Flowserve 030000 User Manual

Installation, Operation, Maintenance Instructions
Low Flow Valves
030 000 Globe Valves
Flow Control Division
Kammer Control Valves
Index
1 Using Kämmer valves and actuators correctly. 2 Unpacking 3 Installation 4 Quick check 5 Maintenance 6 Remove and install actuator 7 Disassemble and assemble valve 8Trouble-shooting chart
1 USING KÄMMER VALVES AND ACTUATORS
1.1 General
The following instructions are designed to assist in unpacking, installing and performing maintenance as required on Kämmer products. Product users and maintenance personnel should thoroughly review this bulletin prior to installing, operating or performing any maintenance.
DANGER:
are designed for specific applications (e.g. with regard to medium, pressure, temperature). For this reason they should not be used in other applications without first contacting the manufacturer.
1.2 Terms concerning safety
The safety terms DANGER, WARNING, CAUTION and NOTE are used in these instructions to highlight
particular dangers and/or to provide additional information on aspects that may not be readily apparent.
DANGER:
and/or substantial property damage will occur if proper precautions are not taken.
STOP!
WARNING:
and/or substantial property damage can occur if proper precautions are not taken.
CAUTION: i
or property damage can occur if proper precautions are not taken.
In most cases Kämmer valves and actuators
indicates that death, severe personal injury
indicates that death, severe personal injury
ndicates that minor personal injury and/
NOTE:
information, which may not be very obvious even to qualified personnel. Compliance with other, not particularly emphasised notes, with regard to transport, assembly, operation and maintenance and with regard to technical documentation (e.g. in the operating instruction, product documentation or on the product itself) is essential, in order to avoid faults, which in themselves might directly or indirectly cause severe personal injury or property damage.
1.3 Protective clothing
Kämmer products are often used in problematic applications (e.g. extremely high pressures, dang­erous, toxic or corrosive mediums). In particular valves with bellows seals point to such applications. When performing service, inspection or repair operations always ensure, that the valve and actuator are depressurised and that the valve has been cleaned and is free from harmful substances. In such cases pay particular attention to personal protection (protective clothing, gloves, glasses etc.).
1.4 Qualified personnel
Qualified personnel are people who, on account of their training, experience and instruction and their knowledge of relevant standards, specifications, accident prevention regulations and operating conditions, have been authorised by those responsible for the safety of the plant to perform the necessary work and who can recognise and avoid possible dangers.
1.5 Installation
DANGER:
serial-no. and/or the tag-no. to ensure that the valve/ actuator is correct for the intended application.
Do not insulate extensions that are provided for hot or cold services.
Pipelines must be correctly aligned to ensure that the valve is not fitted under tension.
indicates and provides additional technical
Before installation check the order-no,
KMEIM3001-00 - 09.03
1
Flow Control Division
Kammer Control Valves
1.6 Spare parts
Use only Kämmer original spare parts. Kämmer cannot accept responsibility for any damages that occur from using spare parts or fastening materials from other manufactures. If Kämmer products (especially sealing materials) have been on store for longer periods check these for corrosion or deterior­ation before using these products. Fire protection for Kämmer products must be provided by the end user.
1.7 Service / repair
To avoid possible injury to personnel or damage to products, safety terms must be strictly adhered to. Modifying this product, substituting nonfactory parts, or using maintenance procedures other than outlined in this instruction could drastically affect performance and be hazardous to personnel and equipment, and may void existing warranties. Between actuator and valve there are moving parts. To avoid injury Flowserve provides pinch-point-protection in the form of cover plates, especially where side-mounted positioners are fitted. If these plates are removed for inspection, service or repair special attention is required. After completing work the cover plates must be refitted.
Apart from the operating instructions and the obligatory accident prevention directives valid in the country of use, all recognised regulations for safety and good engineering practices must be followed.
WARNING:
STOP!
for repair or service Kämmer must be provided with
Before products are returned to Kämmer
a certificate which confirms that the product has been decontaminated and is clean. Kämmer will not accept deliveries if a certificate has not been provided (a form can be obtained from Kämmer).
1.8 Storage
In most cases Kämmer Products are manufactured from stainless steel. Products not manufactured from stainless steel are provided with an epoxy resin coating. This means that Kämmer products are well protected from corrosion. Nevertheless Kämmer products must be stored adequately in a clean, dry environment. Plastic caps are fitted to protect the flange faces to prevent the ingress of foreign materials. These caps should not be removed until the valve is actually mounted into the system.
1.9 Valve and actuator variations
These instructions cannot claim to cover all details of all possible product variations, nor in particular can they provide information for every possible example of installation, operation or maintenance. This means that the instructions normally include only the directions to be followed by qualified personal where the product is being used for is defined purpose. If there are any uncertainties in this respect particularly in the event of missing product-related information, clarification must be obtained via the appropriate FLOWSERVE sales office.
2 UNPACKING
2.1 Each delivery includes a packing slip. When unpack­ing, check all delivered valves and accessories using this packing slip.
2.2 Larger valves can be lifted using slings on the yoke rods or, if present, on the lugs provided for this pur­pose. If slings are used, attach them so that the outer tubing or attaching parts are not damaged.
WARNING:
of gravity of the valve may be above the lifting point.
STOP!
If slings are used, be aware that the centre
In this case, secure or support the valve against rotat­ing, to prevent damage or personnel injury.
2.3 Report transport damage to the carrier immediately.
2.4 In case of discrepancies, contact your nearest FLOWSERVE sales office.
3 INSTALLATION
3.1 Clean tubing prior to installing.
3.2 If possible, install the valve in an upright position (ac­tuator on top), to ease maintenance. An upright in­stallation position is important with low-temperature applications, in order to keep the distance between the packing material and the medium as large as pos­sible. The packing material then retains the ambient temperature as much as possible.
NOTE:
Do not insulate extension bonnets that are pro-
vided for hot or cold services
3.3 Make sure that sufficient overhead clearance above the actuator is maintained, to allow for disassembly of plug from the valve body (see following table).
Actuator Clearance Actuator Clearance
size (mm) size (mm)
37/47 95 P2 140 38/48 140 P3 140 39/49 140 P4 140
39D/49D 140 P5 140
3.4 After installing, check direction of flow again. The di­rection of flow is shown by the arrow on the housing.
3.5 If the valve is to be welded into the line, make sure that the valve is shielded from excessive heat.
3.6 Connect supply pressure and signal lines. Control valves are supplied with a positioner. The end con­nections for supply pressure and signal are clearly marked. Actuator and positioner are suitable for max.
4.2 bar (60 psi) supply pressure. If the supply pres-
2
Flow Control Division
Kammer Control Valves
sure exceeds the pressure specified on the nameplate, a pressure reducing station is required. If instrument air is not available, install an oil separator/air filter in the air inlet line. All connections must be leak free.
4 QUICK CHECK:
Before operating, check the valve as follows:
4.1 Open and close the valve, and observe the movement of the actuator stem. The movement must be smooth and linear.
4.2 Check for maximum stroke through change of signal (for pneumatic positioners, 0.2 - 1.0 bar or corre­sponding split-range values; for IP positioners, 4-20 or 0-20 mA).
4.3 Check all air connections for leaks.
4.4 Tighten packing nut (see table 1).
Torque
Thread PTFE Grafoil M20 x 1,5 1 3
M30 x 1,5 6 15 M38 x 1,5 15 35 M45 x 1,5 17 40
Table 1
NOTE:
An excessively tightened gland nut can cause excessive packing wear and can hinder the free move­ment of the plug stem.
5.2 Check bellows gasket and test connection - if present - for external leaks.
5.3 Check valve for damage caused by corrosive residues or corrosive vapours.
5.4 Clean valves and repaint as necessary.
Warning:
STOP!
clean the actuator/valve with a damp cloth only.
To prevent a buildup of electrostatic charge
5.5 Check gland nut for correct torque (see table 1)..
NOTE:
An excessively tightened gland nut can cause excessive packing wear and can hinder the free move­ment of the plug stem.
5.6 If possible, open and close valve and check for maxi­mum stroke and smooth movement of the plug stem. Irregular movement of the plug stem may indicate internal defects.
NOTE: With graphite packing, irregular movement of the plug stem is normal.
WARNING:
STOP!
all moving parts. Failure to do so can lead to serious
Keep hands, hair, clothing, etc. away from
injury.
5.7 Check all accessories for firm seating.
5.8 If possible, close supply pressure and check the fail­safe position.
5.10 Check stem boot for wear.
4.5 Check fail-safe position. To do this, close supply pres­sure and observe whether the valve opens or closes as defined.
4.6 After use at fluctuating temperatures, re-tighten all bolt connections and check for leaks.
5 MAINTENANCE
Check valves for correct functioning at regular intervals (at least once every 6 months) as follows. This check can be made when installed and in many cases without interrupting production. If internal defects are suspected, see section „Disassembly and Assembly of Valve“.
5.1 Examine gaskets for leaks and if necessary re-tighten bolts (see Fig. 1).
5.11 Check actuator for leaks. To do this, spray housing, air connections and plug stem guide with leak spray and check for any bubble formation.
5.12 Clean plug stem.
5.13 Check air filter, if present, and if necessary replace insert.
Note:
For further information regarding service and maintenance please contact your nearest FLOWSERVE office.
DANGER:
On actuators with aluminium cases the actuator springs must be renewed with original spare parts every 10 years or after 50.000 operating hours which ever occurs first.
3
Flow Control Division
Kammer Control Valves
Cap
Travel indicator
Yoke plate
Yoke nuts
Zero adjustment locknut
Actuator stem Locknuts
Gland nut Clamping nut
Plug stem
Actuator series 4
Fig. 1
Coupling
Coupling screws
Coupling insert
Locknut
Yoke plate
Yoke nuts
Actuator series 2
Fig. 1a
4
REMOVE AND INSTALL ACTUATOR
Flow Control Division
Kammer Control Valves
General Information
We recommend separating the actuator from the valve during all repair work. However, many maintenance and adjusting operations can be carried out in an installed condition.
6.1 Remove series 4 actuator (see Fig 1 + 2) For series 2 actuator see 6.3
For actuators with spring-to-close, go to 6.1.1 For actuators with spring-to-open, go to 6.1.2
6.1.1 Shut off air supply.
STOP!
WARNING:
pressure and drain all fluids from the valve before working on the actuator. Failure to do so can cause
Depressurise the line to atmospheric
serious injury.
6.1.2 Remove cap and nameplate. Tighten zero adjusting nut until it just touches the surface of the spring housing. This relieves the plug from actuator spring pressure. If the actuator is fitted with a handwheel this can be used to relieve the plug from actuator spring pressure.
6.1.3 Using a wrench, secure the actuator stem against turning and using a second wrench loosen the stem locknuts. If the actuator is fitted with a coupling re­fer to the procedure described in the maintenance instructions for the I/P actuator.
CAUTION:
The actuator stem must not be rotated,
as this will cause damage to the diaphragm.
6.1.4 Loosen gland and clamp nuts.
6.1.5 Secure plug stem against turning and unscrew ac­tuator from plug stem by rotating counter-clock­wise.
CAUTION:
Ensure that the plug assembly is not ro­tated with the plug seated. This may cause irrepa­rable damage to the seating faces.
6.1.5 Remove actuator and remove at the same time lock­nut, travel indicator disc, gland nut and clamp nut.
3.2 Install series 3 actuator Information:
Before the actuator is installed, it must be cali­brated according to section 3 of the instructions „Pneumatic and Electro-pneumatic Actuators“.
All worn or damaged parts must be replaced. Reusable parts must be clean.
6.2.1 Position actuator with clamp nut, gland nut, lock­nuts and travel indicator disc on the valve.
6.2.2 Only for „spring-to-close“ actuators: Screw actuator onto plug stem by rotating clock­wise, until the yoke plate just touches the valve hous­ing and the actuator is aligned forward. If the ac­tuator is fitted with a coupling refer to the proce­dure described in the maintenance instructions for the I/P actuator.
CAUTION:
Ensure that the plug assembly is not ro­tated with the plug seated. This may cause irrepara­ble damage to the seating faces.
Only for „spring-to-open“ actuators:
Lift plug stem and screw it into the lower coupling half until the distance between „plug in seat“ and „plug raised“ approximately corresponds to the speci­fied stroke.
6.2.3 Tighten clamp nut and gland nut.
6.2.4 Adjust seat tightness by screwing/unscrewing the plug stem in/out of the actuator stem.
CAUTION:
Ensure that the plug assembly is not ro­tated with the plug seated. This may cause irrepara­ble damage to the seating faces. Open valve, make adjustment, close valve and check for leaks. If the valve is fitted with a bellows seal the plug stem may NOT be rotated at all. In the case of a bellows seal adjustments are made with the coupling.
6.2.5 After adjusting, secure the locknuts and the travel indicator disc lying between them against actuator stem and align the travel indicator on the yoke rod.
6.3 Remove series 2 actuator (see Fig. 1a) For series 4 actuator see 6.1
6.3.1 Shut off air supply.
WARNING:
pressure and drain all fluids from the valve before
STOP!
Depressurise the line to atmospheric
working on the actuator. Failure to do so can cause serious injury.
6.3.2 Disconnect all tubing.
6.3.3 Remove 2 screws and remove coupling.
6.3.4 Remove yoke rod retaining nuts and lift actuator
assembly from the valve.
6.3.5 Remove coupling insert and it’s locknut from plug
stem.
NOTE:
Ensure that the plug assembly is not rotated with the plug seated. This may cause irreparable damage to the seating faces.
6.4 Install series 2 actuator
(see Fig. 1a)
The actuator stem must be fully extended: Actuators with air-to-open action must be fully vented. Actuators with air-to-close action apply supply pressure. Manually depress the plug stem to ensure the plug is fully seated.
6.4.1 Screw coupling insert locknut and coupling insert as far as possible onto plug stem.
6.4.2 Place the actuator assembly on the valve engaging the yoke rod threads in the lower yoke plate and ensuring the actuator faces in the correct direction.
5
Locknut
Flow Control Division
Kammer Control Valves
Packing follower
Packing
Guide bushing
Body
Gland nut
Clamp nut
Bonnet nut
Bonnet
Bonnet gasket
Plug stem
Seat ring
Seat ring gasket
Typical valve configuration
Fig. 1
6
4
Flow Control Division
Kammer Control Valves
7 DISASSEMBLE AND ASSEMBLE VALVE
General Information
We recommend separating the actuator from the valve before commencing repair work.
However, many maintenance and adjusting opera­tions can be carried out with the valve installed.
NOTE:
Never rotate the plug or perform any service on the valve while the plug is seated in the seat ring. Doing so may cause irreparable damage to the trim set. To ensure against this, always hold the plug out of the seat while working on the valve assembly.
7.1 Disassemble valve
7.1.1 Disconnect actuator from valve body
7.1.2 Hold the plug out of the seat. Using a 41 mm wrench loosen and unscrew the bonnet nut and remove the bonnet from the valve.
7.1.3 Carefully extract the plug from the bonnet. Note that the threaded section of the plug stem is slightly smaller in diameter than the guided section, this helps prevent damage to the packing when removing the plug from the bonnet.
7.2.5 Replace packing by inserting packing rings one at a time tapping each one down with a suitable bushing. NOTE:
ensure that the gaps in the packing rings are distributed evenly around the circumferance in the packing box (gaps not in line).
Different packings and fitting sequence is shown in the spare parts list.
7.2.6 Insert packing follower. Fit gland nut for transport purposes only. Gland nut to be fitted correctly and tightened down when the actuator is mounted.
7.1.4 Remove the packing follower, packing rings and guide bushing and clean the packing chamber.
7.1.5 Remove the bonnet gasket.
7.1.6 Remove seat and seat gasket.
7.1.7 Clean and inspect all parts.
7.2 Assemble valve
Attention: All worn or damaged parts must be re-
placed. Reusable parts must be clean. All consum­able items such as seals, and gaskets must always be renewed.
7.2.1 Replace seat gasket and seat ring.
7.2.2 Replace bonnet gasket.
7.2.3 Insert the plug into the bonnet. Install the guide bush­ing into the packing chamber with bevelled end fac­ing down and insert the bonnet in the valve body.
7.2.4 Coat the bonnet nut threads with a small amount of lubricant. Hold the plug stem fully retracted in the bonnet and thread the bonnet nut onto the body. Us­ing a 41 mm torque wrench torque the bonnet nut to 150 Nm.
7
Flow Control Division
Kammer Control Valves
Regional Headquarters
Flowserve Flowserve Flowserve
Manderscheidtstr. 19 1350 N. Mt. Springs Prkwy. 12 Tuas Avenue 20 45141 Essen Springville, UT 84663 Germany USA Singapore 638824 Telephone: +49 (0) 201 8919 5 Telephone: +1 801 489 8611 Telephone: +65 862 3332 Facsimile: +49 (0) 201 8919 662 Facsimile: +1 801 489 3719 Facsimile: +65 862 4940
Main Sales Offices (Europa, Middle east, Africa)
Flowserve Flowserve Flowserve Flowserve
von-Braun-Straße 19a 12, av. du Québec Station Road Allee du Quartz 1 48681 Ahaus 91965, Courtaboeuf Cedex Pershore, Worcestershire CH-2300 La-Chaux-de Fonds Germany France England WR102BZ Switzerland Telephone: +49 (0) 2561 6860 Telephone: +33 (0) 1 60 923 251 Telephone: +44 (0) 1386 55 45 51 Telephone: +41 (0) 32 925 9700 Facsimile: +49 (0) 2561 68648 Facsimile: +33 (0) 1 60 923 299 Facsimile: +44 (0) 1386 55 49 68 Facsimile: +41 (0) 32 926 5422
Flowserve Flowserve
Cnr. Bismit and Granier Str. C/O Saleh & Abdulaziz Abahsain Jet Park Ext 3 P.O. Box 209 Boksburg 1459 Gauteng Al Khobar 31952 South Africa Saudi Arabia Telephone: +27 397-3150 Telephone: 9663 857 3442 Facsimile: +27 397-5300/01/02 Facsimile: 9663 859 5284
8
©01.2001 Flowserve Corporation. Flowserve and Kämmer are trademarks of Flowserve Corporation
All data subject to change without notice
Loading...