
™
TYPICAL GRID CEILING INSTALLATION
Coral LED
Range
Installation instructions for Coral LED™ commercial downlights
Warnings and cautions
• To avoid electric shock, serious injury or property damage, isolate power before installing, removing or
servicing the product
• It is recommended that this product is installed by an electrician or a competent person with sufcient
experience to install this product
• To be installed in accordance with the local current wiring regulations and standards
a
• This luminaire is suitable for indoor use only
• It may be necessary to upgrade your MCBs to allow for increased inrush current
• This product cannot be covered with insulation material - do not cover
• DO NOT carry out insulation tests with the driver connected to the circuit
INSTALLATION
• Read instructions and check that you have all of the tools and accessories required to complete the installation correctly. Isolate power supply before starting the installation.
Standard non-dimmable/dimmable version installation procedure
1. Select a suitable location to install this luminaire, taking care to ensure that there is sufcient ceiling void
without infringing on joists, water pipes or electrical cables. Prior to cutting into an existing ceiling tile JCC
recommends cutting a sample hole in some scrap material to familiarise yourself with this stage of the
installation. When you are completely condent a Ø212mm hole must be cut into the ceiling tile.
2. Insert luminaire into cut-out (g. 1) then secure into position using the ceiling clips supplied with the tting
(g. 2 and 3). Secure the detachable rim with safety chain prior to attaching it to tting (g. 1a).
3. Move ceiling tile back into aperture in ceiling; once positioned halfway connect the luminaire to the mains
supply as indicated on the right (g. 5). If a dimmable variant, connect the dimming control wires
(DALI/1-10V/DSI) (g. 6).
4. Fully locate tile back into the ceiling (g. 4).
5. Reconnect mains power supply and test for operation.
Emergency non-dimmable/dimmable version installation procedure
1. Refer to steps 1 and 2 above of standard non-dimmable/dimmable version installation
2. Move ceiling tile back into aperture in ceiling; once positioned halfway connect the mains power to the
emergency remote pack as indicated in gure 5a. If a dimmable variant, connect the dimming control
wires(DALI/1-10V/DSI) as shown in gure 6.
3. Connect batteries inside the remote pack prior to completing the installation
4. Fully locate tile back into the ceiling.
5. Ensure the green LED charge indicator is located alongside the Coral LED™ and is visible once the tting is
installed and operational.
6. Reconnect mains power supply and test for operation. (Allow 24hrs for batteries to charge before testing)
Note: The external exible cable cord of this luminaire cannot be replaced: if the cord is damaged the luminaire
should be decommissioned and destroyed.
Specications
Coral LED™ Lumens LpcW
16W 1600 100
24W 2200 92
32W 2800 88
Colour temp: 4000K Ra: 90
Dimming control input
Figure 6.
1-10V control wires
1-10V+
1-10V-
DALI control wires
DA +
DA -
DSI control wires
DSI +
DSI -
Standard* & dimmable** mains connection
*100-240V 50/60Hz/Class II
**220-240V 50/60Hz/Class I (
**220-240V 50/60Hz/Class II (non emergency versions)
Figure 5.
Live = Brown
Emergency mains connection
220-240V 50/60Hz/Class I
Figure 5a.
Blue
Emergency versions)
Live = Brown
E =
Earth provision only
Neutral = Blue
Neutral: Blue
Switched Live: Brown
ENGLISH
V6_Jun_2022_RS
Fig.1a
Fig.2
Fig .3
Fig.4
For full range of
Detachable Rims
see catalogue for
details.
minimum
200mm
DO NOT COVER WITH INSULATION
DO NOT EXCEED MAX AMBIENT TEMP 50°C
RoHS
Compliant
IP20
jcc.co.uk

Emergency range routine inspection and test
Important warranty information
This product is supported by a 2-year standard warranty which will extend to 5-years if registered within the first year of pu
Please register at jcc.co.uk/warranty (Terms and conditions apply).
The installer will be asked to provide the following information, which is detailed on a label attached to the luminaire’s chas
Product Code/Date Code.
Technical Support: +44(0)1243 838986 Customer Services: +44(0)1243 838999
BS EN ISO9001 - 2015 - Registered Firm Certificate No. GB 1552
All tests must be undertaken at times of least risk and in accordance with EN 50172:2004 as indicated below:
Prole & Dimensions
Daily: Indicators of central power supply shall be visually inspected for correct operation.
Monthly: (in addition to the daily check) If automatic testing devices are used, the results of the short duration
tests shall be recorded. Test shall be carried out as follows:
a) Switch the luminaire over to emergency mode to operate from the batteries by simulating a failure of supply
to the normal lighting for a period sufcient to ensure correct luminaire operation
NOTE: The period of simulation failure should be sufcient for the purpose of this clause whilst minimising
damage to the system components e.g lamps. During this period, all luminaires and signs shall be
checked to ensure that they are present, clean and functioning correctly. At the end of this test period,
the supply to the normal lighting should be restored and any indicator lamp or device should be
checked to ensure that is showing that the normal supply has been restored
Standard non-dimmable tting Emergency/dimmable tting
384
287.5
98
Annually: If automatic testing devices are used, the results of the short duration tests shall be recorded. For all
a) Each luminaire and internally illuminated sign shall be tested monthly as above but for its full
b) The normal supply for the luminaire should be restored and any charge indicator lamp or device
c) The date of the test and its results shall be recorded in the system logbook.
A copy of this report must accompany any tting returned to the manufacturer for any reason.
General Information
Our products are designed to comply with the requirements of UK law and the relevant industry national and international standards and should not be modied in any way. All emergency lighting systems should comply
with the recommendations of BS5266-1: Code of Practice for the Emergency Lighting of Premises and be installed by competent engineers in accordance with the relevant wiring regulations. Before installing any type of
Emergency Lighting always seek the advice and approval of the local Fire Prevention Ofcer (or equivalent authority).
other systems the monthly inspection shall be carried out and the following additional
tests made:
duration in accordance with the manufacturer’s information.
should be checked to ensure that it shows the normal supply has been restored. The charging
arrangements should be checked for proper functioning.
Ø222
All dimensions in millimetres (Emergency remote pack not shown)
Ø222
Maintenance
Failed or faulty light sources connected to this equipment should be replaced immediately. These units are designed especially for a long and trouble free life. Under normal conditions, will require no routine maintenance or
service beyond the inspection and test regime of BS5266-1.
Both mains supply and battery protection fusing is incorporated internally. Should access to these or any other part of the circuitry be required this must be undertaken only by a suitably qualied person. Special care must
be taken when removing the cover to circuitry and battery. Only replacement components authorised by the company must be used. Disposal of replaced components should be in accordance with the component
manufacturers instructions.
You can help protect the environment. Please remember to respect the local regulations: hand in the non-working electrical equipment to an appropriate waste disposal centre.
The packaging material is recyclable. Dispose of the packaging in an environmentally friendly manner and make it available for the recyclable material collection service.
JCC Lighting Products Ltd. Lux Park, Chichester Business Park, City Fields Way, Tangmere, Chichester, West Sussex, PO20 2FT
rchase.
sis: