KOHLER K-116, K-281, K-394, K-432, K-454 User Manual

...
Installation Guide
Widespread Lavatory Faucets
K-116, K-281, K-394,
K-432, K-454, K-6813, K-7304, K-7435, K-7439, K-8211, K-8212, K-8213,
K-8215, K-10269, K-10272,
K-10273, K-10577, K-10580,
K-P15261, K-15265, K-15816
M product numbers are for Mexico (i.e. K-12345M) Los números de productos seguidos de M corresponden a México (Ej. K-12345M) Français, page “Français-1” Español, página “Español-1”
1002628-2-M
Thank You For Choosing Kohler Company
We appreciate your commitment to Kohler quality. Please take a few minutes to review this manual before you start installation. If you encounter any installation or performance problems, please don’t hesitate to contact us. Our phone numbers and website are listed on the back cover. Thanks again for choosing Kohler Company.
Tools and Materials
Assorted Screwdrivers
Plumbers Putty
Adjustable Wrench
Heavy Duty Pipe Sealant with Teflon
Sealant Tape
Before You Begin
Observe all local plumbing and building codes. Shut off the main water supply. Carefully inspect the waste and supply tubing for any sign of
damage. Replace waste or supply tubing if necessary. For new installations, install the faucet before installing the
lavatory. Kohler Co. reserves the right to make revisions in the design of
faucets without notice, as specified in the Price Book.
1002628-2-M 2 Kohler Co.
Apply plumbers putty.
Putty Ring (if included)
Nut
Metal Washer
1. Spout Installation
Apply a bead of plumbers putty or other sealant to the underside of the spout or putty ring (if supplied) according to the putty manufacturer’s instructions.
Locate the center hole and insert the spout.
NOTE: For a thin-walled lavatory (such as stainless steel), slide the washer and nut onto the spout shank. Securely tighten the nut with a wrench. Do not overtighten.
Slide the metal washer and nut onto the spout shank. Position the metal washer so the second hole lines up with the
drain lift rod hole on the back of the spout. Securely tighten the nut with a wrench. Do not overtighten. Remove any excess putty or sealant.
Kohler Co. 3 1002628-2-M
Handle
Washer
Escutcheon
Apply plumbers putty.
Valve Body
Nut
Copper Tube
2. Handle Valve Installation
NOTE: The valve body marked Cold(with blue lettered tape attached to the tube) should be installed to the right of the faucet.
Apply a bead of plumbers putty or other sealant to the underside of the escutcheons according to the manufacturer’s instructions.
Insert the valve bodies into the proper mounting holes. Install a washer and a nut onto the underside of each valve body. Rotate each valve body until the copper tubing faces toward the
outside of the lavatory. While holding the valve bodies in place, securely tighten the
locknuts with a wrench. Do not overtighten. Remove any excess putty or sealant.
1002628-2-M 4 Kohler Co.
End Body
End Body Outlet
O-Ring
Rubber Washer
Gasket
Hose
Flexible Hose
3. Supply Tee and Hose Installation
Insert the plastic gasket and the rubber washer into the supply tee.
Thread the supply tee onto the spout shank until hand-tight. Ensure that the arms of the supply tee are aligned to face the left and right sides of the lavatory.
Thread a flexible hose onto each handle valve outlet. Securely tighten the hose with a wrench. Do not overtighten.
Connect the flexible hoses to the supply tee. Do not use thread sealant. To avoid kinking the hoses, loop them.
Securely tighten the hose with a wrench. Do not overtighten.
Supply Tee
Kohler Co. 5 1002628-2-M
Style A Drain
Style B Drain
4. Drain Style
Refer to the illustrations above to determine the drain style you received with your faucet.
Please follow the instructions for your drain style.
1002628-2-M 6 Kohler Co.
Flange
Apply plumbers putty.
Apply 3 layers of sealant tape to bottom 2/3.
Gasket
Washer
Body Washer
Drain Body
Lavatory
Screw
Spring Clip
Link
Rod
Seal
Stopper
Nut
Nut
Seal
5. Drain Installation-Style A
Remove the protective material from the flange. Wrap the bottom 2/3 of the flange threads with three layers of
sealant tape. Apply a ring of plumbers putty or other sealant to the underside
of the flange according to the putty manufacturer’s instructions. Insert the flange into the fixture drain hole. Assemble the gasket (tapered side up) and washer to the flange
and partially thread the nut to the flange. Do not fully tighten the nut at this time.
Install the body washer and drain body with the seal hole facing the back of the fixture and securely tighten the nut. Use care to avoid scratching the finish.
Remove any excess putty or sealant. Insert the stopper into the flange. Insert the seal into the seal hole on the body.
Kohler Co. 7 1002628-2-M
Stopper
Body Nut
Rod
Seal
Seal Hole
Stopper Nut
Body
Faucet
Rod
Thumb Screw
Link
Apply 3 layers of sealant tape and a
Tailpiece
Clip
small bead of pipe sealant to threads.
6. Complete Drain Installation-Style A
For regular installations, insert the short end of the rod into the body seal hole and under the stopper. For vandal-resistant installations, fit the rod through the hole in the stopper. Secure with the body nut.
Remove and adjust the stopper so it lifts about 3/8(1 cm) when opened. To adjust, loosen the stopper nut and shorten or lengthen the stopper as needed. Tighten the stopper nut.
Apply three layers of thread tape and a small bead of pipe sealant to the tailpiece threads.
Thread the tailpiece to the body and tighten securely. Slide one end of the clip onto the rod. Slide the link onto the rod
with the thumbscrew facing the back of the fixture. Squeeze the other end of the clip, aligning the hole with the rod. Move the link to the proper position by squeezing the clip and
sliding it along the rod. Insert the lift rod into the hole in the faucet and then into the
hole in the link. Tighten the thumbscrew onto the link so the lift rod knob extends
above the lift rod hole.
1002628-2-M 8 Kohler Co.
Fixture
Flange
Apply plumbers putty.
Gasket Washer
Nut Drain Body
7. Drain Installation-Style B
Remove the protective cover from the flange. Apply a ring of plumbers putty or other sealant to the underside
of the flange according to the putty manufacturer’s instructions. Assemble the nut, flat washer, and tapered gasket (tapered side
up) fully onto the body. From the underside of the fixture, insert the drain body up into
the drain hole. From the top of the fixture, securely hand tighten the flange onto
the drain body. Make sure the drain body seal hole is facing the back of the
fixture, and securely tighten the nut. Remove any excess putty or sealant.
Kohler Co. 9 1002628-2-M
Stopper
Stopper Rod
Flange
Thumb Screw
Link
Body
Nut
Seal
Apply thread sealant.
Tailpiece
Rod
Nut
Clip
8. Complete Drain Installation-Style B
Press the seal into the seal hole on the body. Insert the stopper into the flange. For regular installations, insert the short end of the rod into the
body seal hole and under the stopper. For vandal-resistant installations, fit the rod through the hole in the stopper. Hand tighten the body nut.
Remove and adjust the stopper as needed so it lifts about 3/8(1 cm) when opened. To adjust, rotate the threaded stopper rod in or out as needed. Retighten the stopper nut.
Apply thread sealant tape to the tailpiece threads, and thread the tailpiece to the body. Tighten the tailpiece securely.
Slide one end of the clip onto the rod. Slide the link onto the rod with the thumbscrew facing the back of the fixture.
Squeeze the other end of the clip, aligning the hole with the rod. Move the link to the proper position by squeezing the clip and sliding it along the rod.
Insert the lift rod into the hole in the faucet and then into the hole in the link.
Tighten the thumbscrew onto the link so the lift rod knob extends 1/2(1.3 cm) above the lift rod hole.
1002628-2-M 10 Kohler Co.
Supply Tube
Supply Tube
9. Supply Connections
Install the lavatory using the lavatory manufacturer’s instructions. Connect the supply tubes to the handle valves, and the supply
stops. Left is hot and right is cold. Tighten all connections.
Kohler Co. 11 1002628-2-M
Spout
Aerator
10. Installation Checkout
Connect the tailpiece and P-trap (as needed). Ensure that all connections are tight. Remove the aerator by turning it counterclockwise. Open the drain. Turn on the main water supply and check for leaks. Repair as
needed. Open both hot and cold valves and run water through the spout
for about a minute to remove debris. Check for leaks. Turn valves off.
Remove any debris from the aerator and reinstall.
1002628-2-M 12 Kohler Co.
Loading...
+ 28 hidden pages