NOTE TO INSTALLER: Please give this manual to the customer after installation.
To learn more about American Standard Selectronic® Products visit our website at: www.americanstandard-us.com
or e-mail us at: CRTTEAM@americanstandard.com
For Parts, Service, Warranty or other Assistance,
please call (844) CRT-TEAM / (844) 278-8326 (In Canada: 1-800-387-0369)
(In Toronto Area only: 1-905-306-1093)
Thank you for selecting American-Standard...the benchmark of ne quality for over 100 years. To ensure that your
installation proceeds smoothly--please read these instructions carefully before you begin.
UNPACKING
Remove the Flush Valve items from the carton. The illustration below shows all items after they have been
removed from the carton. Some items may be packaged partially assembled to other items.
1. Installation Instructions
2. Flush Valve Body Assembly
3. Cover Plate with Sensor
4. Wall Box
5. Sweat Adapter
6. Stop Valve
7. Manual Override Hoses
LARGE PLATE CONCEALED TOILET FLUSH VALVES
4
Some Residual Water May Remain In The Valve During Shipping.
8a. Vacuum Breaker Flush Connection
(Top Spud)
8b. Vacuum Breaker Flush Connection
(Back Spud)
9. Safety Chain
POWER KITS — SOLD SEPARATELY
DO NOT REMOVE PROTECTIVE
FILM FROM SENSOR
EYE UNTIL INSTALLATION
IS COMPLETE.
NOTE TO INSTALLER: Please give this manual to the customer after installation.
NOTE TO INSTALLER: Please give this manual to the customer after installation.
To learn more about American Standard Selectronic® Products visit our website at:www.americanstandard-us.com
To learn more about American Standard Selectronic® Products visit our website at: www.americanstandard-us.comor e-mail us at:sensor@americanstandard.com
or e-mail us at: CRTTEAM@americanstandard.com
For Parts, Service,Warranty or other Assistance,
For Parts, Service, Warranty or other Assistance,
(855) 752-9259 (In Canada: 1-800-387-0369)
please call
please call (855) 752-9259 (In Canada: 1-800-387-0369)
5
2
VACUUM BREAKER FLUSH CONNECTIONS
606X.4XX 606X.5XX
8a8b
Multi-AC
Power Kit
PK00.MAC
CR-P2 Battery
Power Kit
2
M965643 Rev. 1.8 (11/17)
Fig. 1Roughing-in Dimensions
404 mm
(15-7/8")
SENSOR
OVERRIDE
BUTTON
280 mm
(11 ")
389 mm x 265 mm
(15-5/16" X 10-3/8")
ROUGH OPENING FOR BOX
25 mm (1") MAX.
WALL THICKNESS
FINISHED WALL
15˚
15˚
DETECTION ZONE
400 mm-800 mm
(Factory Setting: 400 mm)
GENERAL DESCRIPTION:
SELECTRONIC® PROXIMITY URINAL
FLUSH VALVE
Concealed Flushometer for 3/4"
Spud Fixtures
CAUTION: Use only American Standard
supplied transformers and cable sets.
Using non-AS supplied cables, or cutting,
splicing or modifying any components will
void the warranty.
SUPPLY
SUPPLY
(3/4) NPT.
(3/4") NPT.
-C-L-
-C-L-
108 mm-134 mm
*
*
-C-L-
152 mm
") MIN.
(6
(4-1/4" TO 5-1/4")
TOP OF
FIXTURE
(1-1/4
32 mm
") DIA.
*Note: The Critical Line (-C-L-) on Vacuum
Breaker must typically be 6
above fixture. Consult Codes for details.
" (152mm) min.
RECOMMENDED TOOLS; Fig. 2.
1. Teon Tape
2. Flat Blade Screwdriver
3. Adjustable Wrench
4. Tape Measure
5. Hacksaw
6. Tubing Cutter
7. File
8. For Sweat Connection; Solder and Torch
9. 2.5mm Hex Wrench
10. 1.5mm Hex Wrench
203 mm MAX.
(8") MAX.
Fig. 2
TOP SPUD
FIXTURES
176mm MAX.
") MAX.
(6-15/16
63 mm
(2-1/2") DIA.
120 mm MAX.
(4-3/4") MAX.
TOP OF
FIXTURE
FOR LOCATION OF INLET SUPPLY
ON BACK INLET FIXTURES AND CORRECT
HEIGHT FROM FINISHED FLOOR,
REFER TO FIXTURE INSTRUCTION SHEET.
1
2
10'
4
5
7910
BACK SPUD
FIXTURES
203 mm MAX.
(8
") MAX.
6
3
(6-15/16") MAX.
TOP OF
FIXTURE
32 mm
(1-1/4") DIA.
176 mm MAX.
*
*
152 mm
(6") MIN.
8
-C-L-
PRIOR TO INSTALLATION
Note: Prior to installing the Selectronic™Flush
Valve the following items must be installed.
1. Urinal
2. Drain line
3. Water supply line
IMPORTANT:
• All plumbing and electrical wiring should be
installed in accordance with applicable codes
and regulations.
• The use of water hammer arrestors is strongly
recommended for commercial applications. All piping
behind the walls should be properly secured and
fastened.
• Wate r supply lines must be sized to provide an
adequate volume of water for each xture.
• Flush all water lines prior to operation (see Step 3).
Dirt and debris can cause ush valve to run continuously.
• With the exception of Stop Valve Inlet, DO NOT
use pipe sealant or plumbing grease on any
valve component or coupling!
• Protect the chrome or special nish on the Flushometer.
DO NOT USE toothed tools on nished surfaces to install
or service these valves. Also see “Care and Cleaning”
section of this manual.
• This product contains mechanical and/or electrical
components that are subject to normal wear. These
components should be checked on a regular basis and
replaced as needed to maintain the valve’s performance.
3
M965643 Rev. 1.8 (11/17)
FLUSH VALVE INSTALLATION
INSTALL ELECTRICAL BOX; Fig. 3
1
1. Frame out a 389mm x 265mm (15-5/4" X 10-3/8") rough
opening in wall for the WALL BOX (1) at the dimension
shown.
2. Fasten one end of the SAFETY CHAIN (2) and CLIP
(4) to the WALL BOX (1) with NUT & SCREW (3) provided.
3. Install the WALL BOX (1) into rough opening in the wall
Level and secure the WALL BOX (1) to the wall opening
with screws.
Important: Front face of WALL BOX (1) should be ush
with nished wall.
4. Cut a 2” hole for outlet pipe to xture at dimension shown.*
Fig. 3 (TOP SPUD FIXTURE ILLUSTRATED)
265mm
(10-3/8")
176mm MAX.
(6-15/16) MAX.
120mm MAX.
(4-3/4) MAX.
389mm
(15-5/16")
1
ROUGH OPENING IN WALL
LEVEL
4
*FOR HOLE LOCATION OF
SUPPLY ON BACK INLET
FIXTURES, REFER TO FIXTURE
BEING INSTALLED FOR CORRECT
HEIGHT FROM FINISHED FLOOR
3
2
2
INSTALL SWEAT ADAPTER; Fig. 4
CAUTION
Turn water supplies off before
beginning
Note: Stop Valve inlet is 3/4" NPT. For optional sweat
connection, install Sweat Adapter (1) (Supplied) for 3/4"
copper pipe supply line.
1. Clean the end of the supply pipe. Push the threaded
SWEAT ADAPTER (1) until it is seated against the
internal stop. Sweat the ADAPTER (1) to the pipe.
2. Install the STOP VALVE (2) to the water supply line
with the outlet positioned as required (Behind the Wall).
3. Support piping as required.
3
FLUSH OUT SUPPLY LINES; Fig. 5
1. Open STOP VALVE (1).
2. Tur n on water supply to ush line of any debris or
sediment.
3. Close STOP VALVE (1) and turn off water supply line.
Fig. 4
Fig. 5
115mm-134mm
(4-1/2 TO 5-1/4)
STOP VALVE OUTLET
COUNTER-CLOCKWISE
OPENS STOP VALVE
1
FILE
EDGES
2
STOP VALVE
(3/4"NPT)
CLEAN & SOLDER
TO ADAPTER (1)
CLOCKWISE CLOSES
STOP VALVE
1
4
M965643 Rev. 1.8 (11/17)