AZEK Reserve Connector User Manual

CONNECTOR KIT INSTALLATION GUIDELINES for
AZEK Reserve
In order to ensure beautiful installation of Trademark Reserve railing, we have four easy-to-use decorative connector kits to fit every angle: In-Line Top Rail Connectors, 22.5 Degree Top Rail Connectors, 45 De­gree Top Rail Connectors and Post Connectors. Please see below for information on each application.
CUTTING THE TOP RAIL:
When cutting the top rail, allow for approximately 1/8” gap per side between corresponding top rails to ensure adequate space for the In-Line, 22.5 De­gree or 45 Degree Top Rail Connectors.
Slide the appropriate Top Rail Connector onto the top rail. Slide the other top rail into the other end of the connector with the assembled top rails over the railing section. Press the top rails onto the retainer, ensuring that they sit fully onto the re­tainer. (TIP: If top rail is too snug to easily push on,
22.5 Degree Top Rail Connector
loosen the #14ss screws on the post brackets so that the rail can be adjusted. Be sure to retighten the screws when top rail is installed.)
Page 1
In-Line Top Rail Connector
POST CONNECTOR:
The Post Connector allows for a flush clean at­tachment to the post. Add a liberal amount of caulking to the post side of the connector inside the lip to adhere the connector to the post and slide it onto the pre-cut Top Rail. Install the Top Rail onto the sub rail Retainer, post side first as per instructions. (NOTE: Remove any excess caulking with a damp cloth.)
45 Degree Top Rail Connector
Post Connector
ARIG_v1_0211
Loading...