American Standard 606B.111, 606B.121, 606B.161, 606B.721, 606B.761 Installation Manual

SELECTRONIC
®
EXPOSED TOILET FLUSH VALVE AC POWERED PROXIMITY
1.1, 1.28, 1.6,
1.6/1.1 & 1.28/1.1 GPF
MODEL NUMBERS
606B.111 606B.121 606B.161 606B.721 606B.761
COVER PLATE
(Required for Front Installation Only)
Exposed Flush Valve for 1-1/2" Top Spud Bowls
CAUTION: Use only American Standard supplied
transformers and cable sets. Using non-AS supplied cables, or cutting, splicing or modifying any components will void the warranty.
Certied to comply with ASME A112.19.2
© 2016 AS America, Inc.
Installation Instructions
NOTE TO INSTALLER: Please give this manual to the customer after installation.
To learn more about American Standard Selectronic® Products visit our website at: www.americanstandard-us.com or e-mail us at: CRTTEAM@americanstandard.com
For Parts, Service, Warranty or other Assistance, please call (844) CRT-TEAM / (844) 278-8326 (In Canada: 1-800-387-0369) (In Toronto Area only: 1-905-306-1093)
© 2016 AS America Inc.
1
M965644 EN REV. 1.6 (12/16)
Thank you for selecting American-Standard...the benchmark of ne quality for over 100 years. To ensure that your installation proceeds smoothly--please read these instructions carefully before you begin.
UNPACKING
Remove the Flush Valve items from the carton. The illustration below shows all items after they have been removed from the carton. Some items may be packaged partially assembled to other items.
1. Installation Instructions
2. Flush Valve Body Assembly
3. Vacuum Breaker Tube
4. Spud Coupling Nut and Washers
5. Spud Flange
6. Wall Escutcheon
7. Cover Tube
Some Residual Water May Remain In The Valve During Shipping.
8. Sweat Adapter
9. Stop Valve
CARE INSTRUCTIONS:
DO: CLEAN THE PRODUCT WITH CLEAR WATER, DRY WITH A SOFT COTTON FLANNEL CLOTH.
DO NOT: DO NOT CLEAN THE PRODUCT WITH SOAPS, ACID, POLISH, ABRASIVES, HARSH CLEANERS,
OR A CLOTH WITH A COARSE SURFACE.
All American Standard Products Are Water Tested At Our Factory.
DO NOT REMOVE PROTECTIVE FILM FROM SENSOR EYE UNTIL INSTALLATION IS COMPLETE.
2
COVER PLATE
(Required For
Front Installation
Only)
7
8
6
POWER KIT - SOLD SEPARATELY
Hard-Wire AC
Power Kit
1
®
6067.111 6067.121 6067.161 6067.721 6067.761
6068.111 6068.121 6068.161 6068.721 6068.761
COVER PLATE
(Required for Front Installation Only)
Exposed Flushometer for 1-1/2" Top Spud Bowls
CAUTION: Use only American Standard supplied
transformers and cable sets. Using non-AS supplied cables, or cutting, splicing or modifying any components will void the warranty.
(In Toronto Area only: 1-905-306-1093)
MODEL NUMBERS
SELECTRONIC
EXPOSED TOILET FLUSH VALVE AC POWERED PROXIMITY
1.1, 1.28, 1.6,
1.6/1.1 & 1.28/1.1 GPF
3
© 2015 AS America, Inc.
Installa tion Instructions
NOTE TO INSTALLER: Please give this manual to the customer after installation.
To learn more about American Standard Selectronic® Products visit our website at: www.americanstandard-us.com or e-mail us at: CRTTEAM@americanstandard.com
For Parts, Service, Warranty or other Assistance, please call (844) CRT-TEAM / (844) 278-8326 (In Canada: 1-800-387-0369)
(PK00.HAC)
9
Multi-AC
Power Kit
(PK00.MAC)
4
5
2
M965644 EN REV. 1.6 (12/16)
Fig. 1
Roughing-in Dimensions (Front Installation Shown)
Right or Left Hand Installation
See (Section 5) for converting Flush Valve to Left Hand Installation.
73 mm
(2-7/8")
120 mm
MANUAL
OVERRIDE
BUTTON
292 mm (11-1/2")
*Note: The Critical Line (-C-L-) on Vacuum Breaker must typically be 6
fixture. Consult Codes for details.
(4-3/4")
*-C-L-
152 mm MIN.
(6") MIN.
-C-L-
" (152 mm) above
SEE DETAIL “A”
305 mm MAX.
(12" MAX.)
108 - 134 mm (4-1/4" – 5-1/4")
TOP OF FIXTURE
51 mm (2") HOLE
FOR CONDUIT
86 mm (3-3/8)
(1" NPT)
412 mm
(16-3/16")
FINISHED WALL
DETECTION ZONE: 400 - 800 mm (15-3/4" – 31-1/2")
(FACTORY SETTING: 600 mm (23-5/8")
170 mm MAX. (6-11/16") MAX.
GENERAL DESCRIPTION:
SELECTRONIC® PROXIMITY TOILET FLUSH VALVE for 1-1/2" Top Spud Fixtures
CAUTION: Use only American Standard supplied transformers and cable sets. Using non-AS supplied cables, or cutting, splicing or modifying any components will void the warranty.
15˚
4" (102 mm) SQ. BOX DEVICE COVER (PLASTER RING).
3/4" (19 mm) HIGH Hubbel-RACO #779 OR EQUAL
NOTE: INSTALL PLASTER RING SO THAT SCREW
HOLES ARE ON THE LEFT AND RIGHT SIDE OF BOX.
4" (102 mm) SQ. x 3-1/2" (89 mm) DEEP ELECTRICAL BOX
Hubbel-RACO #256 OR EQUAL (BY CONTRACTOR).
(BY CONTRACTOR).
FINISHED TILE WALL
DETAIL “A”
FINISHED PLASTER WALL
RECOMMENDED TOOLS; Fig. 2.
1. Teon Tape
2. Flat Blade Screwdriver
3. Adjustable Wrench
4. Tape Measure
5. Hacksaw
6. Tubing Cutter
7. File
8. For Sweat Connection; Solder and Torch
9. 2.5 mm Hex Wrench
10. 1.5 mm Hex Wrench
PRIOR TO INSTALLATION
Note: Prior to installing the Selectronic™Flush Valve the following items must be installed.
1. Toilet
2. Drain line
3. Water supply line
IMPORTANT:
All plumbing and electrical wiring should be installed in accordance with applicable codes and regulations.
• The use of water hammer arrestors is strongly recommended for commercial applications. All piping
behind the walls should be properly secured and fastened.
• Water supply lines must be sized to provide an
adequate volume of water for each xture.
Fig. 2
1
2
10'
4
3
6
5
8
7 9 10
• Flush all water lines prior to operation. Dirt and debris can cause ush valve to run continuously.
With the exception of Stop Valve Inlet, DO NOT use pipe sealant or plumbing grease on any valve component or coupling!
Protect the chrome or special nish on the Flushometer. DO NOT USE toothed tools on nished surfaces to install or service these valves. Also see “Care and Cleaning” section of this manual.
This product contains mechanical and/or electrical components that are subject to normal wear. These components should be checked on a regular basis and replaced as needed to maintain the valve’s performance.
3
M965644 EN REV. 1.6 (12/16)
1-1/2" TOP SPUD
FLUSH VALVE INSTALLATION
INSTALL SWEAT ADAPTER; Fig. 3
1
CAUTION
Note: Install Optional Sweat Adapter (Supplied) for copper pipe supply line.
1. Measure the distance (A) from the nished wall to the center of the inlet spud on the xture.
2. Cut the supply pipe 1-1/4" (A-B=C) shorter than the
measurement taken in Step 1. File any rough edges off the end of the supply pipe.
3. Clean the end of the supply pipe. Push the threaded
Adapter until it is seated against the internal stop. Sweat the Adapter to the pipe.
Turn water supplies off before beginning
Fig.3
FINISHED WALL
A
(A-B)=
C
FILE EDGES
CLEAN
ADAPTER
SOLDER ADAPTER
B
CENTER LINE OF FIXTURE SPUD
32mm (1-1/4")
2
INSTALL COVER TUBE, WALL
ESCUTCHEON and STOP VALVE; Fig. 4
1. Measure from nished wall to rst thread of Adapter
or threaded supply pipe (dimension “X”). Cut COVER TUBE (1) to length (X). Apply Teon Tape to the threaded end of the Adapter or supply pipe.
2. Push WALL ESCUTCHEON (2) onto the COVER TUBE (1).
Slide both onto the SUPPLY PIPE (3).
3. Push the COVER TUBE (1) in to expose the threads of
the supply pipe. With a wrench, thread the STOP VALVE (4)
onto the SUPPLY PIPE (3). Align and tighten.
4. Pull COVER TUBE (1) against STOP VALVE (4) and
push WALL ESCUTCHEON (2) against nished wall.
3
INSTALL VACUUM BREAKER
TUBE; Fig. 5
1. Place the SPUD FLANGE (1) over the spud on
the Fixture.
Fig. 4
Fig. 5
FINISHED WALL
X
TEFLON TAPE
2
1
3
2
X
4
1
2. Place FRICTION WASHER (3) and SEAL WASHER
(4) inside SPUD COUPLING NUT (2) and thread onto Spud. Do not tighten fully.
3. Insert the VACUUM BREAKER TUBE (5) into the
SPUD COUPLING NUT (2) and push it down.
Note: If cutting VACUUM BREAKER TUBE (5) to size, note that Critical Line (C/L) on Vacuum Breaker must typically be 6" (152mm) above xture. Consult Code for details.
5
2
3
4
1
4
M965644 EN REV. 1.6 (12/16)
Loading...
+ 7 hidden pages