Daikin EKHY3PART Installation manuals

Daikin EKHY3PART Installation manuals

EKHY3PART

4P376829-1 B

00000006

 

 

 

A

B

R5T

M3S

 

 

K3M+X7M

 

 

 

 

K3M

 

 

 

 

13

 

 

 

 

1 3

X13A

 

 

 

 

 

 

 

2 4

 

 

 

 

14

 

 

 

 

 

 

 

230 V AC / 400 V AC

X7M

 

 

 

max. 3 kW

 

 

 

 

L

N PE

 

 

 

 

 

 

≥3/4"

≤85°C

 

 

 

≥3/4"

 

*HYHB(H/X)*A*

EHB(H/X)*(D/E)* + ETB(H/X)*(D/E)*

EAB(H/X)*D*

 

≥0.45 m²

 

≥1.05 m²

≥1.8 m²

ONLY FOR THE UK

Domestic hot water installations must be installed, commissioned and maintained by a competent person in accordance with Building

Regulation G3 (England and Wales), Technical Standard P3 (Scotland) or Building Regulation P5 (Northern Ireland) and the Water Fitting

Regulations (England and Wales) or Water Byelaws (Scotland). As such, the installed cylinder must comply with the above mentioned regulations.

To comply, the required safety devices can include, but are not limited to:

-a thermal cut out

-a temperature / pressure relief valve

-a motorised 2-port valve to interrupt the flow in case of high temperature

-other if required according to (local) regulations

1

EKHY3PART

 

 

4P376829-1B – 2021.04

*HYHB(H/X)*A*

*HYHB(H/X)*A*

X9A

<![if ! IE]>

<![endif]>10

<![if ! IE]>

<![endif]>9

<![if ! IE]>

<![endif]>8a

<![if ! IE]>

<![endif]>8

X2M

 

X1M

X5M

M3S

 

X2M.10

 

 

 

 

BK

 

Y

 

 

X2M.9

N

 

 

 

 

 

BU

 

 

 

 

 

L M3S

 

X2M.8

 

 

 

 

(SPST)

 

BN

 

 

 

R5T

X9A.1

R5T

–t°

X9A.2

EKHY3PART

2

 

4P376829-1B – 2021.04

 

Loading...
+ 2 hidden pages