Racking Handle
A Collapsible Racking Handle is provided to Rack
in/out the draw out breakers whenever needed.
Figure 1 Racking handle
Catalog No Description
GRHN Racking handle
A storage provision is given in the draw out
cassette base plate. The racking handle can be
stored in the storage as shown in fig 2 when it is
straight
Figure 2 Racking Handle Storage tube
Storage Tube
DEH-41392 Installation Instructions
EntelliGuard ® G Circuit Breaker
Accessories
Racking Handle
Application instructions:
The racking handle has two Configurations
Figure 3 Racking handle in Storage configuration
WARNING: Before installing any accessories, turn the
breaker OFF, disconnect it from all voltage sources,
and discharge the closing spings.
AVERTISSEMENT: Avant d’installer tout accessoire,
mettre le disjoncteur en position OFF, le déconnecter
de toute tension d’alimentation , et décharger les
resorts d’armement
1. Storage Configuration: This is the
configuration as the racking handles are
received. They will be Straight and shorter
in length (Collapsed) as show in Fig 3
1
2. Usage Configuration: The racking handle
can be expanded and folded to Z-shape
for usage as shown in figure
Figure 4. Racking handle in usage configuration
To Rack in/out follow the below procedure
1. Pull out the racking handle from the
storage tube
2. Expand and fold the racking handle to Z-
shape as shown in fig –4
3. Rotate the Quarter turn screw using a flat
screw driver Clockwise
4. Insert the Raking handle into the racking
screw access hole in the panel as shown
5. Rotate the racking handle clock wise to
rack in the breaker and anti-clock wise to
rack out the breaker
These instructions do not purport to cover all details or variations in equipment nor, to provide contingency to be met in connection
with installation, operation, or maintenance. Should further information be desired, or should particular problems arise which are not
covered sufficiently for the purchaser’s purposes, the matter should be referred to GE.
GE
41 Woodford Ave, Plainville, CT 06062
www.geelectrical.com
© 2009 General Electric Company
6. Once racking operation is over pull out the
handle from racking access hole and store
it is in storage tube
Racking screw
access hole
Quarter Turn
Screw