CAUTION: Use only American Standard supplied
transformers and cable sets. Using non-AS supplied
cables, or cutting, splicing or modifying any components
NOTE TO INSTALLER: Please give this manual to the customer after installation.
To learn more about American Standard Selectronic® Products visit our website at: www.americanstandard-us.com
or e-mail us at: CRTTEAM@americanstandard.com
For Parts, Service, Warranty or other Assistance,
please call (844) CRT-TEAM / (844) 278-8326 (In Canada: 1-800-387-0369)
(In Toronto Area only: 1-905-306-1093)
Thank you for selecting American-Standard...the benchmark of ne quality for over 100 years. To ensure that your
installation proceeds smoothly--please read these instructions carefully before you begin.
UNPACKING
Remove the Flush Valve items from the carton. The illustration below shows all items after they have been
removed from the carton. Some items may be packaged partially assembled to other items.
1. Installation Instructions
2. Flush Valve Body Assembly
3. Cover Plate with Sensor
4. Electrical Box
5. Sweat Adapter
6. Stop Valve
7. Manual Override Hoses
Some Residual Water May Remain In The Valve During Shipping.
8a. Vacuum Breaker Flush Connection
(Exposed Back Spud)
8b. Vacuum Breaker Flush Connection
(Concealed Back Spud)
8c. Vacuum Breaker Flush Connection
(Top Soud)
POWER KITS — SOLD SEPARATELY
All American Standard Products Are Water Tested At Our Factory.
4
TOP
DO NOT REMOVE PROTECTIVE
FILM FROM SENSOR
EYE UNTIL INSTALLATION
IS COMPLETE.
transformers and cable sets. Using non-AS supplied
cables, or cutting, splicing or modifying any components
will void the warranty.
(In Toronto Area only: 1-905-306-1093)
8c8b8a
Multi-AC
Power Kit
CR-P2 Battery
Power Kit
6
5
Installation Instructions
NOTE TO INSTALLER: Please give this manual to the customer after installation.NOTE TO INSTALLER: Please give this manual to the customer after installation.
To learn more about American Standard Selectronic® Products visit our website at: www.americanstandard-us.com
or e-mail us at: CRTTEAM@americanstandard.com
For Parts, Service, Warranty or other Assistance,
please call (844) CRT-TEAM / (844) 278-8326 (In Canada: 1-800-387-0369)
606X.2X3
PK00.MAC
2
M965640 Rev. 1.4 (11/17)
Fig. 1
Roughing-in
Dimensions
160mm
(6-1/4)
160mm
(6-1/4)
SUPPLY
(1) NPT
-C-L--C-L-
108mm-134mm
*-C-L-
152mm MIN.
(6) MIN.
(4-1/4 TO 5-1/4)
OVERRIDE
BUTTON
SENSOR
TOP OF
FIXTURE
127mm X 127mm
(5X5 CUTOUT
FOR BOX)
51mm
(2)
400mm MAX.
(15-3/4) MAX.
25mm (1) MAX.
WALL THICKNESS
FINISHED
WALL
TOP SPUD
TOILET
70mm
(2-3/4) DIA.
128mm MAX.
(5) MAX.
DETECTION ZONE
400mm-800mm
(Factory Setting: 400mm)
15˚
360mm MAX.
(14-3/16) MAX.
EXPOSED BACK
SPUD TOILET
GENERAL DESCRIPTION:
SELECTRONIC® PROXIMITY TOILET
FLUSH VALVE
Concealed Flushometer for 1-1/2"
Top Spud Fixtures
CAUTION: Use only American Standard
supplied transformers and cable sets.
Using non-AS supplied cables, or cutting,
splicing or modifying any components will
void the warranty.
FOR LOCATION OF INLET SUPPLY ON BACK INLET
FIXTURES AND CORRECT HEIGHT FROM FINISHED FLOOR,
REFER TO FIXTURE INSTRUCTION SHEET.
CONCEALED BACK
SPUD TOILET
*-C-L-
TOP OF
FIXTURE
152mm MIN.
(6) MIN.
240mm MAX.
(9-1/2) MAX.
450mm MAX.
(17-3/4) MAX.
TOP OF
FIXTURE
*Note: The Critical Line (-C-L-) on Vacuum
Breaker must typically be 6
above fixture. Consult Codes for details.
" (152mm) min.
RECOMMENDED TOOLS; Fig. 2.
1. Teon Tape
2. Flat Blade Screwdriver
3. Adjustable Wrench
4. Tape Measure
5. Hacksaw
6. Tubing Cutter
7. File
8. For Sweat Connection; Solder and Torch
9. 2.5mm Hex Wrench
10. 1.5mm Hex Wrench
PRIOR TO INSTALLATION
Note: Prior to installing the Selectronic™Flush
Valve the following items must be installed.
1. Toilet
2. Drain line
3. Water supply line
IMPORTANT:
• All plumbing and electrical wiring should be
installed in accordance with applicable codes
and regulations.
• The use of water hammer arrestors is strongly
recommended for commercial applications. All piping
behind the walls should be properly secured and
fastened.
• Water supply lines must be sized to provide an
adequate volume of water for each xture.
51mm
(2)
FINISHED
FLOOR
51mm
(2)
FINISHED
FLOOR
Fig. 2
1
2
10'
4
3
6
5
7910
• Flush all water lines prior to operation (See Step 3).
Dirt and debris can cause ush valve to run continuously.
• With the exception of Stop Valve Inlet, DO NOT
use pipe sealant or plumbing grease on any
valve component or coupling!
• Protect the chrome or special nish on the Flushometer.
DO NOT USE toothed tools on nished surfaces to install
or service these valves. Also see “Care and Cleaning”
section of this manual.
• This product contains mechanical and/or electrical
components that are subject to normal wear. These
components should be checked on a regular basis and
replaced as needed to maintain the valve’s performance.
8
FINISHED
FLOOR
3
M965640 Rev. 1.4 (11/17)
FLUSH VALVE INSTALLATION
INSTALL ELECTRICAL BOX; Fig. 3
1
1. Cut a 127x127mm (5"x 5") opening in nished wall for ELECTRICAL BOX (1) at the dimension shown.
Fig.3 (TOP SPUD FIXTURE ILLUSTRATED)
2
TOP
3
127mm
(5)
127mm
(5)
2. Rotate the 4 MOUNTING TABS (2) at against the
electrical box. Holding the MOUNTING TABS (2) in
position, install the ELECTRICAL BOX (1) into the
opening. Make sure the MOUNTING TABS (2) are
behind the wall.
3. Tighten the 4 MOUNTING SCREWS (3) until the
ELECTRICAL BOX (1) is almost secure in the wall.
Before tighting fully, rest a level at the top edge of the
ELECTRICAL BOX (1) and make sure the box is level.
4. Cut a 2" diameter hole for outlet pipe at dimension
shown.*
2
INSTALL SWEAT ADAPTER; Fig. 4
CAUTION
Turn water supplies off before
beginning
Note: Stop Valve inlet is 1" NPT. For optional sweat
connection, install Sweat Adapter (1) (Supplied) for 1"
copper pipe supply line.
1. Clean the end of the supply pipe. Push the threaded
SWEAT ADAPTER (1) until it is seated against the
internal stop. Sweat the ADAPTER (1) to the pipe.
360mm MAX.
(14-3/16) MAX.
128mm MAX.
(5) MAX.
Fig. 4
115mm-134mm
(4-1/2 TO 5-1/4)
STOP
VALVE
OUTLET
TOP
1
*FOR HOLE LOCATION OF
OUTLET PIPE ON BACK INLET
FIXTURES, REFER TO FIXTURE
BEING INSTALLED FOR CORRECT
HEIGHT FROM FINISHED FLOOR
TOP
2
1
FILE
EDGES
STOP VALVE
(1" NPT)
CLEAN & SOLDER
TO ADAPTER (1)
2
2. Install the STOP VALVE (2) to the water supply line
with the outlet positioned as required (Behind the Wall).
3. Support piping as required.
3
FLUSH OUT SUPPLY LINES; Fig. 5
1. Open STOP VALVE (1).
2. Tur n on water supply line to ush line of any debris or
sediment.
3. Close STOP VALVE (1) and turn off water supply line.
Fig. 5
COUNTER-CLOCKWISE
OPENS STOP VALVE
CLOCKWISE CLOSES
STOP VALVE
1
4
M965640 Rev. 1.4 (11/17)
Loading...
+ 8 hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.