Anritsu 69397B, 69387B, 69377B, 69367B, 69347B User Manual

...
SERIES 693XXB
SYNTHESIZED HIGH PERFORMANCE
SIGNAL GENERATOR
OPERATION MANUAL
490 JARVIS DRIVE MORGAN HILL, CA 95037-2809
P/N: 10370-10348
REVISION: B
PRINTED: APRIL 2001
WARRANTY
The Anritsu product(s) listed on the title page is (are) warranted against defects in materials and workmanship for one year from the date of shipment.
Anritsu's obligation covers repairing or replacing products which prove to be defective during the warranty period. Buyers shall prepay transportation charges for equipment returned to Anritsu for warranty repairs. Obligation islimited to the originalpurchaser. Anritsuis not liable forconsequen tial damages.
LIMITATION OF WARRANTY
The foregoing warranty does not apply to Anritsu connectors that have failed due to normal wear. Also, the warranty does not apply to defects resulting from improper or inadequate maintenance by the Buyer, unauthorized modification or misuse, or operation outside of the environmental specifi­cations of the product. Noother warranty isexpressed orimplied, and theremedies provided herein are the Buyer's sole and exclusive remedies.
TRADEMARK ACKNOWLEDGEMENTS
Adobe Acrobat is a registered trademark of Adobe Systems Incorporated.
NOTICE
Anritsu Company has prepared this manual for use by Anritsu Company personnel and customers as a guide for the proper installation, operation, and maintenance of Anritsu Company equipment and computor programs. The drawings, specifications, and information contained herein are the property of Anritsu Company, and any unauthorized use or disclosure of these drawings, specifica tions, and informationis prohibited; theyshall not bereproduced, copied, orused in whole orin part as the basis for manufacture or sale of the equipment or software programs without the prior writ ten consent of Anritsu Company.
-
-
-
Safety Symbols
To prevent the risk of personal injury or loss related to equipment malfunction, Anritsu Company uses the following symbols to indicate safety-related information. For your own safety, please read the information carefully BEFORE operating the equipment.
WARNING WARNING indicates a hazard. It calls attention to a procedure that
could result in personal injury or loss of life if not performed properly. Do not proceed beyond a WARNING notice until the indicated condi tions are fully understood and met.
CAUTION CAUTION indicates a hazard. It calls attention to a procedure which,
if not performed properly, could result in damage to or destruction of a component of the instrument. Do not proceed beyond a CAUTION note until the indicated conditions are fully understood and met.
The instrument is marked with this symbol to indicate that it is neces­sary for the user to refer to the instructions in the operation manual.
-
Indicates ground.
Indicates heavy weight equipment.
693XXB OM Safety-1
For Safety
WARNING
When supplying power to this equipment, always use a three-wire power cable connected to a three-wire power line outlet. If power is supplied without grounding the equip ment in this manner, there is a risk of receiving a severe or fatal electric shock.
WARNING
Before changing the fuse, always remove the power cord from the power outlet. There is the risk of receiving a fatal electric shock if the fuse is replaced with the power cord con nected.
Always use a new fuse of the type and rating specified by the fuse markings on the rear panel of the instrument.
-
-
WARNING
There are no operator serviceable components inside. Refer servicing of the instrument to qualified service technicians.
To prevent the risk of electrical shock or damage to precision components, do not remove the equipment covers.
WARNING
Use two or more people to lift and move this equipment, or use an equipment cart. There is a risk of back injury, if this equipment is lifted by one person.
WARNING
If the equipment is used in a manner not specified by the manufacturer, the protection provided by the equipment may be impaired.
Safety-2 693XXB OM

Table of Contents

Chapter 1 General Information
1-1 SCOPE OF MANUAL.................1-3
1-2 INTRODUCTION ...................1-3
1-3 DESCRIPTION ....................1-3
1-4 IDENTIFICATION NUMBER ............1-5
1-5 ELECTRONIC MANUAL...............1-5
1-6 RELATED MANUALS ................1-5
GPIB Programming Manual ...........1-5
SCPI Programming Manual ...........1-5
Maintenance Manual ..............1-6
1-7 OPTIONS .......................1-6
1-8 PERFORMANCE SPECIFICATIONS ........1-8
1-9 RECOMMENDED TEST EQUIPMENT .......1-8
Chapter 2 Installation
2-1 INTRODUCTION ...................2-3
2-2 INITIAL INSPECTION ................2-3
2-3 PREPARATION FOR USE ..............2-4
Power Requirements...............2-4
Line Voltage Selection ..............2-4
Power Connection ................2-4
Standby Operation................2-5
Warmup Time ..................2-6
Operating Environment .............2-6
2-4 GPIB SETUP AND INTERCONNECTION .....2-7
Interface Connector ...............2-7
Cable Length Restrictions ............2-7
GPIB Interconnection ..............2-7
Setting the GPIB Address ............2-7
Selecting the Line Terminator ..........2-9
Selecting the Interface Language.........2-9
2-5 RACK MOUNTING KIT INSTALLATION .....2-10
Preliminary ..................2-10
Procedure ...................2-10
693XXB OM i
Table of Contents (Continued)
2-6 PREPARATION FOR STORAGE/SHIPMENT . . . 2-13
Preparation for Storage.............2-13
Preparation for Shipment............2-13
Chapter 3 Local (Front Panel) Operation
3-1 INTRODUCTION ...................3-5
3-2 FRONT PANEL LAYOUT...............3-6
Line Key ....................3-6
Data Display Area ................3-6
Data Entry Area.................3-7
RF Output Control Key .............3-7
Connectors ...................3-7
3-3 DATA DISPLAY AREA ................3-8
Menu Display Format ..............3-9
Menu Keys ...................3-10
3-4 DATA ENTRY AREA.................3-12
3-5 INSTRUMENT START-UP .............3-14
Powering Up the 693XXB............3-14
Start-Up Display ................3-14
Standby Operation ...............3-14
Self-Testing the 693XXB ............3-15
Resetting to Default Parameters ........3-15
3-6 ENTERING DATA ..................3-18
Opening the Parameter.............3-18
Editing the Current Value ...........3-19
Entering a New Value .............3-20
3-7 CW FREQUENCY OPERATION ..........3-21
Selecting CW Mode...............3-21
Selecting a CW Frequency ...........3-22
Selecting a Power Level.............3-24
CW Ramp ...................3-25
3-8 SWEEP FREQUENCY OPERATION ........3-26
Analog Sweep Mode ..............3-26
Selecting Analog Sweep Mode..........3-26
Setting Sweep Time ..............3-27
Selecting a Sweep Trigger ...........3-28
Step Sweep Mode................3-29
ii 693XXB OM
Table of Contents (Continued)
Selecting Step Sweep Mode ...........3-29
Setting Step Size, Dwell Time, and Sweep Time. 3-29
Manual Sweep Mode ..............3-32
Selecting Manual Sweep Mode .........3-32
Selecting a Sweep Range ............3-33
Selecting a Power Level.............3-35
Frequency Markers...............3-36
Selecting Alternate Sweep Mode ........3-38
List Sweep Mode ................3-41
Selecting List Sweep Mode ...........3-42
Editing the List ................3-43
Selecting a List Sweep Range..........3-46
Selecting a List Sweep Trigger .........3-47
3-9 FIXED POWER LEVEL OPERATION .......3-49
Selecting Fixed Power Level Mode .......3-49
Selecting a Power Level.............3-49
Level Offset ..................3-52
3-10 POWER LEVEL SWEEP OPERATION.......3-53
Selecting CW Power Sweep Mode ........3-53
Setting CW Power Sweep Step Size and
Dwell Time...................3-54
Selecting a CW Power Sweep Trigger ......3-55
Selecting a Power Level Sweep Range......3-56
Selecting a Sweep Frequency / Step Power
Mode......................3-58
Setting Power Level Step Size .........3-59
3-11 LEVELING OPERATIONS .............3-60
Selecting a Leveling Mode ...........3-60
Attenuator Decoupling .............3-64
ALC Power Slope................3-65
User Cal (User Level Flatness Correction) . . . 3-67
3-12 SIGNAL MODULATION ..............3-73
Amplitude Modulation Operating Modes ....3-73
Providing Amplitude Modulation ........3-73
Frequency Modulation Operating Modes ....3-78
Providing Frequency Modulation ........3-78
Phase Modulation Operating Modes.......3-83
Providing Phase Modulation ..........3-83
Pulse Modulation Operating Modes .......3-87
Providing Pulse Modulation...........3-88
693XXB OM iii
Table of Contents (Continued)
3-13 SYSTEM CONFIGURATION ............3-96
Configuring the Front Panel ..........3-97
Configuring the Rear Panel...........3-98
Configuring the RF ...............3-99
Configuring the GPIB .............3-101
Setting Increment Sizes ............3-104
3-14 SAVING/RECALLING INSTRUMENT SETUPS . 3-105
Saving Setups.................3-105
Recalling Setups................3-105
Erasing Stored Setups.............3-106
3-15 SECURE OPERATION...............3-107
3-16 REFERENCE OSCILLATOR CALIBRATION . . 3-108 3-17 INTERNAL POWER MEASUREMENT
(OPTION 8) .....................3-110
Chapter 4 Local Operation–Menu Maps
4-1 INTRODUCTION ...................4-3
4-2 MENU MAP DESCRIPTION .............4-3
Chapter 5 Operation Verification
5-1 INTRODUCTION ...................5-3
5-2 TEST EQUIPMENT..................5-3
5-3 TEST RECORDS ...................5-3
5-4 INITIAL 693XXB CHECKOUT............5-4
Power Up ....................5-4
Self Test.....................5-4
Resetting the 693XXB ..............5-4
Warmup Time ..................5-4
5-5 CW FREQUENCY ACCURACY TEST........5-5
Test Setup....................5-5
Test Procedure..................5-6
5-6 POWER LEVEL ACCURACY AND FLATNESS
TESTS ........................5-13
Test Setup ...................5-13
Power Level Accuracy Test Procedure ......5-14
Power Level Flatness Test Procedure ......5-15
iv 693XXB OM
Table of Contents (Continued)
Chapter 6 Operator Maintenance
6-1 INTRODUCTION ...................6-3
6-2 ERROR AND WARNING/STATUS MESSAGES. . . 6-3
Self-Test Error Messages.............6-3
Normal Operation Error and Warning/ Status
Messages ....................6-8
6-3 TROUBLESHOOTING ...............6-13
6-4 ROUTINE MAINTENANCE ............6-16
Cleaning the Fan Filter.............6-16
Cleaning the Data Display ...........6-16
Replacing the Line Fuse ............6-17
Chapter 7 Use With Other Instruments
7-1 INTRODUCTION ...................7-3
7-2 MASTER-SLAVE OPERATION ...........7-4
Connecting the Instruments ...........7-4
Initiating Master-Slave Operation ........7-5
Master-Slave Operation .............7-7
Master-Slave Operation in VNA Mode ......7-7
Terminating Master-Slave Operation .......7-9
7-3 USE WITH A 56100ASCALAR NETWORK
ANALYZER......................7-10
Connecting the 693XXB to the 56100A .....7-10
7-4 USE WITH A 360B VECTOR NETWORK
ANALYZER......................7-11
Connecting the 693XXB to the 360B ......7-11
Modes of Operation...............7-12
Source Lock Mode ...............7-12
Tracking Mode .................7-14
7-5 USE WITH A 8003 SCALAR NETWORK
ANALYZER......................7-16
Connecting the 693XXB to the 8003.......7-16
Setting Up the 693XXB.............7-17
Initiating 8003 SNA Operation .........7-18
693XXB OM v
Table of Contents (Continued)
7-6 USE WITH A HP8757D SCALAR NETWORK
ANALYZER......................7-20
Connecting the 693XXB to the HP8757D ....7-20
Setting Up the 693XXB.............7-21
Initiating HP8757D SNA Operation.......7-23
Appendix A Rear Panel Connectors
A-1 INTRODUCTION...................A-1
A-2 REAR PANEL CONNECTORS ...........A-1
A-3 CONNECTOR PINOUT DIAGRAMS ........A-1
Appendix B Performance Specifications
vi 693XXB OM

Chapter 1 General Information

Table of Contents
1-1 SCOPE OF MANUAL.................1-3
1-2 INTRODUCTION ...................1-3
1-3 DESCRIPTION ....................1-3
1-4 IDENTIFICATION NUMBER ............1-5
1-5 ELECTRONIC MANUAL...............1-5
1-6 RELATED MANUALS ................1-5
GPIB Programming Manual ...........1-5
SCPI Programming Manual ...........1-5
Maintenance Manual ..............1-6
1-7 OPTIONS .......................1-6
1-8 PERFORMANCE SPECIFICATIONS ........1-7
1-9 RECOMMENDED TEST EQUIPMENT .......1-8
Figure 1-1. Series 693XXB Synthesized High Performance Signal Generator
Chapter 1 General Information
1-1 SCOPE OF MANUAL This manual provides general information, installation, and operating
information for the Anritsu Series 693XXB Synthesized High Perform ance Signal Generator. (Throughout this manual, the terms 693XXB and signal generator will be used interchangeably to refer to the in strument.) Manual organization is shown in the table of contents.
1-2 INTRODUCTION This chapter contains general information about the series 693XXB
signal generator. It includes a general description of the instrument and information on its identification number, related manuals, op tions, and performance specifications. Alisting of recommended test equipment is also provided.
1-3 DESCRIPTION The Series 693XXB Synthesized High Performance Signal Generators
are microprocessor-based,synthesized signal sources with high resolu­tion phase-lock capability. They generate both discrete CW frequencies and broad (full range) and narrow band sweeps across the frequency range of 10 MHz to 65 GHz. All functions of the signal generators are fully controllable locally from the front panel or remotely (except for power on/standby) via the IEEE-488 General Purpose Interface Bus (GPIB).
-
-
-
The series presently consist of seven models covering a variety of fre quency ranges and power levels. Table 1-1, on the following page, lists models, frequency ranges, and maximum leveled output.
-
693XXB OM 1-3
GENERAL 693XXB INFORMATION MODELS
Table 1-1. Series 693XXB Models
693XXB
Model
69317B 0.01 – 8.4 GHz +13.0 dBm +11.0dBm +9.0 dBm 69337B 2.0 – 20.0 GHz +13.0 dBm +11.0dBm +3.0 dBm 69347B 0.01 – 20.0 GHz +13.0 dBm +11.0dBm +3.0 dBm
69367B
69377B
69387B
69397B
Frequency Output Power
0.01 – 2.0 GHz
2.0 – 20.0 GHz
20.0 – 40.0 GHz
0.01 – 2.0 GHz
2.0 – 20.0 GHz
20.0 – 40.0 GHz
40.0 – 50.0 GHz
0.01 – 2.0 GHz
2.0 – 20.0 GHz
20.0 – 40.0 GHz
40.0 – 50.0 GHz
50.0 – 60.0 GHz
0.01 – 2.0 GHz
2.0 – 20.0 GHz
20.0 – 40.0 GHz
40.0 – 50.0 GHz
50.0 – 65.0 GHz
With Option 15B (High Power) Installed
+13.0 dBm
+9.0 dBm +6.0 dBm
+11.0dBm +10.0 dBm
+2.5 dBm +2.5 dBm
+11.0dBm +10.0 dBm
+2.5 dBm +2.0 dBm +2.0 dBm
+11.0dBm +10.0 dBm
+2.5 dBm
0.0 dBm
–2.0 dBm
Output Power
w/Step Attenuator
+11.0dBm
+7.0 dBm +3.0 dBm
+10.0 dBm
+8.5 dBm
0.0 dBm
–1.0 dBm
+10.0 dBm
+8.5 dBm
0.0 dBm –1.5 dBm –2.0 dBm
Not Available Not Available
Output Power
w/Electronic
Step Attenuator
Not Available
Not Available
Not Available
69317B 69337B 2.0 – 20.0 GHz +17.0 dBm +15.0 dBm +7.0 dBm 69347B
69367B 69377B 0.01 – 50.0 GHz Standard Standard Not Available
69387B 0.01 – 60.0 GHz Standard Standard Not Available
Note: In models with Option 22 that have a high-end frequency of £20 GHz, rated output power is reduced by 1 dB
In models with Option 22 that have a high-end frequency of >20 GHz, rated output power is reduced by 2 dB.
0.01 – 2.0 GHz
2.0 – 8.4 GHz
0.01 – 2.0 GHz
2.0 – 20.0 GHz
0.01 – 20.0 GHz
20.0 – 40.0 GHz
+13.0 dBm +17.0 dBm
+13.0 dBm +17.0 dBm
+13.0 dBm
+6.0 dBm
+11.0dBm
+15.0 dBm
+11.0dBm
+15.0 dBm
+11.0dBm
+3.0 dBm
+11.0dBm +11.0dBm
+11.0dBm
+7.0 dBm
Not Available
1-4 693XXB OM
GENERAL IDENTIFICATION INFORMATION NUMBER
1-4 IDENTIFICATION
NUMBER
All Anritsu instruments are assigned a unique six-digit ID number, such as “875012.” The ID number is imprinted on a decal that is af fixed to the rear panel of the unit. Special-order instrument configura tions also have an additional special serial number tag attached to the rear panel of the unit.
When ordering parts or corresponding with Anritsu Customer Service, please use the correct serial number with reference to the specific in strument's model number (i.e., Model 69347B Synthesized High Per formance Signal Generator, Serial No. 875012).
-
-
-
1-5 ELECTRONIC MANUAL This manual is available on CD ROM as an Adobe Acrobat Portable
Document Format (*.pdf) file. The file can be viewed using Acrobat Reader, a free program that is also included on the CD ROM. The file is “linked” such that the viewer can choose a topic to view from the displayed “bookmark” list and “jump” to the manual page on which the topic resides. The text can also be word-searched. Contact Anritsu Customer Service for price and availability.
1-6 RELATED MANUALS This is one of a four manual set that consists of an Operation Manual,
a GPIB Programming Manual, a SCPI Programming Manual, and a Maintenance Manual.
-
GPIB Programming Manual
SCPI Programming Manual
This manual provides information for remote opera­tion of the signal generator with Product Specific commands sent from an external controller via the IEEE 488 General Purpose Interface Bus (GPIB). It contains a general description of the GPIB and bus data transfer and control functions, a complete list ing and description of all 693XXB GPIB Product Specific commands, and several programming exam ples. The Anritsu part number for the GPIB Pro gramming Manual is 10370-10349.
This manual provides information for remote opera tion of the signal generator with Standard Com mands for Programmable Instruments (SCPI) commands sent from an external controller via the IEEE 488 General Purpose Interface Bus (GPIB). It contains a general description of the GPIB and bus data transfer and control functions, a complete list ing and description of each command in the 693XXB SCPI command set, and examples of command us age. The Anritsu part number for the SCPI Pro gramming Manual is 10370-10350.
-
-
-
-
-
-
-
-
693XXB OM 1-5
GENERAL INFORMATION OPTIONS
Maintenance Manual
The Maintenance Manual supplies service informa tion for all models in the 693XXB series. The service information includes functional circuit descriptions, block diagrams, performance verification tests, cali bration procedures, troubleshooting data, and as sembly and component removal/replacement procedures. The Anritsu part number for the Main tenance Manual is 10370-10351.
1-7 OPTIONS The following options are available.
Option 1, Rack Mounting. Rack mount kit containing a set of track slides (90° tilt capability), mounting ears, and front panel han dles for mounting the instrument in a standard 19-inch equipment rack.
Option 2A, 110 dB Step Attenuator. Adds a 10 dB per step attenuator with a 110 dB range for models having a high-end fre­quency of £20 GHz. Output power is selected directly in dBm on the front panel (or via GPIB). Rated RF output power is reduced.
Option 2B, 110 dB Step Attenuator. Adds a 10 dB per step attenuator with a 110 dB range for models having a high-end fre­quency of £40 GHz. Output power is selected directly in dBm on the front panel (or via GPIB). Rated RF output power is reduced.
-
-
-
-
-
Option 2C, 90 dB Step Attenuator. Adds a 10 dB per step attenuator with a 90 dB range for models having a high-end fre­quency of £50 GHz. Output power is selected directly in dBm on the front panel (or via GPIB). Rated RF output power is reduced.
Option 2D, 90 dB Step Attenuator. Adds a 10 dB per step attenuator with a 90 dB range for modes having a high-end fre quency of £60 GHz. Output power is selected directly in dBm on the front panel (or via GPIB). Rated RF output power is reduced.
Option 2E, 120 dB Electronic Step Attenuator. Addsa10dB per step electronic attenuator with a 120 dB range for models hav ing a high-end frequency of £8.4 GHz. Output power is selected di rectly in dBm on the front panel (or via GPIB). Rated RF output power is reduced.
Option 2F, 120 dB Electronic Step Attenuator. Addsa10dB per step electronic attenuator with a 120 dB range for models hav ing a high-end frequency of £20 GHz. Output power is selected di rectly in dBm on the front panel (or via GPIB). Rated RF output power is reduced.
Option 6, Phase Modulation (FM). Adds phase modulation capa bility. The internal FM generator becomes the FM/FM generator. (Not available in combination with Option 7.)
-
-
-
-
-
-
1-6 693XXB OM
GENERAL PERFORMANCE INFORMATION SPECIFICATIONS
Option 7, Delete AM/FM Generator. Deletes the internal AM and FM generators. External AM and FM capability remains un changed. (Not available in combination with Option 6 or 8.)
Option 8, Internal Power Meter. Adds an internal power meter that is compatible with Anritsu 560-7, 5400-71, or 6400-71 series de tectors. (Not available in combination with Option 7.)
Option 9, Rear Panel RF Output. Moves the RF output connector to the rear panel.
Option 10, User-Defined Modulation Capability. Provides user-defined waveform capability for complex modulation. Requires a computer/controller (not included). Includes cable and Windows based software. (Not available in combination with Option 7.)
Option 11, 0.1 Hz Frequency Resolution. Provides frequency resolution of 0.1 Hz.
Option 14, Rack Mounting without Chassis Slides. Modifies rack mounting hardware to install unit in a console that has mount­ing shelves. Includes mounting ears and front panel handles.
-
-
Option 15B, High Power Output. Adds high-power RF compo­nents to the instrument providing increased RF output power in the 2–20 GHz frequency range. Option 15B is standard in models hav­ing a high-end frequency that is >40 GHz.
Option 16, High-Stability Time Base. Adds an ovenized, 10 MHz crystal oscillator with <5 x 10
Option 17A, No Front Panel. Deletes the front panel for use in re­mote control applications where a front panel display or keyboard control are not needed.
Option 18, mmWave Module Bias Output. Provides bias output for 54000-xWRxx Millimeter Wave Source Modules. BNC Twinax connector, rear panel
Option 19, SCPI Programmability. Adds GPIB command mne monics complying with Standard Commands for Programmable In struments (SCPI), Version 1993.0. SCPI programming complies with IEEE 488.2-1987.
Option 21B, Digital Down Converter. Replaces the standard Analog Down Converter (0.01 to 2.0 GHz) with a Digital Down Con verter (0.01 to 2.2 GHz).
Option 22, 0.01 to 10.0 MHz Audio Frequency. Adds frequency coverage below 10 MHz. In models having a high-end frequency of £20 GHz, rated output power is reduced by 1 dB; in models having a high-end frequency of >20 GHz, rated output power is reduced by 2 dB.
–10
/day frequency stability.
-
-
-
693XXB OM 1-7
GENERAL RECOMMENDED INFORMATION TEST EQUIPMENT
1-8 PERFORMANCE
SPECIFICATIONS
1-9 RECOMMENDED TEST
EQUIPMENT
Series 693XXB Synthesized High Performance Signal Generator per formance specifications are provided in Appendix B.
Table 1-3 lists the recommended test equipment for performing the Se ries 693XXB Synthesized Signal Generator operation verification tests in Chapter 5.
Table 1-3. Recommended Test Equipment
Instrument Critical Specification Recommended Manufacturer/Model
Frequency Counter, with Cable Kit and External Mixer
Power Meter, with Power Sensors
Range: 0.01 to 65 GHz Input Z: 50W Resolution: 1Hz Other: External Time Base
Input
Range: –30 to +20 dBm (1mW to 100 mW)
EIP Microwave, Inc. Models 538B, 548B, or 578B, with Cable Kit: Option 590 and External Mixer:
Option 91 (26.5 to 40 GHz) Option 92 (40 to 60 GHz) Option 93 (60 to 90 GHz)
Anritsu Models ML2437Aor ML2438A, with Power Sensors:
MA2474A (0.01 to 40GHz) MA2475A (0.01 to 50GHz)
-
-
Oscilloscope Bandwidth: DC to 150 MHz
Vertical Sensitivity: 2 mV/
division Horiz Sensitivity: 50 ns/ division
Tektronix, Inc.Model TAS485
1-8 693XXB OM

Chapter 2 Installation

Table of Contents
2-1 INTRODUCTION ...................2-3
2-2 INITIAL INSPECTION ................2-3
2-3 PREPARATION FOR USE ..............2-4
Power Requirements...............2-4
Line Voltage Selection ..............2-4
Power Connection ................2-4
Standby Operation................2-5
Warmup Time ..................2-6
Operating Environment .............2-6
2-4 GPIB SETUP AND INTERCONNECTION .....2-7
Interface Connector ...............2-7
Cable Length Restrictions ............2-7
GPIB Interconnection ..............2-7
Setting the GPIB Address ............2-7
Selecting the Line Terminator ..........2-9
Selecting the Interface Language.........2-9
2-5 RACK MOUNTING KIT INSTALLATION .....2-10
Preliminary ..................2-10
Procedure ...................2-10
2-6 PREPARATION FOR STORAGE/SHIPMENT . . . 2-13
Preparation for Storage.............2-13
Preparation for Shipment............2-13
Chapter 2 Installation
2-1 INTRODUCTION This chapter provides installation instructions for the Series 693XXB
Synthesized High Performance Signal Generator. It includes informa tion on initial inspection, preparation for use, storage, and reship ment, and General Purpose Interface Bus (GPIB) setup and intercon nections.
WARNING
Use two or more people to lift and move this equipment, or use an equipment cart. There is a risk of back injury, if this equipment is lifted by one person.
2-2 INITIAL INSPECTION Inspect the shipping container for damage. If the shipping container or
cushioning material is damaged, retain until the contents of the ship­ment have been checked against the packing list and the signal gener­ator has been checked for mechanical and electrical operation.
If the shipment is incomplete or if the signal generator is damaged mechanically or electrically, notify your local sales representative or Anritsu Customer Service. If either the shipping container is damaged or the cushioning material shows signs of stress, notify the carrier as well as Anritsu. Keep the shipping materials for the carrier's inspec tion.
-
-
-
-
693XXB OM 2-3
PREPARATION
INSTALLATION FOR USE
2-3 PREPARATION FOR USE Preparation for use consists of checking that the rear panel line volt
age selector switch is set for the correct line voltage and connecting the signal generator to the power source. The following paragraphs provide these procedures along with information about power require ments, warmup times, and the operating environment.
Power Requirements
Before applying power, verify that the unit is set to match the available line voltage and that the installed fuse is of the correct type and rating.
Line Voltage Selection
The signal generator accepts 90 to 132 Vac and 180 to 264 Vac, 48 to 440 Hz, single-phase power. Power consumption is 400 VA maximum. The signal gener ator is intended for Installation Category (Overvolt age Category) II.
CAUTION
The line voltage selector switch on the rear panel can be set for either 110 Vac or 220 Vac operation (Figure 2-1). When the switch is set to 110 Vac, the 693XXB accepts 90 to 132 Vac line voltage. When the switch is set to 220 Vac, the 693XXB accepts 180 to 264 Vac line voltage. If the selector setting is in­correct for the line voltage available, change it to the correct setting.
-
-
-
-
Whenever the selector setting is changed, the line fuse must be changed to the correct value for the line voltage selected. Line fuse values for the line voltages are printed on the rear panel next to the fuse holder.
WARNING
When supplying power to this equipment, always use a three-wire power cable connected to a three-wire power line outlet. If power is supplied without grounding the equip ment in this manner, there is a risk of receiving a severe or fatal electric shock.
Power Connection
Connecting the 693XXB to line power automatically places it in operation (front panel OPERATE LED on). To connect it to the power source, plug the fe male end of the power cable into the input line volt age receptacle on the rear panel (Figure 2-1). Then plug the male end of the power cord into a three­wire power line outlet.
-
-
-
2-4 693XXB OM
PREPARATION
INSTALLATION FOR USE
Line Fuse
Line Voltage Selector Switch
GPIB
Connector
OPERATE
LINE
STANDBY
LEVEL
CONTROL
MODULATION
SYSTEM
Line Key
Figure 2-1. Signal Generator Rear Panel showing Power Connection
Standby Operation
Whenever the signal generator is not being used it should be left connected to the power source and placed in standby. This keeps the internal timebase frequency reference at operating temperature.
On the front panel, press LINE to switch the 693XXB from OPERATE (green LED on) to STANDBY (orange LED on).
NOTE
During standby operation, the fan runs continuously.
693XXB OM 2-5
PREPARATION
INSTALLATION FOR USE
Warmup Time
Operating Environment
From Standby–When placing the 693XXB in op eration from stand-by, allow 30 minutes warmup to assure stable operation.
From a Cold Start (0°C)–The signal generator re quires approximately 120 hours (5 days) of warm up to achieve specified frequency stability with aging.
NOTE
Instruments disconnected from AC power for more than 72 hours require 30 days to return to specified aging.
The 693XXB can be operated within the following environmental limits.
Temperature. 0°Cto50°C.
q
Humidity. 5 to 95% relative at 40°C.
q
Altitude. up to 4600 meters.
q
Cooling. Internal cooling is provided by forced
q
airflow from the fan mounted on the rear panel.
CAUTION
-
-
Before installing the 693XXB in its operating environment, ensure that all airflow passages at the sides and rear of the instrument are clear. This is of particular importance when­ever the unit is being rack-mounted.
Keep the cooling fan filter clean so that the ventilation holes are not obstructed. Ablocked fan filter can cause the instru ment to overheat and shut down.
-
2-6 693XXB OM
GPIB SETUP AND
INSTALLATION INTERCONNECTION
2-4 GPIB SETUPAND
INTERCONNECTION
The 693XXB provides automated microwave signal generation via the GPIB. The following paragraphs provide information about interface connections, cable requirements, setting the GPIB operating parame ters, and selecting the external interface language.
Interface Connector
Cable Length Restrictions
Interface between the signal generator and other devices on the GPIB is via a 24-wire interface cable. This cable uses connector shells having two connec tor faces. These double-faced connectors allow for the parallel connection of two or more cables to a single device. Figure 2-1 shows the location of the rear panel GPIB connector.
The GPIB can accommodate up to 15 instruments at any one time. To achieve design performance on the bus, proper timing and voltage level relationships must be maintained. If either the cable length be tween separate instruments or the cumulative cable length between all instruments is too long, the data and control lines cannot be driven properly and the system may fail to perform. Cable length restric­tions are as follows:
q
No more than 15 instruments may be installed on the bus.
q
Total cumulative cable length in meters may not exceed two times the number of bus instru­ments or 20 meters—whichever is less.
-
-
-
NOTE
For low EMI applications, the GPIB cable should be a fully shielded type, with well-grounded metal-shell connectors
GPIB Inter connection
Setting the GPIB Address
-
The only interconnection required for GPIB opera tion is between the signal generator and the control ler. This interconnection is via a standard GPIB cable. The Anritsu Part number for such a cable is 2000-1, -2, or -4 (1, 2, or 4 meters in length).
The default GPIB address is 5. If a different GPIB address is desired, it can be set from the front panel using the Configure GPIB Menu.
To change the GPIB address, first press the front panel main menu key labeled SYSTEM . The Sys tem Menu (shown on the following page) is dis played.
-
-
-
693XXB OM 2-7
-
GPIB SETUP AND
INSTALLATION INTERCONNECTION
Now press the menu soft-key Config . The System Configuration Menu (below) is displayed.
To go to the Configure GPIB menu from this menu, press the menu soft-key GPIB . The Configure GPIB Menu (below) is displayed.
Press the menu soft-key GPIB Address to change the current GPIB address of the signal generator. Enter a new address using the cursor control key or the data entry keypad and the terminator key
Hz
ns
ADRS
The new GPIB address will now appear on the dis play. The entry must be between 1 and 30 to be rec ognized as a valid GPIB address.
-
-
2-8 693XXB OM
GPIB SETUP AND
INSTALLATION INTERCONNECTION
Selecting the Line Terminator
Selecting the Interface Language
Data is delimited on the GPIB by either the carriage return (CR) ASCII character or both the carriage re turn and line feed (CR/LF) ASCII characters. Which character is used depends upon the requirements of the system controller. Most modern controllers can use either CR or CR/LF, while many older control lers require one or the other. Consult the controller's manual for its particular requirements.
From the Configure GPIB Menu display, you can se lect which GPIB terminator to use by pressing the menu soft-key Line Term . This menu soft-key tog gles the GPIB terminator between CR and CR/LF. The current selection appears on the display.
Series 693XXB Synthesized High Performance Sig nal Generators can be remotely operated via the GPIB using one of two external interface languages —Native or SCPI (Option 19). The Native interface language uses a set of 693XXB GPIB Product Spe­cific commands to control the instrument; the SCPI interface language uses a set of the Standard Com­mands for Programmable Instruments commands to control the unit.
-
-
-
-
-
The Configure GPIB Menu has additional menu dis­plays. For instruments with Option 19, selection of which external interface language is to be used is made from the first additional menu. From the Con figure GPIB Menu display, you can access the first additional menu by pressing More . The First Addi tional Configure GPIB Menu (below) is displayed.
Press Native/SCPI to select the external interface language to be used. This menu soft-key toggles the language selection between Native and SCPI. The current selection appears on the display.
-
-
693XXB OM 2-9
RACK MOUNTING KIT
INSTALLATION INSTALLATION
2-5 RACK MOUNTING KIT
INSTALLATION
The rack mounting kit (Option 1) contains a set of track slides (90° tilt capability), mounting ears, and front panel handles for mounting the signal generator in a standard equipment rack. The following proce dure provides instructions for installing the rack mounting hardware on to the instrument. Refer to Figures 2-2 and 2-3 during this proce dure.
Preliminary Disconnect the power cord and any other cables
from the instrument.
Procedure Install the rack mounting hardware as follows:
Step 1 Using a Phillips screwdriver, remove the
screws and the front handle assemblies from the instrument. (For instruments not having front handles, remove the screws and the front top and bottom feet from the instrument.) Retain the screws.
Step 2 Remove the four feet from the rear of the
instrument. Retain the screws.
Step 3 Remove the screws and the carrying han-
dle from the side handle cover. (The two screws fastening the carrying handle through the side handle cover to the chas­sis are accessable by lifting up the rubber covering at each end of the handle.)
-
-
Figure 2-2. Front Handle, Feet, and Carrying Handle Removal
2-10 693XXB OM
RACK MOUNTING KIT
INSTALLATION INSTALLATION
Step 4 Remove the inner slide assemblies from
the outer slide assemblies.
Step 5 Place the left side inner slide assembly
onto the instrument case with the handle towards the front of the instrument (Fig
NOTE
The screws with green heads have metric threads. When it becomes necessary to replace any of these screws, always use the exact re placement green-headed screws (Anritsu P/N 2000-560) to avoid damage to the instrument.
Step 6 Insert two green-headed screws through
­Step 7 Insert two green-headed screws through
ure 2-3).
the holes in the slide assembly behind the handle and into the metric tapped holes in the side of the instrument.
the holes near the rear of the slide assem bly and into the metric tapped holes in the side of the instrument.
-
-
Step 8 Insert the two SAE threaded screws (re
moved from the feet) through the 90° tabs on the rear of the slide assembly and into the rear panel of the instrument.
Step 9 Using the Phillips screwdriver, tighten all
screws holding the left side slide assem­bly to the instrument chassis.
-
Figure 2-3. Rack Mounting Hardware Installation
693XXB OM 2-11
RACK MOUNTING KIT
INSTALLATION INSTALLATION
Step 10 Place the right side inner slide assembly
onto the instrument case with the handle towards the front of the instrument.
Step 11 Insert two green-headed screws through
the holes in the slide assembly behind the handle and into the metric tapped holes in the side of the instrument.
Step 12 Insert two green-headed screws through
the holes near the rear of the slide assem bly and into the metric tapped holes in the side of the instrument.
-
Step 13 Insert the two SAE threaded screws (re
moved from the feet) through the 90° tabs on the rear of the slide assembly and into the rear panel of the instrument.
Step 14 Using the Phillips screwdriver, tighten all
screws holding the right side slide assem­bly to the instrument chassis.
Step 15 With the appropriate hardware, install
the outer slide assemblies onto the equip­ment rack.
Step 16 Lift the signal generator into position.
Align the inner and outer slide assem­blies and slide the instrument into the rack. Realign the hardware as needed for smooth operation.
WARNING
Use two or more people to lift and move this equipment, or use an equipment cart. There is a risk of back injury, if this equipment is lifted by one person.
-
2-12 693XXB OM
Loading...
+ 234 hidden pages