Samsung Electronics
2-1
2. Disassembly and Reassembly
2-1 Cabinet and PCB
2-1-1 Top Cabinet Removal
1) Remove 3 Screws Œ on the back Top Cabinet.
2) Lift up the Top Cabinet in direction of arrow.
Fig. 2-1 Top Cabinet Removal
Note : Reassembly in reverse order.
2-2
Samsung Electronics
Disassembly and Reaasembly
2-1-2 Door-Tray Removal
1) Supply power and open Tray Œ.
2) Disassemble the Door-Tray ´ in direction of arrow “A”.
3) Close Tray Œ and power off.
Note : If Tray Œ doesn’t open, insert a Screw driver ¨ into the Emergency hole ˇ (as shown in detailed draw-
ing) and then push it in the direction of arrow “B”. Open Tray manually.
<Side View>
ˇ EMERGENCY HOLE
¨ SCREW DRIVER
"B"
Œ TRAY
´ DOOR-TRAY
"A"
Fig. 2-2 Door-Tray Removal
Disassembly and Reaasembly
Samsung Electronics
2-3
Œ KNOB-VOLUME
ˆ 2 HOOKS
´ 2 HOOKS
Ø ASS'Y FRONT-CABINET
’ KEY PCB
” 5 SCREWS
∏ KNOB-JOG
¨ 1 HOOK
ˇ 1 HOOK
Fig. 2-3 Ass’y Front-Cabinet Removal (DVD-S221/S222/S320)
2-1-3 Ass’y Front-Cabinet Removal
<DVD-S221/S222/S320>
1) Release 6 Hooks Œ, ´, ˇ, ¨ and remove Ass’y Front-Cabinet ˆ.
<DVD-S321>
1) Remove Knob-Volume Œ.
2) Release 6 Hooks ´, ˇ, ¨, ˆ and remove Ass’y Front-Cabinet Ø.
3) Remove Knob-Jog ∏, 5 Screws ”, and Key PCB ’.
Fig. 2-4 Ass’y Front-Cabinet Removal (DVD-S321)
¨ 2 HOOKS
Œ 2 HOOKS
ˆ ASS'Y FRONT-CABINET
ˇ 1 HOOK
´ 1 HOOK
2-4
Samsung Electronics
Disassembly and Reaasembly
DECK-ASS'Y
Œ 3 SCREWS
DCN1
DCN2
DCN3
FLAT-CABLE
CONNECT-WIRE
MAIN PCB
2-1-4 Ass’y Deck Removal
1) Disconnect Flat-Cable,Connect-Wire from DCN1, DCN2 and DCN3 on Main PCB.
2) Remove 3 Screws Œ from the Ass’y Deck and lift it up.
Fig. 2-5 Ass’y Deck Removal
Disassembly and Reaasembly
Samsung Electronics
2-5
ˆ MAIN PCB
¨ 3 SCREWS
´ 1 SCREW
Œ 2 SCREWS
ˇ JACK PCB
Fig. 2-6 Main PCB, Jack PCB Removal
2-1-5 Main PCB, Jack PCB Removal
1) Remove 3 Screws Œ, ´ and lift up the Jack PCB ˇ.
2) Remove 3 Screws ¨ and lift up the Main PCB ˆ.