Miele PM 1210, PM 1214, PM 1217 Installation diagram

Installation Plan Commercial Rotary Iron PM 1210 PM 1214 PM 1217
To prevent accidents and machine damage, read these instructions before installation or use.
en-US
M.-Nr. 09 981 761
2
Notes for installer................................................................................................................4
Installation ............................................................................................................................. 4
Setting up the rotary iron....................................................................................................... 5
Mounting the toe-kick (optional)............................................................................................ 5
Install the laundry box on the laundry outfeed table. ............................................................ 5
Electrical connection ............................................................................................................. 5
Duct for venting steam .......................................................................................................... 6
Substitute duct lengths .................................................................................................... 6
Maximum permissible total duct length ........................................................................... 8
Installation Plan ...................................................................................................................9
Flatwork Ironer PM 1210/1214/1217..................................................................................... 9
Technical details................................................................................................................10
3

Notes for installer

The rotary iron should be installed by a Miele trained installer.
Storage of the machine
Operating condi­tions
Temperature and relative humidity
The following conditions must be observed for transport and storage:
Temperature: minimum of 77°F (25°C) to maximum of 131°F (55°C)
Humidity: minimum of 5% to maximum of 75%, non-condensing
Maximum storage period: 2years
In general, the operating conditions of DIN60204 and EN60204-1 apply.
Temperature: 40°F (5°C) to maximum of 104°F (40°C)
Relative humidity: 10% to 85%
At 70°F (21°C) ambient temperature, the maximum permissible rela­tive humidity is 70%.
Do not operate the machine in a room where cleaning machines operate with solvents containing PERC or CFC.
Motor sparking may convert solvent vapors into hydrochloric acid which can lead to consequential damage.

Installation

The machine is transported to the installation site while still in the packaging. Do not remove the packaging until right before installa­tion.
The machine may be transported or lifted from the wooden frame only with the lateral mounting flaps mounted.
First lift the machine at the installation site by the wooden frame. The suspension points for lifting hooks/straps are located under the side columns between the screw-on feet.
During installation, remember that the clearance next to and behind the machine columns must amount to at least 23⅝" (600mm) so that the side plates remain accessible.
The machine should be set up so that the light shines parallel to the infeed table as much as possible.
The clearance in front of the machine must amount to at least 60“ (1.5m) to prevent a heating of foreign materials (furniture, walls). There should be a clearance of at least 39” (1m) above the machine.
A base and anchoring means are not necessary.
During the transport of the machine, pay attention to its stability. The iron may not be transported without the wooden frame (e.g., in case of a move). For a new transport, lift the iron onto the wooden frame and fasten it there.
4
Notes for installer

Setting up the rotary iron

Dismantle the mounting flaps on the left and right sides.
Check the roller and front and outside of the side columns using a
level.
Align the machine using the screw-on feet in such a way that the
side columns and roller are level with each other. In the process, the feet may be unscrewed a maximum of 2 ⅜" (60mm).
Counter the screw-on feet according to the alignment using the
nuts (under the side columns).

Mounting the toe-kick (optional)

Mounting the optionally available toe-kick can raise the machine by 4" (100mm).
Dismantle the mounting flaps on the left and right sides.
Unscrew the screw-on feet by the maximum amount ( >
2⅜" ( 60mm)).
Hold the side columns with a suitable aid and remove the screw-on
feet.
Mount the screw-on feet into the toe-kick and push the toe-kick un-
der the column.
Screw the toe-kick to the base plate of the machine.

Install the laundry box on the laundry outfeed table.

During installation, bring the laundry shelf into a horizontal position.
Loosen the fastening screws of the laundry shelf.
Rotate the laundry box by 180° and mount with the fastening
screws on the laundry outfeed table.
Coin-operated rotary irons must be anchored to the floor by the
supporting feet to prevent the risk of the machine tipping.

Electrical connection

All electrical work must be performed by a qualified service techni­cian in accordance with all applicable codes and standards.
– The electrical connection and wiring diagram are located behind the
mounting flap of the right side column.
– The values for the electrical connection and fuse rating can be
found on the data plate (see the “Technical data” chapter in this document).
– If the appliance is hard wired, a multiple-pole separator must be in-
stalled. Separators with a contact gap of more than ⅛" (3mm) are valid as separators. All components have to bear CSA or UL ap­proval.
5