Rockwell Automation 1195C-LK1 User Manual

Bulletin 1102C Vacuum Contactor Lug Kits
(Cat 1195C-LK1, -LK2, -LK3)
ATTENTION: To prevent electrical shock, disconnect from power source before installing or servicing.
Lug Installation (Cat 1195C-LK1)--Wire Range: #2/0 - 250 MCM Vacuum Contactor - 200A
1. Remove existing 5/16 hardware.
2. Trim end of boot and slide over center phase conductor.
3. Assemble lugs to power terminals using hardware supplied in kit. Torque screws to 125 - 145 lb-inches.
4. Connect conductors. Torque lug set screws to 275 lb-inches.
5/16-18 x 3/4 Bolt
125 - 145 lb-in
5/16 Lock Washer
V
A
CU
5/16 Flat Washer
5/16" Allen Wrench
U
M
CON
T
A
C
T
OR
275 lb-in
Lug
Boot
(shown installed over
center phase Lug)
Trim end of Boot to
slide over conductor
prior to installing Lug
Lug Installation (Cat 1195C-LK2)--Wire Range: (2) #6 - 300 MCM  Vacuum Contactor - 400A
5/16" Allen Wrench
3/8-16 Nut
3/8 Lock Washer
3/8 Flat Washer
Anti-Rotation Clip
275 lb-in
Lug
3/8-16 x 1-1/2" Bolt
3/8 Flat Washer
180 - 210 lb-in
V
A
C
UU
M
CO
N
T
A
C
TO
R
Lug Installation (Cat 1195C-LK3)--Wire Range: (2) #2 - 600 MCM  Vacuum Contactor - 600A
180 - 210 lb-in
VA
C
UU
M
3/8-16 Nut
3/8 Lock Washer
3/8 Flat Washer
3/8" Allen Wrench
375 lb-in
CON
TAC
T
OR
Lug
3/8 Flat Washer
3/8-16 x 1-3/4" Bolt
42052-097-01 (1)
Printed in U.S.A.
Loading...