Installation plan
Flatwork ironers
PM 1825
PM 1830
PM 1835
It is essential to read the operating and installation instructions before |
en - GB |
installation and commissioning. |
|
This is both in your own interests and those of your machine. |
09 192 660 / 03 |
Legend: |
|
|
|
|
Connection required |
|
Connection optional or required, |
|
|
depending on machine version |
|
|
|
|
|
AG |
Waste gas connection |
F |
Leg levellers, adjustable |
AL |
Waste air connection |
G |
Gas connection |
D |
Steam connection |
K |
Condensate connection |
DL |
Compressed air connection |
KW |
Cold water connection |
EL |
Electrical connection |
PA |
Equi-potential bonding |
EN |
Vent line |
|
|
|
|
All rights reserved! 08/14/13 |
|
2 |
|
|
09 192 660 / 03 |
PM 1825/1830/1835 |
en - GB |
Machine dimensions
09 192 660 / 03 |
3 |