Installation Instructions
Installation Instructions
for the Integra™ N400 3-lb. Scale
for the Integra™ N400 3-lb. Scale
1
○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○
2
Do not connect power until Step 10.
Make sure you have:
✓ Scale
✓ User Guide
✓ Power Cord (in its own box)
✓ Scale-Meter Interface Cable
(if ordered, packed separately)
Power Cord
Scale-Meter Interface Cable
(if ordered, packed separately)
Scale
○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○
User Guide
Place your scale on a level
3
surface.
Place the scale near a wall outlet and within
cable reach of your postage meter (if you
have one). IMPORTANT: Ensure the scale
location is free of drafts and the scale is not
touching objects that may affect the weight
reading.
SV60406 Rev. E 2/00 ©2000 Pitney Bowes Inc. Fifth Edition, February 2000. All Rights Reserved. Printed in USA.
Your Pitney Bowes
postage meter
1
4
Lift the
platter,
remove the
packing
material,
and replace
the platter on the scale.
○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○
Remove packing. Level the scale.
5
Adjustable
Feet (4)
Level the scale by turning the scale feet until
the leveling bubble is centered and the scale
does not wobble.
Bubble
must be
in center.
6
Locate
the plug
ports
under the
front of the scale
and plug in the small end
of the power cord.
○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○
Locate the plug ports.
If you're
using a
Pitney Bowes
meter, plug the small end of the scale-meter
interface cable into the scale port.
Tuck the cord(s) under the
8
guides.
9
Connect scale-meter interface
7
cable to scale.
Connect scale-meter interface
cable to meter.
Tuck the
cord(s)
under the
guides on the
bottom of the
scale.
2
or
If you're using a Pitney Bowes meter, connect
the large end of the scale-meter interface
cable to your meter's communications port.
Tighten the thumbscrews securely. See the
meter's operating guide for the location of
the port.