ADTRAN T1 CSU ACE Quick Start Guide

For more detailed docum en tati on, visit us online at www.adtran.com
TSU CSU ACE P/N 1202022L1
T1
CPE T1 Device
12-48V- - -
350 mA
PWR
T1
ETWORK CONNECTION PINOUT
N
Network
Pin Name Description
1 R1 RXDATA Receive data from the Network - Ring 2 T1 RXDATA Receive data from the Network - Tip 3, 6, 7, 8 UNUSED n/a 4 R TXDATA Transmit data towards the Network -
Ring
5 T TXDATA Transmit data towards the Network - Tip
CPE C
ONNECTION PINOUT
Pin Name Description
1 R TXDATA Transmit data towards the Network -
Ring 2 T TXDATA Transmit data towards the Network - Tip 3, 6, 7, 8 UNUSED n/a 4 R1 RXDATA Receive data from the Network - Ring 5 T1 RXDATA Receive data from the Network - Tip
NSTALLATION INFORMATION
I
An eight-position modu lar ja ck (labe led N
ETWORK
) is provided to connect to the ne twork T1 circuit. The pinout is provided on this Quick Start Guide. See
Chapter 2, Installa tion
,of the TSU User Manual for more information. An eight-position modular jack (labeled CPE) is provided to connect to the customer equipment. The pinout is provided on this Quick Start Guide. See
Chapter 2, Installati on
,of the TSU CSU
ACE User Manual for more information.
The rear panel contains LBO dip switches for both the Network and CPE interfaces. Detailed instructions on setting the switch positions are found on the back of this sheet.
The TSU CSU ACE can be powered by either of the following methods:
1. Use the included NEC Class 2, 12V at 400 mA wall mount power
supply.
2. Connect to a reliably grounded 12-48 Vdc source which is electrically
isolated from the AC source.
Note: The branch circuit overcurrent protection shall be a fuse or circuit breaker rat ed 48V, minimum to 10A, maximum.
Additional information can be found on the product CD which contains the TSU User Manual, FAQs, Data Sheets, Applications, and White Papers.
Quick Start Guide, 61202022L1-13A, September 2001 Technical Support 1-888-4ADTRAN (1-888-423-8726) Copyright 2001 ADTRAN, All Rights Reserved
TSU CSU ACE P/N 1202022L1
ETWORK
N
Position 1 Position 2 Attenuation (dB)
CPE LBO S
Position 3 Position 4 Position 5 Cable Length (feet)
Off Off On 0-133 On On Off 134-265 Off On Off 266-399 On Off Off 400-533 Off Off Off 534-655
LBO S
On On 0 On Off 7.5 Off On 15 Off Off 22.5
WITCH POSITION SETTINGS
WITCH POSITION SETTINGS
EST AND MONITOR ACCESS
T
Two monitor jacks are provided on the rear panel for bridging the received signals to allow in service circuit monitoring.
Four break-and-test jacks are provided on the rear panel for use in out­of-service testing. Th ese jacks bypass the c onnections of the modular jacks. N output of the TSU CSU ACE. To test the CPE, a T1 Bit Error Rate Test (BERT) test set can be used to simulate the network. E can be used to simulate the CPE with a BERT test set, allowing the network to be tested. The TSU CSU ACE on the other end of the circuit can be looped back to test only the network.
ET IN
and N
ET OUT
are used to simulate the network inp ut and
and E
Q IN
Q OUT
Quick Start Guide, 61202022L1-13A, September 2001 Technical Support 1-888-4ADTRAN (1-888-423-8726) Copyright 2001 ADTRAN, All Rights Reserved