AZEK Post Sleeve User Manual

POST SLEEVE INSTALLATION INSTRUCTIONS for
AZEK Premier AZEK Trademark AZEK Reserve
WARNING: POST SLEEVES ARE NOT DESIGNED TO BE USED IN STRUCTURAL APPLICATIONS. THEREFORE, THEY SHOULD NOT BE USED WHERE THEY MAY BE SUBJECT TO WEIGHT BEARING APPLICATIONS SUCH AS SUPPORTS FOR A ROOF OF A PORCH OR DECK. POST SLEEVES SHOULD NOT BE NOTCHED FOR INSTALLATION.
1. POST SLEEVE INSTALLATION
NOTE: 108” and 115” POST SLEEVES ARE DESIGNED TO BE CUT INTO MULTIPLE STANDARD POST SLEEVE LENGTHS.
NOTE: BEFORE MOUNTING RAILING SECTION TO POST SLEEVE, INSTALLER MAY NEED TO TEMPORARILY SHIM POST SLEEVE TO KEEP POST FROM TWISTING OR BECOMING OUT OF PLUMB.
• The Post Sleeve has been designed to slide easily over a nominal wood 4 x 4 (min. 3 3/8” x 3 3/8”, max. 3 9/16” x 3 9/16”) post after the deck sub-structure is complete and the deck boards have been fastened.
TOP VI EW
DECK JOISTS
Page 15
Page 1
• The 4 x 4 should extend down to the bottom of the rim joist and be completely “BOXED IN” around all 4 cor­ners for the firmest attachment (see Figure 1).
• At this time, make sure the 4 x 4 wood posts are level and plumb to ease the installation of your railing sys­tem. If the nominal wood 4 x 4 post is twisted or over­sized it will be necessary to shave the 4 x 4 wood post.
• Slide the Post Sleeve over the wood post (Do not force the Post Sleeve over the 4 x 4 as it may eventually lead to a crack or split).
• Post Sleeves may also be used over a wood post in­stalled with a Surface Mount Bracket or over a Tallboy Surface Mount Bracket. For installation of a wood post to concrete, refer to the Surface Mount Bracket installa­tion instructions or your local dealer.
• When using 6 x 6 post sleeves, a minimum 5 3/8” x 5 3/8” and a maximum 5 9/16” x 5 9/16” outside post dimension is required for a proper fit.
ACCESSORY
2. POST SLEEVE HEIGHT CALCULATIONS
• Calculate and cut Post Sleeve to required height (see Figure 2). Slide Post Sleeve over 4” x 4” wood post into position. For 36” rail, cut Post Sleeve to a minimum of 38”. For 42” rail, cut Post Sleeve to a minimum of 44”.
CENTER SUPPORT
3. POST SLEEVE MEASUREMENTS & CUTTING
POST SUPPORT MATERIAL
17/8"
1/2" x 8" or 10"
CARRIAGE BOLT
POST HEIGHT C ALCUL AT IO N
2" x 8" DECK JOIS T
4x4 WOOD POST
7
1
/8"
(1) 38 (For 36")
36" Or
(2) 44" (For 42")
42"
GRADE LEVEL
NUT AND WASHER
4" x 4" WOOD POST
Figure 1
Or
• Measure between posts, top and bottom to obtain the rail length. Also check the opening to ensure the Post Sleeves, newel posts or walls where the rail is to be installed are square and plumb.
© 2013 AZEK Building Products. All rights reserved
Figure 2
Loading...