Nokia T6AQ2, T5AP1 Manual

0 (0)

SCt300 BTS Hardware

Installation, ATP and FRU

Procedures Software Release 2.15.x.x

English

DEC 2000 68P09224A55±1

SCt300

CDMA

PRELIMINARY

Notice

Whilereasonable efforts have been made to assure the accuracy of this document, Motorola, Inc. assumes no liability resulting from any inaccuracies or omissions in this document, or from use of the information obtained herein. The information in this document has been carefully checked and is believed to be entirely reliable. However, no responsibility is assumed for inaccuracies or omissions. Motorola, Inc. reserves the right to make changes to any products described herein and reserves the right to revise this document and to make changes from time to time in content hereof with no obligation to notify any person of revisions or changes. Motorola, Inc. does not assume any liability arising out of the application or use of any product, software, or circuit described herein; neither does it convey license under its patent rights or the rights of others.

It is possible that this publication may contain references to, or information about Motorola products (machines and programs), programming, or services that are not announced in your country. Such references or information must not be construed to mean that Motorola intends to announce such Motorola products, programming, or services in your country.

Copyrights

This instruction manual, and the Motorola products described in this instruction manual may be, include or describe copyrighted Motorola material, such as computer programs stored in semiconductor memories or other media. Laws in the United States and other countries preserve for Motorola certain exclusive rights for copyrighted material, including the exclusive right to copy, reproduce in any form, distribute and make derivative works of the copyrighted material. Accordingly, any copyrighted Motorola material contained herein or in the Motorola products described in this instruction manual may not be copied, reproduced, distributed, merged or modified in any manner without the express written permission of Motorola. Furthermore, the purchase of Motorola products shall not be deemed to grant either directly or by implication, estoppel, or otherwise, any license under the copyrights, patents or patent applications of Motorola, as arises by operation of law in the sale of a product.

Usage and Disclosure Restrictions

License Agreement

The software described in this document is the property of Motorola, Inc. It is furnished by express license agreement only and may be used only in accordance with the terms of such an agreement.

Copyrighted Materials

Software and documentation are copyrighted materials. Making unauthorized copies is prohibited by law. No part of the software or documentation may be reproduced, transmitted, transcribed, stored in a retrieval system, or translated into any language or computer language, in any form or by any means, without prior written permission of Motorola, Inc.

High Risk Activities

Components, units, or third±party products used in the product described herein are NOT fault±tolerant and are NOT designed, manufactured, or intended for use as on±line control equipment in the following hazardous environments requiring fail±safe controls: the operation of Nuclear Facilities, Aircraft Navigation or Aircraft Communication Systems, Air Traffic Control, Life Support, or Weapons Systems (ªHigh Risk Activitiesº). Motorola and its supplier(s) specifically disclaim any expressed or implied warranty of fitness for such High Risk Activities.

Trademarks

and Motorola are registered trademarks of Motorola, Inc.

Product and service names profiled herein are trademarks of Motorola, Inc. Other manufacturers' products or services profiled herein may be referred to by trademarks of their respective companies.

Copyright

Copyright 2000 Motorola, Inc.

All Rights Reserved

Printed on

Recyclable Paper

REV010600

SPECIFICATIONS SUBJECT TO CHANGE WITHOUT NOTICE

PRELIMINARY

Table of Contents SCt300 BTS Hardware Installation, ATP and FRU Procedures

Software Release 2.15.x.x

List of Figures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

v

List of Tables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

xi

Foreword . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

xvii

General Safety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

xx

Revision History . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

xxii

Patent Notification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

xxiii

Chapter 1: Introduction

Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1-1

Required Documents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1-11

Installation Tools and Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1-12

ATP Tools and Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1-16

FRU Tools and Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1-21

Unit Identification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1-22

Installation and ATP Order . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1-32

Chapter 2: Site Preparation

Site Preparation Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

2-1

Site Inspections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

2-2

Prepare Site for the Arrival of the Equipment . . . . . . . . . . . . . . . . . . . . . . . . . .

2-6

Dimensions and Clearances . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

2-8

Chapter 3: Installing Mounting Bracket and Remote GPS

 

Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

3-1

 

Unpacking the Equipment and Inspecting for Damage . . . . . . . . . . . . . . . . . . .

3-2

 

Attaching the Mounting Bracket to a Wall . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

3-4

 

Attaching the Mounting Bracket to a Ceiling . . . . . . . . . . . . . . . . . . . . . . . . . . .

3-9

 

Attaching the Mounting Bracket to a Pole . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

3-12

 

Attaching the Mounting Bracket to a Rack . . . . . . . . . . . . . . . . . . . . . . . . . . . .

3-16

 

Attaching Back Solar Cover to Mounting Bracket . . . . . . . . . . . . . . . . . . . . . . .

3-19

 

Remote GPS Head Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

3-21

 

 

 

DEC 2000

SCt300 BTS Hardware Installation, ATP and FRU Procedures

i

PRELIMINARY

Table of Contents ± continued

Chapter 4: Preparing Site Cabling for Sites Equipped with

Customer±Supplied Site I/O Interface

Cabling Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

4-1

Cable Descriptions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

4-2

Site Cabling for BTS With Customer±Supplied Site I/O Interface . . . . . . . . . .

4-8

Power, Ground, and Battery Cabling for Sites Equipped With

 

Customer±Supplied Site I/O Interface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

4-16

Antenna Cabling for Sites Equipped With

 

Customer±Supplied Site I/O Interface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

4-21

Site I/O , Span Line, RGPS and Modem Cabling for Sites Equipped With

 

Customer±Supplied Site I/O Interface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

4-24

RGPS Cabling for Multi±BTS Configurations . . . . . . . . . . . . . . . . . . . . . . . . .

4-31

Span Line Daisy Chain Cabling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

4-36

Chapter 5: Preparing Site Cabling for Sites Equipped with

Optional Primary Surge Suppressor

Cabling Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5-1

Site Cabling for BTS With Optional Primary Surge Suppressor . . . . . . . . . . . .

5-2

Attaching Surge Suppressor to Mounting Bracket . . . . . . . . . . . . . . . . . . . . . . .

5-10

Power, Ground and Battery Cabling for Sites Equipped With

 

Optional Primary Surge Suppressor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5-12

Antenna Cabling for Sites Equipped With Optional Primary Surge Suppressor

5-18

Site I/O, Span Line, RGPS and Modem Cabling for Sites Equipped With

 

Primary Surge Suppressor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5-24

RGPS Cabling for Multi±BTS Configurations Equipped with

 

Optional Primary Surge Suppressor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5-32

Span Line Daisy Chain Cabling for Sites Equipped with

 

Optional Primary Surge Suppressor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5-37

Chapter 6: Installing the Unit and Installation Check Off List

 

Unit Installation Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. 6-1

 

Connector Locations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

6-2

 

Attaching Back Fin Cover to Unit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

6-5

 

Attaching Optional Installation Handles to the Unit . . . . . . . . . . . . . . . . . . . . .

6-6

 

Attaching Unit to Mounting Bracket . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

6-8

 

Earth Ground Cabling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

6-11

 

Attaching Front Fin Cover to Unit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

6-14

 

Attaching the Site I/O Junction Box to the Unit . . . . . . . . . . . . . . . . . . . . . . . .

6-15

 

Attaching the Short Duration Battery to the Unit (optional) . . . . . . . . . . . . . . .

6-17

 

Short Duration Battery Cabling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

6-19

 

AC Power Cabling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

6-21

 

 

 

ii

SCt300 BTS Hardware Installation, ATP and FRU Procedures

DEC 2000

PRELIMINARY

Table of Contents ± continued

DC Power Cabling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

6-23

Antenna Cabling for Sites Equipped With

 

Customer±Supplied Site I/O Interface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

6-25

Antenna Cabling for Sites Equipped with

 

Optional Primary Surge Suppressor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

6-30

MIB Cabling for Multi±Unit Configurations . . . . . . . . . . . . . . . . . . . . . . . . . . .

6-38

SU Cabling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

6-44

Terminating Unused Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

6-51

Powering on Unit and Mounting the Solar Cover . . . . . . . . . . . . . . . . . . . . . . .

6-52

Site Cleanup . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

6-56

Installation Completion Checklist . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

6-57

Chapter 7: Optimization and Optional Acceptance Test Procedures (ATP)

ATP Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7-1

BTS Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7-2

Test Equipment and LMF Connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7-7

BTS Configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7-15

BTS Software . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7-24

Test Equipment Setup . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7-29

Test Equipment Selection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7-37

Power Meter Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7-38

Test Cable Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7-39

Create CAL File . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7-42

RF Path Audit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7-44

Acceptance Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7-46

CDMA Operating Frequency Programming Information ± North American

 

PCS Bands . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7-48

TX & RX Acceptance Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7-53

Generate an ATP Report . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7-60

Copy LMF CAL File to CBSC . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7-61

Prepare to Leave the Site . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7-63

Chapter 8: Optimization and Optional Acceptance Test Procedures (ATP) for Frequency Hopping Pilot Beacon (FHPB)

 

ATP Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-1

 

Create CAL File . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-2

 

RF Path Audit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-4

 

Acceptance Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-6

 

TX Acceptance Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-8

 

 

 

DEC 2000

SCt300 BTS Hardware Installation, ATP and FRU Procedures

iii

PRELIMINARY

Table of Contents ± continued

Generate an ATP Report . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-11

Copy LMF CAL File to CBSC . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-12

Chapter 9: Field Replaceable Unit (FRU) Procedures

Field Replaceable Unit (FRU) Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-1

Shut Down & Restoring BTS Signaling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-4

Site I/O Junction Box Replacement Procedure . . . . . . . . . . . . . . . . . . . . . . . . .

9-13

Short Duration Battery Replacement Procedures . . . . . . . . . . . . . . . . . . . . . . . .

9-16

Remote GPS Replacement Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-19

Full Unit Replacement Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-21

Appendix A: Outdoor Grounding Guidelines Overview

Outdoor Grounding Guidelines Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

A-1

Index

iv

SCt300 BTS Hardware Installation, ATP and FRU Procedures

DEC 2000

PRELIMINARY

List of Figures

SCt300 BTS Hardware Installation, ATP and FRU Procedures

Software Release 2.15.x.x

 

Figure 1-1: MicroCell Unit Mounted on a Wall . . . . . . . . . . . . . . . . . . . . . . . . .

1-4

 

Figure 1-2: Primary Surge Suppressor Mounted on a Wall . . . . . . . . . . . . . . . .

1-5

 

Figure 1-3: MicroCell Unit Mounted on a Rack . . . . . . . . . . . . . . . . . . . . . . . .

1-6

 

Figure 1-4: Primary Surge Suppressor Mounted on a Rack . . . . . . . . . . . . . . . .

1-7

 

Figure 1-5: MicroCell Unit Mounted on a Pole . . . . . . . . . . . . . . . . . . . . . . . . .

1-8

 

Figure 1-6: Primary Surge Suppressor Mounted on a Pole . . . . . . . . . . . . . . . .

1-9

 

Figure 1-7: PicoCell Unit Mounted on a Ceiling . . . . . . . . . . . . . . . . . . . . . . . .

1-10

 

Figure 1-8: RS232±IEEE488 Converter Serial Cable Configuration . . . . . . . . .

1-18

 

Figure 1-9: General Block Diagram Showing the Port Names . . . . . . . . . . . . .

1-22

 

Figure 1-10: General Block Diagram Showing the Unit, Site I/O Interface, and

 

 

External Items . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1-23

 

Figure 1-11: Microcell and Picocell Unit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1-24

 

Figure 1-12: Site I/O Junction Box and Cable . . . . . . . . . . . . . . . . . . . . . . . . . .

1-24

 

Figure 1-13: Primary Surge Suppressor (Optional) . . . . . . . . . . . . . . . . . . . . . .

1-25

 

Figure 1-14: AC Installation Box (Optional) . . . . . . . . . . . . . . . . . . . . . . . . . . .

1-25

 

Figure 1-15: Mounting Bracket for both Microcell and

 

 

Primary Surge Suppressor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1-26

 

Figure 1-16: Mounting Bracket for Picocell . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1-26

 

Figure 1-17: Adapters for Rack Mounting . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1-27

 

Figure 1-18: Adapters for Pole Mounting . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1-28

 

Figure 1-19: Adapter for Ceiling Mounting (Optional) . . . . . . . . . . . . . . . . . . .

1-29

 

Figure 1-20: Installation Handles for Lifting Unit (Optional) . . . . . . . . . . . . . .

1-29

 

Figure 1-21: Short Duration Battery (Optional) . . . . . . . . . . . . . . . . . . . . . . . . .

1-29

 

Figure 1-22: Front and Back Solar Covers for MicroCell . . . . . . . . . . . . . . . . .

1-30

 

Figure 1-23: Front and Back Solar Covers for Surge Suppressor . . . . . . . . . . .

1-30

 

Figure 1-24: Front and Back Fin Covers for MicroCell and

 

 

PicoCell (PicoCell shown) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1-31

 

Figure 2-1: Securing Lights with Tape . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

2-6

 

Figure 2-2: Overall Dimensions of MicroCell and PicoCell Units . . . . . . . . . .

2-10

 

Figure 2-3: Overall Dimensions of Primary Surge Suppressor . . . . . . . . . . . . .

2-11

 

 

 

DEC 2000

SCt300 BTS Hardware Installation, ATP and FRU Procedures

v

PRELIMINARY

List of Figures ± continued

 

Figure 2-4: Installation and Functional Clearances for MicroCell Units

 

 

 

(with Solar Covers) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

.

2-12

 

Figure 2-5: Installation and Functional Clearances for MicroCell Units

 

 

 

(without Solar Covers) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

 

2-13

 

Figure 2-6: Installation and Functional Clearances for PicoCell Units

 

 

 

(without Solar Covers) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

 

2-14

 

Figure 2-7: Installation and Functional Clearances for Primary Surge Suppressor

 

 

(without Solar Covers) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

 

2-15

 

Figure 2-8: Installation and Functional Clearances for Primary Surge Suppressor

 

 

(with Solar Covers) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

 

2-16

 

Figure 2-9: Installation and Functional Clearances for

 

 

 

PicoCell Unit Mounted to Ceiling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

 

2-17

 

Figure 2-10: Concept of Functionality Clearances for MicroCell and

 

 

 

PicoCell Units . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

 

2-18

 

Figure 3-1: Holes to Use to Mount the Bracket to the Wall . . . . . . . . . . . . . . . .

 

3-4

 

Figure 3-2: Securing Mounting Bracket to a Wall . . . . . . . . . . . . . . . . . . . . . . .

 

3-8

 

Figure 3-3: Picocell Ceiling Mounting Bracket . . . . . . . . . . . . . . . . . . . . . . . . .

 

3-10

 

Figure 3-4: Securing Mounting Bracket to the Adapter . . . . . . . . . . . . . . . . . . .

 

3-11

 

Figure 3-5: Pole Adapter and Straps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

 

3-14

 

Figure 3-6: Attaching Mounting Bracket to a Pole . . . . . . . . . . . . . . . . . . . . . .

 

3-15

 

Figure 3-7: Attaching the Mounting Bracket to a Rack . . . . . . . . . . . . . . . . . . .

 

3-18

 

Figure 3-8: Attaching MicroCell Back Solar Cover to Mounting Bracket . . . .

3-20

 

Figure 3-9: Installing the Remote GPS Head . . . . . . . . . . . . . . . . . . . . . . . . . . .

 

3-22

 

Figure 4-1: Site Cabling for One Microcell . . . . . . . . . . . . . . . . . . . . . . . . . . . .

 

4-8

 

Figure 4-2: Site Cabling for Two Microcells . . . . . . . . . . . . . . . . . . . . . . . . . . .

 

4-9

 

Figure 4-3: Site Cabling for Three Microcells . . . . . . . . . . . . . . . . . . . . . . . . . .

 

4-10

 

Figure 4-4: Site Cabling for Four Microcells . . . . . . . . . . . . . . . . . . . . . . . . . . .

 

4-11

 

Figure 4-5: Site Cabling for One Picocell . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

 

4-12

 

Figure 4-6: Site Cabling for Two Picocells . . . . . . . . . . . . . . . . . . . . . . . . . . . .

 

4-13

 

Figure 4-7: Site Cabling for Three Picocells . . . . . . . . . . . . . . . . . . . . . . . . . . .

 

4-14

 

Figure 4-8: Site Cabling for Four Picocells . . . . . . . . . . . . . . . . . . . . . . . . . . . .

 

4-15

 

Figure 4-9: AC Input Cable Connector Information . . . . . . . . . . . . . . . . . . . . .

 

4-17

 

Figure 4-10: DC Input Cable Connector Information . . . . . . . . . . . . . . . . . . . .

 

4-18

 

Figure 4-11: AC Installation Box . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

 

4-20

 

Figure 4-13: Antenna Cabling Details . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

 

4-21

 

Figure 4-14: Antenna Cabling for Three Microcells . . . . . . . . . . . . . . . . . . . . .

 

4-22

 

Figure 4-15: Antenna Cabling for Maximum of Four Microcells or Picocells .

4-23

 

Figure 4-16: Site I/O Cabling Details (MicroCell Unit Shown) . . . . . . . . . . . .

 

4-25

 

Figure 4-17: Site I/O Interface Cabling for

 

 

 

RGPS (Synchronous) Configurations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

 

4-33

 

 

 

vi

SCt300 BTS Hardware Installation, ATP and FRU Procedures

DEC 2000

PRELIMINARY

List of Figures ± continued

 

Figure 4-18: Site I/O Interface Cabling for

 

 

HSO (Non±Synchronous) Configurations . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

4-34

 

Figure 4-18: Site I/O Interface Cabling for Span Line Daisy Chain Cabling . .

4-37

 

Figure 5-1: Site Cabling for One Microcell with Primary Surge Suppressor . .

5-2

 

Figure 5-2: Site Cabling for Two Microcells with Primary Surge Suppressor .

5-3

 

Figure 5-3: Site Cabling for Three Microcells with Primary Surge Suppressor

5-4

 

Figure 5-4: Site Cabling for Four Microcells with Primary Surge Suppressor .

5-5

 

Figure 5-5: Site Cabling for One Picocell with Primary Surge Suppressor . . . .

5-6

 

Figure 5-6: Site Cabling for Two Picocells with Primary Surge Suppressor . . .

5-7

 

Figure 5-7: Site Cabling for Three Picocells with Primary Surge Suppressor . .

5-8

 

Figure 5-8: Site Cabling for Four Picocells with Primary Surge Suppressor . . .

5-9

 

Figure 5-9: Attaching the Surge Suppressor to the Mounting Bracket . . . . . . .

5-11

 

Figure 5-10: AC Input Cable Connector Information . . . . . . . . . . . . . . . . . . . .

5-13

 

Figure 5-11: DC Input Cable Connector Information . . . . . . . . . . . . . . . . . . . .

5-14

 

Figure 5-12: Primary Surge Suppressor AC Input Power Connection Locations

5-16

 

Figure 5-14: Antenna Cabling Details . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5-18

 

Figure 5-15: Antenna Cabling for one Microcell with

 

 

Primary Surge Suppressor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5-19

 

Figure 5-16: Antenna Cabling for Two Microcells with

 

 

Primary Surge Suppressor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5-20

 

Figure 5-17: Antenna Cabling for Three Microcells with

 

 

Primary Surge Suppressor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5-20

 

Figure 5-18: Antenna Cabling for Four Microcells with

 

 

Primary Surge Suppressor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5-21

 

Figure 5-19: Antenna Cabling for one Picocell with

 

 

Primary Surge Suppressor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5-21

 

Figure 5-20: Antenna Cabling for Two Picocells with

 

 

Primary Surge Suppressor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5-22

 

Figure 5-21: Antenna Cabling for Three Picocells with

 

 

Primary Surge Suppressor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5-22

 

Figure 5-22: Antenna Cabling for Four Picocells with

 

 

Primary Surge Suppressor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5-23

 

Figure 5-22: Site I/O Cabling Details with

 

 

Optional Primary Surge Suppressor (MicroCell Unit Shown) . . . . . . . . . . . . . .

5-25

 

Figure 5-23: Punchdown Block Location . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5-26

 

Figure 5-24: Punchdown Block . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5-26

 

Figure 5-26: Site I/O Interface Cabling for

 

 

RGPS (Synchronous) Configurations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5-34

 

Figure 5-27: Site I/O Interface Cabling for

 

 

HSO (Non±Synchronous) Configurations . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5-35

 

Figure 5-27: Site I/O Interface Cabling for

 

 

Span Line Daisy Chain Cabling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5-38

 

 

 

DEC 2000

SCt300 BTS Hardware Installation, ATP and FRU Procedures

vii

PRELIMINARY

List of Figures ± continued

 

Figure 6-1: Location of MicroCell Unit Connectors . . . . . . . . . . . . . . . . . .

. . .

6-2

 

Figure 6-2: Location of PicoCell Unit Connectors . . . . . . . . . . . . . . . . . . . .

. . .

6-3

 

Figure 6-3: Location of Primary Surge Suppressor Connectors . . . . . . . . . . .

. .

6-4

 

Figure 6-4: Attaching Back Fin Cover to Unit (Picocell Shown) . . . . . . . . .

. .

6-5

 

Figure 6-5: Attaching the Installation Handles to the Unit (Picocell Shown)

. .

6-7

 

Figure 6-6: Attaching the Unit to the Mounting Bracket . . . . . . . . . . . . . . . .

. .

6-10

 

Figure 6-7: Detail Location of Ground Stud . . . . . . . . . . . . . . . . . . . . . . . . .

. .

6-12

 

Figure 6-8: Grounding Stud on Mounting Bracket . . . . . . . . . . . . . . . . . . . .

. .

6-13

 

Figure 6-9: Attaching Front Fin Cover to Unit (Picocell Shown) . . . . . . . . .

. .

6-14

 

Figure 6-10: Attaching the Site I/O Junction Box to the Unit . . . . . . . . . . . .

. .

6-16

 

Figure 6-11: Attaching the Short Duration Battery to the Unit . . . . . . . . . . .

. .

6-18

 

Figure 6-12: Battery Cable Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. .

6-20

 

Figure 6-14: AC Power Cabling Details . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. .

6-22

 

Figure 6-14: DC Power Cabling Details . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. .

6-24

 

Figure 6-16: Antenna Cabling Details for MicroCell and PicoCell Unit . . . .

. .

6-26

 

Figure 6-17: Antenna Cabling for Two Microcells . . . . . . . . . . . . . . . . . . . .

. .

6-27

 

Figure 6-18: Antenna Cabling for Three Microcells . . . . . . . . . . . . . . . . . . .

. .

6-27

 

Figure 6-19: Antenna Cabling for Four Microcells . . . . . . . . . . . . . . . . . . . .

. .

6-28

 

Figure 6-20: Antenna Cabling for Two Picocells . . . . . . . . . . . . . . . . . . . . . .

. .

6-28

 

Figure 6-21: Antenna Cabling for Three Picocells . . . . . . . . . . . . . . . . . . . . .

. .

6-29

 

Figure 6-22: Antenna Cabling for Four Picocells . . . . . . . . . . . . . . . . . . . . .

. .

6-29

 

Figure 6-23: Installation of Third and Fourth Antenna Lightning Arrestors

. . .

6-31

 

Figure 6-24: Antenna Cabling Details for MicroCell and

 

 

 

PicoCell Unit Equipped with Primary Surge Suppressor . . . . . . . . . . . . . . . .

. .

6-32

 

Figure 6-25: Antenna Cabling for Two Microcells Equipped with

 

 

 

Primary Surge Suppressor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. .

6-33

 

Figure 6-26: Antenna Cabling for Three Microcells Equipped with

 

 

 

Primary Surge Suppressor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. .

6-34

 

Figure 6-27: Antenna Cabling for Four Microcells Equipped with

 

 

 

Primary Surge Suppressor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. .

6-35

 

Figure 6-28: Antenna Cabling for Two Picocells Equipped with

 

 

 

Primary Surge Suppressor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. .

6-36

 

Figure 6-29: Antenna Cabling for Three Picocells Equipped with

 

 

 

Primary Surge Suppressor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. .

6-36

 

Figure 6-30: Antenna Cabling for Four Picocells Equipped with

 

 

 

Primary Surge Suppressor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. .

6-37

 

Figure 6-31: MIB Cabling for Two Units . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. .

6-42

 

Figure 6-32: MIB Cabling for Three Units . . . . . . . . . . . . . . . . . . . . . . . . . .

. .

6-42

 

Figure 6-33: MIB Cabling for Four Units . . . . . . . . . . . . . . . . . . . . . . . . . . .

. .

6-43

 

 

 

viii

SCt300 BTS Hardware Installation, ATP and FRU Procedures

DEC 2000

PRELIMINARY

List of Figures ± continued

 

Figure 6-34: SU Cabling Details for Single MicroCell or Picocell . . . . . . . . . .

6-48

 

Figure 6-35: SU Cabling Details for Two Units . . . . . . . . . . . . . . . . . . . . . . . . .

6-49

 

Figure 6-36: SU Cabling Details for Three Units . . . . . . . . . . . . . . . . . . . . . . . .

6-49

 

Figure 6-37: SU Cabling Details for Four Units . . . . . . . . . . . . . . . . . . . . . . . .

6-50

 

Figure 6-38: Lock Positions on Primary Surge Suppressor . . . . . . . . . . . . . . . .

6-54

 

Figure 6-39: Location of AC Power Breakers on Primary Surge Suppressor . .

6-54

 

Figure 6-40: Front Solar Cover . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

6-55

 

Figure 7-1: Front Solar Cover (MicroCell Illustrated) . . . . . . . . . . . . . . . . . . . .

7-2

 

Figure 7-2: Location of AC and DC Power Breakers . . . . . . . . . . . . . . . . . . . . .

7-3

 

Figure 7-3: Location of AC Power Breakers Inside Primary Surge Suppressor

7-4

 

Figure 7-4: How To Remove The Diagnostic Access Cover (Microcell shown)

7-5

 

Figure 7-5: Detail Location of the Diagnostic Access Area for MicroCell . . . .

7-6

 

Figure 7-6: Detail Location of the Diagnostic Access Area for PicoCell . . . . .

7-6

 

Figure 7-7: BTS to LMF connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7-7

 

Figure 7-8: 15±Pin MMI/LMF Serial Connector . . . . . . . . . . . . . . . . . . . . . . . .

7-8

 

Figure 7-9: R3465 Communications Test Set Timing Signal Detail

 

 

(Advantest R3465) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7-11

 

Figure 7-10: Communications Test Set Timing Signal Detail

 

 

(CyberTest, HP 8935, HP 8921) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7-12

 

Figure 7-11: LMF to Test Equipment Connection . . . . . . . . . . . . . . . . . . . . . . .

7-13

 

Figure 7-12: RS232±IEEE488 Converter Serial Cable Configuration . . . . . . . .

7-14

 

Figure 7-13: Power Meter Detail . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7-35

 

Figure 7-14: Cable Calibration Test Setup . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7-41

 

Figure 7-15: North America PCS Frequency Spectrum (CDMA Allocation) . .

7-48

 

Figure 7-16: North American Cellular Telephone System Frequency Spectrum

 

 

(CDMA Allocation). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7-51

 

Figure 7-17: TX ATP Setup (CyberTest, HP 8935 and Advantest R3465 . . . . .

7-56

 

Figure 7-18: TX ATP Setup (HP 8921A) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7-57

 

Figure 7-19: RX ATP Setup (CyberTest, HP 8935 and Advantest) . . . . . . . . . .

7-58

 

Figure 7-20: RX ATP Setup (HP 8921A) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7-59

 

Figure 7-21: How To Replace The Diagnostic Access Cover (Microcell shown)

7-65

 

Figure 9-1: FRU Items . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-2

 

Figure 9-2: Front and Back Solar Covers for MicroCell . . . . . . . . . . . . . . . . . .

9-3

 

Figure 9-3: Front and Back Fin Covers for MicroCell and

 

 

PicoCell (PicoCell shown) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-3

 

Figure 9-4: Site I/O Junction Box Replacement . . . . . . . . . . . . . . . . . . . . . . . . .

9-15

 

Figure 9-5: Battery Replacement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-18

 

Figure 9-6: RGPS Head Replacement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-20

 

 

 

DEC 2000

SCt300 BTS Hardware Installation, ATP and FRU Procedures

ix

PRELIMINARY

List of Figures ± continued

Figure 9-7: Unit Replacement (MicroCell shown) . . . . . . . . . . . . . . . . . . . . . . .

9-24

x

SCt300 BTS Hardware Installation, ATP and FRU Procedures

DEC 2000

PRELIMINARY

List of Tables

SCt300 BTS Hardware Installation, ATP and FRU Procedures

Software Release 2.15.x.x

 

Table 1-1: Tools and Materials for Pole Mounting . . . . . . . . . . . . . . . . . . . . . . .

1-13

 

Table 1-2: Tools and Materials for Rack Mounting . . . . . . . . . . . . . . . . . . . . . .

1-13

 

Table 1-3: Mounting Bracket Tools and Materials for Concrete Wall Mounting

1-14

 

Table 1-4: Tools and Materials for Concrete Ceiling . . . . . . . . . . . . . . . . . . . . .

1-15

 

Table 1-5: Tools Required to Perform FRU Procedures . . . . . . . . . . . . . . . . . . .

1-21

 

Table 2-1: Procedure to Prepare the Site for the BTS . . . . . . . . . . . . . . . . . . . .

2-7

 

Table 2-2: Installation Dimensions for the MicroCell and PicoCell Units . . . .

2-8

 

Table 2-3 Minimum Clearances MicroCell and PicoCell Units . . . . . . . . . . . . .

2-9

 

Table 2-4 Minimum Clearances for Surge Suppressor . . . . . . . . . . . . . . . . . . . .

2-9

 

Table 3-1: Mounting Bracket Tools and Materials for Concrete Wall Mounting

3-5

 

Table 3-2: Procedure to Drill Holes in the Wall for

 

 

Mounting Bracket Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

3-6

 

Table 3-3: Procedure to Secure the Mounting Bracket to a Wall . . . . . . . . . . . .

3-7

 

Table 3-4: Tools and Materials for Concrete Ceiling . . . . . . . . . . . . . . . . . . . . .

3-10

 

Table 3-5: Procedure to Secure the Mounting Bracket to the Adapter . . . . . . . .

3-11

 

Table 3-6: Tools and Materials for Pole Mounting . . . . . . . . . . . . . . . . . . . . . . .

3-12

 

Table 3-7: Procedure for Attaching the Mounting Bracket to a Pole . . . . . . . . .

3-13

 

Table 3-8: Tools and Materials for Rack Mounting . . . . . . . . . . . . . . . . . . . . . .

3-16

 

Table 3-9: Procedure to Attach the Mounting Bracket to a Rack . . . . . . . . . . . .

3-16

 

Table 3-10: Procedure to attach Back Solar Cover to Mounting Bracket . . . . .

3-19

 

Table 3-11: Installing the RGPS Head . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

3-21

 

Table 4-1: Cable Descriptions and Part Numbers . . . . . . . . . . . . . . . . . . . . . . . .

4-2

 

Table 4-2: Microcell Expansion Kit for Units 1 to 2

 

 

Short MIB A (Cubicle) ± T448AL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

4-4

 

Table 4-3: Microcell Expansion Kit for Units 1 to 2

 

 

Long MIB A (Non±Cubicle) ± T448AM . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

4-4

 

Table 4-4: Picocell Expansion Kit for Units 1 to 2

 

 

Short MIB A (Cubicle) ± T448AN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

4-4

 

Table 4-5: Picocell Expansion Kit for Units 1 to 2

 

 

Long MIB A (Non±Cubicle) ± T448AP . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

4-4

 

Table 4-6: Microcell/Picocell Expansion Kit for Units 2 to 3

 

 

Current 2m MIB B ± T448AR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

4-5

 

 

 

DEC 2000

SCt300 BTS Hardware Installation, ATP and FRU Procedures

xi

PRELIMINARY

List of Tables ± continued

 

Table 4-7: Microcell/Picocell Expansion Kit for Units 2 to 3

 

 

 

Long 5m MIB B ± T448AS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

.

4-5

 

Table 4-8: Microcell/Picocell Expansion Kit for Units 3 to 4

 

 

 

Current 2m MIBs B and C ± T448AT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

 

4-5

 

Table 4-9: Microcell/Picocell Expansion Kit for Units 3 to 4

 

 

 

Longer 5M MIBs B and C ± T448AU . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

 

4-6

 

Table 4-10: Picocell Expansion Kit for Units 3 to 4

 

 

 

Current 2M MIBs B and C ± T448AV . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

 

4-6

 

Table 4-11: Picocell Expansion Kit for Units 3 to 4

 

 

 

Longer 5M MIBs B and C ± T448AW . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

 

4-6

 

Table 4-12: RGPS Synchronization Cable Kit ± SGKN4351A . . . . . . . . . . . .

 

4-7

 

Table 4-13: RGPS Synchronization Cable Kit ± SGKN4352A . . . . . . . . . . . .

 

4-7

 

Table 4-14: Cables Needed for Power, Earth Ground, and Battery Connections

4-17

 

Table 4-15: AC Input Cable Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

 

4-17

 

Table 4-16: DC Input Cable Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

 

4-18

 

Table 4-17: Procedure to Install Earth Ground Cable . . . . . . . . . . . . . . . . . . . . .

 

4-18

 

Table 4-18: Procedure to Install AC Input Cable(s) (Indoor Applications) . . . .

4-19

 

Table 4-19: Procedure to Install AC Installation Box

 

 

 

(Optional ± Required for Outdoor Installations) . . . . . . . . . . . . . . . . . . . . . . . .

 

4-19

 

Table 4-20: AC Installation Box Cabling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

 

4-19

 

Table 4-21: Procedure to Install DC Input Cable(s) . . . . . . . . . . . . . . . . . . . . . .

 

4-20

 

Table 4-24: Cables Needed for Antenna Connections . . . . . . . . . . . . . . . . . . . .

 

4-21

 

Table 4-25: Pin and Signal Information for Cable C (Antenna Cable) . . . . . . .

 

4-21

 

Table 4-26: Cables Needed for Antenna Connections . . . . . . . . . . . . . . . . . . . .

 

4-24

 

Table 4-27: Pin/Signal Information for Site I/O Cable . . . . . . . . . . . . . . . . . . . .

 

4-26

 

Table 4-28: Connecting the RGPS to the Site I/O Cable . . . . . . . . . . . . . . . . . .

 

4-29

 

Table 4-29: Cable Descriptions and Part Numbers . . . . . . . . . . . . . . . . . . . . . . .

 

4-31

 

Table 4-30: RGPS Synchronization Cable Kit ± SGKN4351A . . . . . . . . . . . .

 

4-31

 

Table 4-31: RGPS Synchronization Cable Kit ± SGKN4352A . . . . . . . . . . . .

 

4-31

 

Table 4-32: Multi±BTS Cable Run List . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

 

4-35

 

Table 4-31: Cable Descriptions and Part Numbers . . . . . . . . . . . . . . . . . . . . . . .

 

4-36

 

Table 4-32: Cable Run List for Span Line Daisy Chain Cabling . . . . . . . . . . . .

 

4-38

 

Table 5-1: Procedure to Attach the Surge Suppressor to the Mounting Bracket

 

5-10

 

Table 5-2: Cables Needed for Power, Earth Ground, and Battery Connections .

5-13

 

Table 5-3: AC Input Cable Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

 

5-13

 

Table 5-4: DC Input Cable Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

 

5-14

 

Table 5-5: Procedure to Install the Master Ground Cable on a

 

 

 

BTS Equipped with Optional Primary Surge Suppressor . . . . . . . . . . . . . . . . .

 

5-14

 

Table 5-6: Procedure to Install Earth Ground Cable on a

 

 

 

BTS Equipped with Optional Primary Surge Suppressor . . . . . . . . . . . . . . . . .

 

5-15

 

 

 

xii

SCt300 BTS Hardware Installation, ATP and FRU Procedures

DEC 2000

PRELIMINARY

List of Tables ± continued

 

Table 5-7: Procedure to Install AC Input Cable(s) on a

 

 

BTS Equipped with Optional Primary Surge Suppressor . . . . . . . . . . . . . . . . .

5-15

 

Table 5-8: Procedure to Install DC Input Cable(s) . . . . . . . . . . . . . . . . . . . . . . .

5-17

 

Table 5-11: Cables Needed for Antenna Connections . . . . . . . . . . . . . . . . . . . .

5-18

 

Table 5-12: Pin and Signal Information for Cables C and D (Antenna Cable) .

5-18

 

Table 5-13: Procedure to Install Antenna Cabling for Sites Equipped with

 

 

Primary Surge Suppressor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5-19

 

Table 5-12: Cables Needed for Antenna Connections . . . . . . . . . . . . . . . . . . . .

5-24

 

Table 5-13: Procedure to Install Site I/O Cable Between Site I/O Junction Box and

 

 

Optional Primary Surge Suppressor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5-25

 

Table 5-14: Pin/Signal Information for Site I/O Cable and Punchdown Block .

5-28

 

Table 5-15: Connecting the RGPS to the Site I/O Cable . . . . . . . . . . . . . . . . . .

5-30

 

Table 5-18: Cable Descriptions and Part Numbers . . . . . . . . . . . . . . . . . . . . . . .

5-32

 

Table 5-19: RGPS Synchronization Cable Kit ± SGKN4351A . . . . . . . . . . . .

5-32

 

Table 5-20: RGPS Synchronization Cable Kit ± SGKN4352A . . . . . . . . . . . .

5-32

 

Table 5-21: Multi±BTS RGPS Cable Run List for Primary Surge Suppressor .

5-36

 

Table 5-20: Cable Descriptions and Part Numbers . . . . . . . . . . . . . . . . . . . . . . .

5-37

 

Table 5-21: Cable Run List for Span Line Daisy Chain Cabling . . . . . . . . . . . .

5-39

 

Table 6-1: Procedure to Attach Rear Fin Cover to Units . . . . . . . . . . . . . . . . . .

6-5

 

Table 6-2: Installation Handle Kit ± SGLN5754 . . . . . . . . . . . . . . . . . . . . . . . .

6-6

 

Table 6-3: Procedure to Attach the Installation Handles to the Unit . . . . . . . . .

6-6

 

Table 6-4: Procedure to Attach the Unit to the Mounting Bracket . . . . . . . . . . .

6-9

 

Table 6-5: Ground Cable Description and Part Number . . . . . . . . . . . . . . . . . . .

6-11

 

Table 6-6: Procedure to Attach the Earth Ground Cables . . . . . . . . . . . . . . . . .

6-11

 

Table 6-7: Procedure to Attach Front Fin Cover to Unit . . . . . . . . . . . . . . . . . .

6-14

 

Table 6-8: Procedure to Attach the Site I/O Junction Box to the Unit . . . . . . . .

6-15

 

Table 6-9: Procedure to Attach a Site I/O Cap to the Unit (optional) . . . . . . . .

6-16

 

Table 6-10: Procedure to Attach the Short Duration Battery to the Unit . . . . . .

6-17

 

Table 6-11: Procedure to Connect the Short Duration Battery Cable to Unit . .

6-19

 

Table 6-13: AC Input Cable Description and Part Number . . . . . . . . . . . . . . . .

6-21

 

Table 6-14: Procedure to Connect AC Power to the Unit . . . . . . . . . . . . . . . . .

6-21

 

Table 6-14: DC Input Cable Description and Part Number . . . . . . . . . . . . . . . .

6-23

 

Table 6-15: Procedure to Connect DC Power to the Unit . . . . . . . . . . . . . . . . .

6-23

 

Table 6-17: Cable Descriptions and Part Numbers . . . . . . . . . . . . . . . . . . . . . . .

6-25

 

Table 6-18: Cable Descriptions and Part Numbers . . . . . . . . . . . . . . . . . . . . . . .

6-30

 

Table 6-19: Procedure to Install Antenna Lightning Arrestors . . . . . . . . . . . . . .

6-30

 

Table 6-20: MIB Terminators . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

6-38

 

Table 6-21: Microcell Expansion Kit for Units 1 to 2

 

 

Short MIB A (Cubicle) ± T448AL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

6-38

 

 

 

DEC 2000

SCt300 BTS Hardware Installation, ATP and FRU Procedures

xiii

PRELIMINARY

List of Tables ± continued

 

Table 6-22: Microcell Expansion Kit for Units 1 to 2

 

 

 

Long MIB A (Non±Cubicle) ± T448AM . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . .

6-39

 

Table 6-23: Picocell Expansion Kit for Units 1 to 2

 

 

 

Short MIB A (Cubicle) ± T448AN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . .

6-39

 

Table 6-24: Picocell Expansion Kit for Units 1 to 2

 

 

 

Long MIB A (Non±Cubicle) ± T448AP . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . .

6-39

 

Table 6-25: Microcell/Picocell Expansion Kit for Units 2 to 3

 

 

 

Current 2m MIB B ± T448AR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . .

6-39

 

Table 6-26: Microcell/Picocell Expansion Kit for Units 2 to 3

 

 

 

Long 5m MIB B ± T448AS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . .

6-40

 

Table 6-27: Microcell/Picocell Expansion Kit for Units 3 to 4

 

 

 

Current 2m MIBs B and C ± T448AT . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . .

6-40

 

Table 6-28: Microcell/Picocell Expansion Kit for Units 3 to 4

 

 

 

Longer 5M MIBs B and C ± T448AU . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . .

6-40

 

Table 6-29: Picocell Expansion Kit for Units 3 to 4

 

 

 

Current 2M MIBs B and C ± T448AV . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . .

6-41

 

Table 6-30: Picocell Expansion Kit for Units 3 to 4

 

 

 

Longer 5M MIBs B and C ± T448AW . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . .

6-41

 

Table 6-31: Cables Needed for SU Connections . . . . . . . . . . . . . . . . . . . .

. . . .

6-44

 

Table 6-32: Microcell Expansion Kit for Units 1 to 2

 

 

 

Short MIB A (Cubicle) ± T448AL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . .

6-44

 

Table 6-33: Microcell Expansion Kit for Units 1 to 2

 

 

 

Long MIB A (Non±Cubicle) ± T448AM . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . .

6-45

 

Table 6-34: Picocell Expansion Kit for Units 1 to 2

 

 

 

Short MIB A (Cubicle) ± T448AN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . .

6-45

 

Table 6-35: Picocell Expansion Kit for Units 1 to 2

 

 

 

Long MIB A (Non±Cubicle) ± T448AP . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . .

6-45

 

Table 6-36: Microcell/Picocell Expansion Kit for Units 2 to 3

 

 

 

Current 2m MIB B ± T448AR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . .

6-45

 

Table 6-37: Microcell/Picocell Expansion Kit for Units 2 to 3

 

 

 

Long 5m MIB B ± T448AS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . .

6-46

 

Table 6-38: Microcell/Picocell Expansion Kit for Units 3 to 4

 

 

 

Current 2m MIBs B and C ± T448AT . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . .

6-46

 

Table 6-39: Microcell/Picocell Expansion Kit for Units 3 to 4

 

 

 

Longer 5M MIBs B and C ± T448AU . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . .

6-46

 

Table 6-40: Picocell Expansion Kit for Units 3 to 4

 

 

 

Current 2M MIBs B and C ± T448AV . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . .

6-47

 

Table 6-41: Picocell Expansion Kit for Units 3 to 4

 

 

 

Longer 5M MIBs B and C ± T448AW . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . .

6-47

 

Table 6-42: Install the SU Cable on One MicroCell or PicoCell . . . . . . . .

. . . .

6-47

 

Table 6-43: Install SU Cabling for Multi±BTS Configurations . . . . . . . . .

. . . .

6-48

 

Table 6-44: Terminations of Unused Connectors . . . . . . . . . . . . . . . . . . . .

. . . .

6-51

 

Table 6-45: Terminations of Unused Connectors . . . . . . . . . . . . . . . . . . . .

. . . .

6-51

 

Table 6-46: Procedure to Power on the Unit and Mount the Solar Cover

. . . . .

6-52

 

 

 

xiv

SCt300 BTS Hardware Installation, ATP and FRU Procedures

DEC 2000

PRELIMINARY

List of Tables ± continued

 

Table 6-47: Procedure to Power on the Surge Suppressor, the Unit, and

 

 

Mount the Solar Cover . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

6-53

 

Table 6-47: Installation Completion Checklist . . . . . . . . . . . . . . . . . . . . . . . . . .

6-58

 

Table 7-1: Procedure for Removing Diagnostic Access Cover . . . . . . . . . . . . .

7-5

 

Table 7-2: 15±Pin MMI/LMF Serial Cable Information . . . . . . . . . . . . . . . . . .

7-8

 

Table 7-3: Interfacing test equipment to the BTS . . . . . . . . . . . . . . . . . . . . . . . .

7-9

 

Table 7-4: Connect the Communication Test Set and Power Meter to the LMF

7-13

 

Table 7-5: Create a HyperTerminal Connection . . . . . . . . . . . . . . . . . . . . . . . . .

7-15

 

Table 7-6: Establishing MMI Communication . . . . . . . . . . . . . . . . . . . . . . . . . .

7-17

 

Table 7-7: Updating Default Channel Setting to Customer Operating Channel

7-18

 

Table 7-8: Verify BTS Sync Mode . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7-20

 

Table 7-9: Verify DPLL Tracking . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7-20

 

Table 7-10: Verify Default Startup Coordinates . . . . . . . . . . . . . . . . . . . . . . . . .

7-22

 

Table 7-11: Create Site±Specific BTS Directory . . . . . . . . . . . . . . . . . . . . . . . .

7-24

 

Table 7-12: Start the LMF and Login to the BTS . . . . . . . . . . . . . . . . . . . . . . .

7-25

 

Table 7-13: Update BTS Specific CDF File Device Load Version . . . . . . . . . .

7-26

 

Table 7-14: Download/Enable MAWI . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7-27

 

Table 7-15: System Status LED States . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7-28

 

Table 7-16: Selecting Test Equipment Manually in a Serial Connection Tab . .

7-30

 

Table 7-17: Selecting Test Equipment Using Auto-Detect . . . . . . . . . . . . . . . . .

7-31

 

Table 7-18: Test Equipment Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7-32

 

Table 7-19: R3465 Calibration Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7-33

 

Table 7-20: Gigatronics Power Meter GPIB Address Procedure . . . . . . . . . . . .

7-35

 

Table 7-21: Test Equipment Setup . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7-36

 

Table 7-22: Test Equipment Selection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7-37

 

Table 7-23: Calibrate the Power Meter . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7-38

 

Table 7-24: Automated Cable Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7-40

 

Table 7-25: Create CAL File . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7-43

 

Table 7-26: RF Path Audit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7-45

 

Table 7-27: 1900 MHz TX and RX Frequency vs. Channel . . . . . . . . . . . . . . .

7-49

 

Table 7-28: 800 MHz TX and RX Frequency vs. Channel . . . . . . . . . . . . . . . .

7-51

 

Table 7-29: TX Acceptance Test Outline . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7-53

 

Table 7-30: TX Test Using Backup Synchronization . . . . . . . . . . . . . . . . . . . . .

7-53

 

Table 7-31: RX ATP Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7-55

 

Table 7-32: Generate an ATP Report . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7-60

 

Table 7-33: Copy Files from LMF to a Diskette . . . . . . . . . . . . . . . . . . . . . . . .

7-61

 

Table 7-34: Copying CAL Files from Diskette to the CBSC . . . . . . . . . . . . . . .

7-62

 

 

 

DEC 2000

SCt300 BTS Hardware Installation, ATP and FRU Procedures

xv

PRELIMINARY

List of Tables ± continued

Table 7-35: Remove External Test Equipment . . . . . . . . . . . . . . . . . . . . . . . . . .

7-63

Table 7-36: Reset BTS and Remote Site Initialization . . . . . . . . . . . . . . . . . . . .

7-63

Table 7-37: Bring BTS into Service . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7-64

Table 7-38: Remove LMF . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7-64

Table 8-1: Create CAL File . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-3

Table 8-2: RF Path Audit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-5

Table 8-3: TX Acceptance Test Outline . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-8

Table 8-4: TX Test Using Backup Synchronization . . . . . . . . . . . . . . . . . . . . . .

8-8

Table 8-5: Generate an ATP Report . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-11

Table 8-6: Copy Files from LMF to a Diskette . . . . . . . . . . . . . . . . . . . . . . . . .

8-12

Table 8-7: Copying CAL Files from Diskette to the CBSC . . . . . . . . . . . . . . . .

8-13

Table 9-1: Login and Access Alarm Window Procedure . . . . . . . . . . . . . . . . . .

9-4

Table 9-2: Shut Down Signaling Functions . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-5

Table 9-3: Restore Signaling Operations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-9

Table 9-4: Item Number Replacement List . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-13

Table 9-5: Remove the Failed Site I/O Junction Box . . . . . . . . . . . . . . . . . . . . .

9-14

Table 9-6: Install the Replacement Site I/O Junction Box . . . . . . . . . . . . . . . . .

9-14

Table 9-7: Item Number Replacement List . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-16

Table 9-8: Remove the Failed Short Duration Battery . . . . . . . . . . . . . . . . . . . .

9-17

Table 9-9: Install the Replacement Short Duration Battery . . . . . . . . . . . . . . . .

9-17

Table 9-10: Item Number Replacement List . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-19

Table 9-11: Remove the Failed RGPS Head . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-19

Table 9-12: Install the Replacement RGPS Head . . . . . . . . . . . . . . . . . . . . . . . .

9-20

Table 9-13: Item Number Replacement List . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-21

Table 9-14: Remove the Failed Unit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-21

Table 9-15: Install the New Unit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-23

xvi

SCt300 BTS Hardware Installation, ATP and FRU Procedures

DEC 2000

PRELIMINARY

Foreword

Scope of manual

This manual is intended for use by cellular telephone system craftspersons in the day-to-day operation of Motorola cellular system equipment and ancillary devices. It is assumed that the user of this information has a general understanding of telephony, as used in the operation of the Public Switched Telephone Network (PSTN), and is familiar with these concepts as they are applied in the cellular mobile/portable radiotelephone environment. The user, however, is not expected to have any detailed technical knowledge of the internal operation of the equipment.

This manual is not intended to replace the system and equipment training offered by Motorola, although it can be used to supplement or enhance the knowledge gained through such training.

Text conventions

The following special paragraphs are used in this manual to point out information that must be read. This information may be set-off from the surrounding text, but is always preceded by a bold title in capital letters. The four categories of these special paragraphs are:

NOTE

Presents additional, helpful, non-critical information that you can use.

IMPORTANT

*Presents information to help you avoid an undesirable situation or provides additional information to help you understand a topic or concept.

CAUTION

Presents information to identify a situation in which equipment damage could occur, thus avoiding damage to equipment.

WARNING

Presents information to warn you of a potentially hazardous situation in which there is a possibility of personal injury.

DEC 2000

SCt300 BTS Hardware Installation, ATP and FRU Procedures

xvii

PRELIMINARY

Foreword ± continued

The following typographical conventions are used for the presentation of software information:

SIn text, sans serif BOLDFACE CAPITAL characters (a type style without angular strokes: i.e., SERIF versus ) are used to name a command.

SIn text, typewriter style characters represent prompts and the system output as displayed on an operator terminal or printer.

SIn command definitions, sans serif boldface characters represent those parts of the command string that must be entered exactly as shown and typewriter style characters represent command output responses as displayed on an operator terminal or printer.

SIn the command format of the command definition, typewriter style characters represent the command parameters.

Changes to manual

Changes that occur after the printing date are incorporated into your manual by Cellular Manual Revisions (CMRs). The information in this manual is updated, as required, by a CMR when new options and procedures become available for general use or when engineering changes occur. The cover sheet(s) that accompany each CMR should be retained for future reference. Refer to the Revision History page for a list of all applicable CMRs contained in this manual.

Receiving updates

Technical Education & Documentation (TED) maintains a customer database that reflects the type and number of manuals ordered or shipped since the original delivery of your Motorola equipment. Also identified in this database is a ªkeyº individual (such as Documentation Coordinator or Facility Librarian) designated to receive manual updates from TED as they are released.

To ensure that your facility receives updates to your manuals, it is important that the information in our database is correct and up-to-date. Therefore, if you have corrections or wish to make changes to the information in our database (i.e., to assign a new ªkeyº individual), please contact Technical Education & Documentation at:

MOTOROLA, INC.

Technical Education & Documentation

1 Nelson C. White Parkway

Mundelein, Illinois 60060

U.S.A.

 

Phone:

 

 

 

Within U.S.A. and Canada . . . . .

800-872-8225

 

 

Outside of U.S.A. and Canada . .

+1-847-435±5700

 

 

FAX: . . . . . . . . . . . . . . . . . . . . . .

+1-847-435±5541

 

 

 

 

xviii

SCt300 BTS Hardware Installation, ATP and FRU Procedures

DEC 2000

PRELIMINARY

Foreword ± continued

Reporting manual errors

In the event that you locate an error or identify a deficiency in your manual, please take time to write to us at the address above. Be sure to include your name and address, the complete manual title and part number (located on the manual spine, cover, or title page), the page number (found at the bottom of each page) where the error is located, and any comments you may have regarding what you have found. We appreciate any comments from the users of our manuals.

24-hour support service

If you have any questions or concerns regarding the operation of your equipment, please contact the Customer Network Resolution Center for immediate assistance. The 24 hour telephone numbers are:

Arlington Heights, IL . . . . . . . . . . 800-433-5202

Arlington Heights, International . . +1±847-632-5390

Cork, Ireland . . . . . . . . . . . . . . . . . 44±1793±565444

Swindon, England . . . . . . . . . . . . . 44±1793±565444

DEC 2000

SCt300 BTS Hardware Installation, ATP and FRU Procedures

xix

PRELIMINARY

General Safety

Remember! . . . Safety depends on you!!

Ground the instrument

Do not operate in an explosive atmosphere

Keep away from live circuits

Do not service or adjust alone

The following general safety precautions must be observed during all phases of operation, service, and repair of the equipment described in this manual. Failure to comply with these precautions or with specific warnings elsewhere in this manual violates safety standards of design, manufacture, and intended use of the equipment. Motorola, Inc. assumes no liability for the customer's failure to comply with these requirements. The safety precautions listed below represent warnings of certain dangers of which we are aware. You, as the user of this product, should follow these warnings and all other safety precautions necessary for the safe operation of the equipment in your operating environment.

To minimize shock hazard, the equipment chassis and enclosure must be connected to an electrical ground. If the equipment is supplied with a three-conductor ac power cable, the power cable must be either plugged into an approved three-contact electrical outlet or used with a three-contact to two-contact adapter. The three-contact to two-contact adapter must have the grounding wire (green) firmly connected to an electrical ground (safety ground) at the power outlet. The power jack and mating plug of the power cable must meet International Electrotechnical Commission (IEC) safety standards.

Do not operate the equipment in the presence of flammable gases or fumes. Operation of any electrical equipment in such an environment constitutes a definite safety hazard.

Operating personnel must:

Snot remove equipment covers. Only Factory Authorized Service Personnel or other qualified maintenance personnel may remove equipment covers for internal subassembly, or component replacement, or any internal adjustment.

Snot replace components with power cable connected. Under certain conditions, dangerous voltages may exist even with the power cable removed.

Salways disconnect power and discharge circuits before touching them.

Do not attempt internal service or adjustment, unless another person, capable of rendering first aid and resuscitation, is present.

xx

SCt300 BTS Hardware Installation, ATP and FRU Procedures

DEC 2000

PRELIMINARY

General Safety ± continued

Do not substitute parts or modify equipment

Because of the danger of introducing additional hazards, do not install substitute parts or perform any unauthorized modification of equipment. Contact Motorola Warranty and Repair for service and repair to ensure that safety features are maintained.

Dangerous procedure warnings

Warnings, such as the example below, precede potentially dangerous procedures throughout this manual. Instructions contained in the warnings must be followed. You should also employ all other safety precautions that you deem necessary for the operation of the equipment in your operating environment.

WARNING

Dangerous voltages, capable of causing death, are present in this equipment. Use extreme caution when handling, testing, and adjusting.

DEC 2000

SCt300 BTS Hardware Installation, ATP and FRU Procedures

xxi

PRELIMINARY

Revision History

Manual Number

68P09224A55

Manual Title

 

 

SCt300 BTS Hardware Installation, ATP and FRU Procedures

 

 

Software Release 2.15.x.x

Version Information

 

 

 

The following table lists the manual version, date of version, and

 

 

remarks on the version.

 

 

 

Version

Date of Issue

Remarks

Level

 

 

 

 

 

 

 

 

1

SEP 2000

Draft version for Engineering review.

 

 

 

Cellular Manual Revision

 

Information

 

 

 

 

The following table lists Cellular Manual Revision (CMR) number, date

 

 

of CMR, and remarks on the CMR.

 

 

 

Revision

Date of Issue

Remarks

Level

 

 

 

 

 

 

 

 

CMR No.

N.A.

No CMRs apply to this manual

 

 

 

xxii

SCt300 BTS Hardware Installation, ATP and FRU Procedures

DEC 2000

PRELIMINARY

Patent Notification

Patent numbers

This product is manufactured and/or operated under one or more of the following patents and other patents pending:

4128740 4661790 4860281 5036515 5119508 5204876 5247544 5301353

4193036 4667172 4866710 5036531 5121414 5204977 5251233 5301365

4237534 4672657 4870686 5038399 5123014 5207491 5255292 5303240

4268722 4694484 4872204 5040127 5127040 5210771 5257398 5303289

4282493 4696027 4873683 5041699 5127100 5212815 5259021 5303407

4301531 4704734 4876740 5047762 5128959 5212826 5261119 5305468

4302845 4709344 4881082 5048116 5130663 5214675 5263047 5307022

4312074 4710724 4885553 5055800 5133010 5214774 5263052 5307512

4350958 4726050 4887050 5055802 5140286 5216692 5263055 5309443

4354248 4729531 4887265 5058136 5142551 5218630 5265122 5309503

4367443 4737978 4893327 5060227 5142696 5220936 5268933 5311143

4369516 4742514 4896361 5060265 5144644 5222078 5271042 5311176

4369520 4751725 4910470 5065408 5146609 5222123 5274844 5311571

4369522 4754450 4914696 5067139 5146610 5222141 5274845 5313489

4375622 4764737 4918732 5068625 5152007 5222251 5276685 5319712

4485486 4764849 4941203 5070310 5155448 5224121 5276707 5321705

4491972 4775998 4945570 5073909 5157693 5224122 5276906 5321737

4517561 4775999 4956854 5073971 5159283 5226058 5276907 5323391

4519096 4797947 4970475 5075651 5159593 5228029 5276911 5325394

4549311 4799253 4972355 5077532 5159608 5230007 5276913 5327575

4550426 4802236 4972432 5077741 5170392 5233633 5276915 5329547

4564821 4803726 4979207 5077757 5170485 5235612 5278871 5329635

4573017 4811377 4984219 5081641 5170492 5235614 5280630 5339337

4581602 4811380 4984290 5083304 5182749 5239294 5285447 D337328

4590473 4811404 4992753 5090051 5184349 5239675 5287544 D342249

4591851 4817157 4998289 5093632 5185739 5241545 5287556 D342250

4616314 4827507 5020076 5095500 5187809 5241548 5289505 D347004

4636791 4829543 5021801 5105435 5187811 5241650 5291475 D349689

4644351 4833701 5022054 5111454 5193102 5241688 5295136 RE31814

4646038 4837800 5023900 5111478 5195108 5243653 5297161

4649543 4843633 5028885 5113400 5200655 5245611 5299228

4654655 4847869 5030793 5117441 5203010 5245629 5301056

4654867 4852090 5031193 5119040 5204874 5245634 5301188

DEC 2000

SCt300 BTS Hardware Installation, ATP and FRU Procedures

xxiii

PRELIMINARY

Patent Notification ± continued

Notes

xxiv

SCt300 BTS Hardware Installation, ATP and FRU Procedures

DEC 2000

PRELIMINARY

1

Chapter 1: Introduction

Table of Contents

Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1-1

Scope of this document . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1-1

Manual order . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1-1

Site cleanliness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1-2

Site manager . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1-2

System diagrams . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1-2

Configurations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1-2

Required Documents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1-11

Required Documents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1-11

Installation Tools and Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1-12

Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1-12

Tools and Materials for Installing the Mounting Bracket on a Pole . . .

1-13

Tools and Materials for Installing the Mounting Bracket on a Rack . . .

1-13

Tools and Materials for Installing the Mounting Bracket on a

 

Concrete Wall . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1-14

Tools and Materials for Installing the Mounting Bracket on a

 

Concrete Ceiling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1-15

ATP Tools and Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1-16

Policy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1-16

Test equipment calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1-16

Test cable calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1-16

Equipment Warm±up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1-16

Test Equipment List . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1-17

Optional Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1-20

FRU Tools and Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1-21

Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1-21

List of FRUs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1-21

Tools and Materials Required to Perform FRU Procedures . . . . . . . . .

1-21

Unit Identification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1-22

Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1-22

Installation and ATP Order . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1-32

Installation Order . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1-32

ATP Order . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1-32

DEC 2000

SCt300 BTS Hardware Installation, ATP and FRU Procedures

PRELIMINARY

Nokia T6AQ2, T5AP1 Manual

Table of Contents ± continued

1

Notes

SCt300 BTS Hardware Installation, ATP and FRU Procedures

DEC 2000

PRELIMINARY

Introduction

1

Scope of this document

This document provides information pertaining to the hardware installation, cabling installation, ATP and Field Replaceable Unit (FRU) procedures of the Motorola MicroCell and PicoCell SCt300 CDMA Base Transceiver Subsystem (BTS) equipment.

The FRU procedures do not cover the replacement of modules inside the unit.

An individual SCt300 BTS unit will be referred to as the ªunitº for the remainder of this document. A BTS site that contains one or more SCt300 BTS units will be referred to as the ªBTSº for the remainder of this document.

For detailed installation information of non-Motorola equipment, refer to the vendor manuals provided with such equipment.

Manual order

The installation order is the order of the manual starting at Chapter 1 and continuing through Chapter 5. After hardware installation has been completed, run the ATP for the system by following the procedures defined in Chapter 6 of this manual.

Chapter 1

ªIntroductionº Ð This is a brief outline of the manual. Also provided is a list of additional documents and tools necessary to complete the procedures.

Chapter 2

ªSite Preparationº Ð This chapter contains the necessary information to verify the condition of the site.

Chapter 3

ªInstalling Mounting Bracket and Remote GPSº Ð This chapter contains the necessary information to install the MicroCell/Surge Suppressor or PicoCell mounting bracket on a wall, pole, rack or ceiling.

Chapter 4

ªPreparing Site Cabling for Sites Equipped with Customer±Supplied Site I/O Interfaceº Ð This chapter contains the procedures for installing the external cabling for sites equipped with the customer±supplied Site I/O interface.

Chapter 5

ªPreparing Site Cabling for Sites Equipped with optional Primary Surge Suppressorº Ð This chapter contains the procedures for installing the external cabling for sites equipped with the optional Primary Surge Suppressor.

Chapter 6

ªInstalling the Unit and Installation Check Off Listº Ð This chapter contains procedures for installing the unit, mounting the Solar Cover to the chassis and final Installation Check Off List.

DEC 2000

SCt300 BTS Hardware Installation, ATP and FRU Procedures

1-1

PRELIMINARY

Introduction ± continued

1

Chapter 7

ªAcceptance Test Procedures (Optional)º ± This chapter outlines the ATP used for a field audit after a BTS initial installation, if necessary.

Chapter 8

ªAcceptance Test Procedures for Frequency Hopping Pilot Beacon (Optional)º ± This chapter outlines the ATP used for a field audit of units configured as a Frequency Hopping Pilot Beacon.

Chapter 9

ªField Replaceable Unit (FRU) Proceduresº ± This chapter provides the FRU procedures for the BTS system.

Appendix A

ªOutdoor Grounding Guidelines Overviewº Ð This chapter overviews the grounding information for external units. Use this chapter for general reference purposes only. It is not meant to replace local code specifications or site specific directions.

Site cleanliness

While performing the procedures provided in this document, be sure that:

Sfor an internal installation, the site is kept clean and free of tracked-in dirt

Sall packing material has been removed from the equipment.

Sall tools not currently in use are picked-up as the installation progresses.

Sall trash is removed from the site at the end of each day and after the installation is complete.

Sequipment is covered with a tarpaulin whenever possible.

Suse a shop-vac whenever you perform an internal installation procedure that generates dust, such as drilling or cutting.

Site manager

The site manager is the person in charge of and responsible for the full site. The installer will be verifying a variety of conditions with the site manager.

System diagrams

Figure 1±1 through Figure 1-7 show the MicroCell, PicoCell and optional Primary Surge Suppressor units mounted on a wall, rack, pole, frame and ceiling (PicoCell only).

PicoCell units are the only units that can be mounted on the ceiling. The MicroCell and Primary Surge Suppressor units can not be mounted on the ceiling.

1-2

SCt300 BTS Hardware Installation, ATP and FRU Procedures

DEC 2000

PRELIMINARY

Loading...
+ 158 hidden pages