AZEK ADA Handrail User Manual

ADA HANDRAIL INSTALLATION GUIDELINES for
AZEK Premier
AZEK Trademark
ADA COMPLIANT RAILING SYSTEM for
AZEK Reserve
Page 1
AZEK Premier AZEK Trademark AZEK Reserve
Page 1
Please read all instructions completely before starting any part of the installation.
AZEK Rail should be installed using the same good building principals used to install wood or composite railing and in accordance with the local building codes and the installation guidelines included below. AZEK Building Products Inc. claims no liability or responsibility for the improper installation of this product. AZEK Rail may not be suitable for every application and it is the sole responsibility of the installer to be sure that AZEK Rail is fit for the intended use. Since all installations are unique, it is also the installers responsibility to determine specific requirements in regards to each Rail application. AZEK Building Products recommends that all designs be reviewed by a licensed architect, engineer or local building official before installation. Should you have specific questions prior to installation, please call AZEK customer service at 877-ASK-AZEK (877-275-2935) or visit our website at www.azek.com. AZEK Railing is tested as a whole system and should be used that way. It is not intended to be used in conjunction with other railing systems or fasteners. The following Installation Guidelines are applicable for installation of AZEK Premier, AZEK Trademark, and AZEK Reserve Rail Systems (except AZEK Reserve over post applications).
Safety: Always wear goggles when handling, cutting, drilling and fastening materials. Note: Check local code requirements prior to installation.
Secondary Handrail System
Aluminum and PVC tube should always be cut at the same length.
If using a power saw, a carbide tip blade of at least 60 teeth is recommended.
Use an adhesive appropriate for bonding aluminum
Bracket or return kit required every 72”
Hand Rail Components
WARNING: Always wear safety goggles
2
1
5
10
4
104"Straight Rail
1
1.5" diameter (PVC with aluminum stiffener)
3
Hand Rail
4
Bracket with screws and cap
(Cast aluminum)
Post Return
7
(PVC with aluminum stiffener)
Wall Return &
2
Cover Plate
(PVC with aluminum stiffener)
90° Corner
5
(PVC)
Straight Joiner
8
(Not visible)
Straight Wall
3
Return
(Cast aluminum)
End Loop
6
(PVC with aluminum stiffener)
Adjustable Joiner
9
(Not visible)
6
11
7
10
Joint Ring
(Plastic)
Rail End Cap
11
(Plastic)
Angled Hand
12
Rail Bracket
(Cast aluminum)
© 2013 AZEK Building Products. All rights reserved
ADA HANDRAIL INSTALLATION GUIDELINES for
AZEK Premier
AZEK Tr
AZEK Reserve
ademark
ADA COMPLIANT RAILING SYSTEM for
Page 2
AZEK Premier AZEK Trademark AZEK Reserve
Page 2
90° Wall Return
4.
Cut the aluminum and PVC tube to proper length.
1. Apply adhesive to all metal contact surfaces.
2
3. Slide joiner into wall return and aluminum rail support.
4.
into place. Screws provided are for attachment to AZEK post sleeve and are not meant for other surfaces.
2.
Ensure adhesive cures per adhesive manufacturers instructions.
1.
3.
Straight Wall Return
1.
3.
4.
Cut the aluminum and PVC tube to proper length.
1. Apply adhesive to all metal contact surfaces.
2
3. Insert straight wall return into aluminum rail support.
4.
cover into place. Screws provided are for attachment to AZEK post sleeve and are not meant for other surfaces.
2.
Ensure adhesive cures per adhesive manufacturers instructions.
Hand Rail Bracket
2.
4.
1. Attach bracket to mounting surface
using a 3/8” lag bolt provided with Hand Rail Bracket.
2. Place rail at appropriate location on bracket.
3. Pre-drill two holes in rail with a 1/4” bit at appropriate
location and attach with screws provided.
4.5. Snap bolt cover into place.
Using PVC adhesive, attach hand rail end cap
(sold separately) to end of rail.
1.
3.
5.
90° Corner
Cut the aluminum and PVC tube to proper length.
1. Apply adhesive to all metal contact surfaces.
2. Slide joiner into each side of corner and aluminum rail supports until the joints are tight.
1.
2.
2.
Ensure adhesive cures per adhesive manufacturers instructions.
© 2013 AZEK Building Products. All rights reserved
Loading...
+ 1 hidden pages