AP configuration (WNDAP330)
LAN IP
192.168.1.235
Untagged VLAN: 1 – Management VLAN: 1
SSID Corporate – VLAN 1(ID 1)
SSID Guest – VLAN 20 (ID 20)
SSID Engineering – VLAN30 (ID 30)
Corporate
Guest
Engineering
UTM Port 1 to AP LAN
UTM 10 Configuration
LAN IP
192.168.1.1
VLAN1 (Corporate - default)
IP 192.168.1.1
Membership: Port 1, 2, 3, 4
DHCP enabled 192.168.1.x/24
VLAN20 (Guest1)
IP 192.168.20.1
Membership: Port 1
DHCP enabled 192.168.20.x/24
VLAN30 (Engineering)
IP 192.168.30.1
Membership: Port 1
DHCP enabled 192.168.30.x/24
UTM Port 2 to Switch 0/1
Internet
Wired LAN 192.168.1.x/24
Layer 2/ Layer 3 switch configuration
LAN IP
192.168.1.239
Management VLAN: 1
Membership : all ports Untagged in
VLAN1
UTM (Unified Threat Management) in a multi-SSID multi-VLAN network with
traffic separation
This document describes the steps to undertake in configuring a UTM 10 (Firmware version
1.0.16-0) and a WNDAP330 (Firmware version 3.0.3) to host a multi-SSID and multi-VLAN
network.
The solution will allow separating the Wireless traffic and Wired traffic of each of the VLANs
configured, from any other VLAN which will exist on the Wired or Wireless LAN – maintaining
same VLAN communication.
The diagram below shows a typical scenario.
Version 2.0
Table of Contents
Network Setup .................................................................................................................. 3
Physical setup ............................................................................................................... 3
Logical setup ................................................................................................................. 3
UTM10 Configuration ...................................................................................................... 4
Create a new VLAN ..................................................................................................... 4
AP configuration (WNDAP330) ...................................................................................... 5
Create a new SSID ...................................................................................................... 5
Further Notes .................................................................................................................... 6
Testing ........................................................................................................................... 6
Managing devices ........................................................................................................ 6
Version 2.0