document for the purposes of evaluating the product or its correct implementation is allowed and does not require permission.
Exclusion of liability
The general terms and conditions of delivery of SMA Solar Technology AG shall apply. The content of these documents is continually checked and amended, where necessary. However, discrepancies cannot be
excluded. No guarantee is made for the completeness of these documents. The latest version is available online at www.SMA.de or from the usual sales channels.
Guarantee or liability claims for damages of any kind are excluded if they are caused by one or more of the following:
• Damages during transportation
• Improper or inappropriate use of the product
• Operating the product in an unintended environment
• Operating the product whilst ignoring relevant, statutory safety regulations in the deployment location
• Ignoring safety warnings and instructions contained in all documents relevant to the product
• Operating the product under incorrect safety or protection conditions
• Altering the product or supplied software without authority
• The product malfunctions due to operating attached or neighboring devices beyond statutory limit values
• In case of unforeseen calamity or force majeure The use of supplied software produced by SMA Solar Technology AG is subject to the following conditions:
• SMA Solar Technology AG rejects any liability for direct or indirect damages arising from the use of software developed by SMA Solar Technology AG. This also applies to the provision or non-provision of support activities.
• Supplied software not developed by SMA Solar Technology AG is subject to the respective licensing and liability agreements of the manufacturer.
SMA Factory Warranty
The current guarantee conditions come enclosed with your device. These are also available online at www.SMA.de and can be downloaded or are available on paper from the usual sales channels if required.
Trademarks
All trademarks are recognized even if these are not marked separately. Missing designations do not mean that a product or brand is not a registered trademark.
The Bluetooth Solar Technology is under license.
SMA Solar Technology AG
Sonnenallee 1 34266 Niestetal Germany Tel. +49 561 9522-0 Fax +49 561 9522-100 www.SMA.de E-Mail: info@SMA.de © 2004 to 2009 SMA Solar Technology AG. All rights reserved
®
wor d mark an d logos a re regis tered tr ademark s owned b y Blueto oth S IG, In c. an d any u se of s uch mark s by SMA
Installation Guide SB11_12_17-IEN100132 51
SMA Solar Technology AG
www.SMA.de
Loading...