ZTE ZXMBW RA25 Installation Manual

ZXMBW RA25
Agile 2.5G Remote Radio Frequency Unit
Installation Manual
ZTE CORPORATION ZTE Plaza, Keji Road South, Hi-Tech Industrial Park, Nanshan District, Shenzhen, P. R. China 518057 Tel: (86) 755 26771900 800-9830-9830 Fax: (86) 755 26772236 URL: http://support.zte.com.cn E-mail: doc@zte.com.cn
LEGAL INFORMATION Copyright © 2006 ZTE CORPORATION. The contents of this document are protected by copyright laws and international treaties. Any reproduction or
distribution of this document or any portion of this document, in any form by any means, without the prior written consent of ZTE CORPORATION is prohibited. Additionally, the contents of this document are protected by contractual confidentiality obligations.
All company, brand and product names are trade or service marks, or registered trade or service marks, of ZTE CORPORATION or of their respective owners.
This document is provided “as is”, and all express, implied, or statutory warranties, representations or conditions are disclaimed, including without limitation any implied warranty of merchantability, fitness for a particular purpose, title or non-infringement. ZTE CORPORATION and its licensors shall not be liable for damages resulting from the use of or reliance on the information contained herein.
ZTE CORPORATION or its licensors may have current or pending intellectual property rights or applications covering the subject matter of this document. Except as expressly provided in any written license between ZTE CORPORATION and its licensee, the user of this document shall not acquire any license to the subject matter herein.
The contents of this document and all policies of ZTE CORPORATION, including without limitation policies related to support or training are subject to change without notice.
Revision History
Date Revision No. Serial No. Reason for Revision
09/27/2006 R1.0 Sjzl20061645 First edition
ZTE CORPORATION Values Your Comments & Suggestions!
Your opinion is of great value and will help us improve the quality of our product documentation and offer better services to our customers.
Please fax to: (86) 755-26772236; or mail to Documentation R&D Department, ZTE CORPORATION, ZTE Plaza, A Wing, Keji Road South, Hi-Tech Industrial Park, Shenzhen, P. R. China 518057.
Thank you for your cooperation!
Document Name
Product Version V2.00
Equipment Installation Date
Your evaluation of this documentation
Your suggestions for improvement of this documentation
ZXMBW RA25 Agile 2.5G Remote Radio Frequency Unit Installation Manual
Presentation:
(Introductions, Procedures, Illustrations, Completeness, Level of Detail, Organization, Appearance)
£ Good £ Fair £ Average £ Poor £ Bad £ N/A
Accessibility:
(Contents, Index, Headings, Numbering, Glossary) £ Good £ Fair £ Average £ Poor £ Bad £ N/A
Intelligibility:
(Language, Vocabulary, Readability & Clarity, Technical Accuracy, Content) £ Good £ Fair £ Average £ Poor £ Bad £ N/A
Please check the suggestions which you feel can improve this documentation:
£ Improve the overview/introduction £ Make it more concise/brief £ Improve the Contents £ Add more step-by-step procedures/tutorials £ Improve the organization £ Add more troubleshooting information £ Include more figures £ Make it less technical £ Add more examples £ Add more/better quick reference aids £ Add more detail £ Improve the index £ Other suggestions
__________________________________________________________________________ __________________________________________________________________________ __________________________________________________________________________ __________________________________________________________________________ __________________________________________________________________________ # Please feel free to write any comments on an attached sheet.
Document Revision Number
R1.0
If you wish to be contacted regarding your comments, please complete the following:
Name Company Postcode Address Telephone E-mail
This page is intentionally blank.
Contents
About this Manual ............................................................i
Purpose................................................................................. i
Intended Audience.................................................................. i
Prerequisite Skill and Knowledge............................................... i
What is in This Manual............................................................. i
Related Documentation........................................................... ii
Conventions..........................................................................iii
How to Get in Touch...............................................................iv
Chapter 1.........................................................................1
Overview .........................................................................1
Installation Flow ..............................................................2
Installation Components......................................................... 2
Hardware Installation Flow...................................................... 4
Installation Precautions ....................................................5
Chapter 2.........................................................................7
Installation Preparations ................................................7
Installation Environment Check .........................................8
Installation Location Check...................................................... 8
Temperature/Humidity Check.................................................. 8
Power Supply Check............................................................... 9
Grounding Check ...................................................................9
Other Checks ........................................................................ 9
Tools and Instruments Preparation................................... 10
Technical Documents Preparation .................................... 12
Unpacking Inspection ..................................................... 13
Wooden Case Unpacking Procedure........................................ 13
Carton Unpacking Procedure ................................................. 14
Goods Acceptance and Handover ........................................... 14
Chapter 3.......................................................................15
Chassis Installation.......................................................15
Pole Mounting ............................................................... 16
Support Component Installation.............................................16
Sunshade Component Installation ..........................................18
Chassis Body Installation.......................................................18
Wall Mounting ............................................................... 21
Support Component Installation.............................................21
Sunshade Component Installation ..........................................24
Chassis Body Installation.......................................................24
Chassis Mounting Check ................................................. 26
Chapter 4.......................................................................27
Power and Grounding Cables Installation ....................27
Power Cable Installation ................................................. 28
Power Cable Types ...............................................................28
Power Cables Installation Procedure .......................................30
Grounding Cable Installation ........................................... 31
Installation Requirements ............................................... 33
Chapter 5.......................................................................35
External Power Cables Installation...............................35
Chassis External Interfaces ............................................. 36
Optical Fiber Installation................................................. 37
External Monitoring Cable Installation............................... 39
Cable/Fiber Installation Requirements .............................. 40
Cable Installation Requirements.............................................40
Fiber Installation Requirements..............................................40
Chapter 6.......................................................................41
Main Antenna Feeder System Installation....................41
Installation Preparation .................................................. 42
Installation Personnel Preparation ..........................................42
Installation Environment Check..............................................42
Safety Measure Check...........................................................43
Installation Tools Preparation.................................................43
Antenna Feeder System Structure.................................... 45
Installation Flow ............................................................ 46
Antenna Installation....................................................... 47
Technical Parameters ........................................................... 47
Antenna Installation Flow...................................................... 48
Installation Location............................................................. 48
Antenna Handling and Hoisting.............................................. 49
Directional Antenna Installation............................................. 50
Omni Antenna Installation..................................................... 52
Jumper and Antenna Connection and Sealing .......................... 53
Feeder Installation......................................................... 54
Feeder Route Determination.................................................. 54
Main Feeder Connector Making .............................................. 55
Feeders Cutting ................................................................... 58
Main Feeder Hoisting............................................................ 59
Main Feeder Laying and Fixing............................................... 60
Feeder Grounding Clip Installation ......................................... 61
Chassis Jumper Installation................................................... 64
SWR Test............................................................................ 65
Water Proof Treatment................................................... 66
Chapter 7.......................................................................69
Hardware Installation Check ........................................69
Chassis Installation Check............................................... 70
Cable Installation Check ................................................. 71
Power and Grounding Cables................................................. 71
Optical Fibers ...................................................................... 72
1/2’’ Jumper........................................................................ 72
Main Feeder ........................................................................ 72
Antenna Feeder Installation Check................................... 74
Environment Check........................................................ 75
BTS Information ............................................................ 75
Chapter 8.......................................................................77
Power- On/Off...............................................................77
Power – on/off Procedures .............................................. 78
Power - on Check................................................................. 78
Power - on.......................................................................... 78
Power - off.......................................................................... 78
Appendix A ....................................................................79
Technical Indices...........................................................79
Physical Indices............................................................. 79
Power Supply Indices ..................................................... 80
Power Consumption Indices...................................................80
Abbreviations ................................................................81
Index.............................................................................83
Figures...........................................................................85
Tables............................................................................87
About this Manual
Purpose
This Manual provides procedures and guidelines that support the installation of the ZXMBW RA25 Agile 2.5G Remote Radio Frequency Unit.
Intended Audience
This document is intended for engineers and technicians who perform installation activities on the ZXMBW RA25 Agile 2.5G Remote Radio Frequency Unit.
Prerequisite Skill and Knowledge
To use this document effectively, users must have a general understanding of wireless telecommunications technology. Familiarity with the following is helpful:
n the ZXMBW system and its various components n user interfaces on the AGW n local operating procedures
What is in This Manual
This Manual contains the following chapters:
TABLE 1 CHAPTER SUMMARY
Chapter Summary
Chapter 1 Overview Describes the RA25 Agile 2.5 Remote
Radio Frequency Unit’s Installation flow and precautions
Chapter 2 Installation Preparations
Confidential and Proprietary Information of ZTE CORPORATION i
Describes the Installation environment check, Tools and Instruments preparation, Technical documents preparation, and
ZXMBW RA25 Agile 2.5G Remote Radio Frequency Unit Installation Manual
Chapter Summary
Unpacking check.
Chapter 3 Chassis Installation
Chapter 4 Power and Grounding Cables Installation
Chapter 5 External Power Cables Installation
Chapter 6 Main Antenna Feeder System Installation
Chapter 7 Hardware Installation Check
Chapter 8 Power­On/Off
Appendix A Technical Indices
Describes the Pole mounting installation method, Wall mounting installation method and Chassis mounting check.
Describes the Power cable installation, Grounding cable installation and Installation requirements.
Describes the Chassis external interfaces, Optical fiber installation, External monitoring cable installation and Cable/fiber installation requirements.
Describes the Installation preparation, Antenna feeder system structure, Installation flow, Antenna installation, Feeder installation and Water proof treatment.
Describes the Chassis installation check, cable installation check, Antenna feeder installation check, Environment check and BTS Information check.
Describes the Power- on/off procedures
Describes the RA25 Physical indices and Power supply indices.
Related Documentation
The following documentation is related to this manual:
n ZXMBW RA25 Agile 2.5G Remote Radio Frequency Unit
Guide to Documentation
n ZXMBW RA25 Agile 2.5G Remote Radio Frequency Unit
Technical Manual
n ZXMBW RA25 Agile 2.5G Remote Radio Frequency Unit
Hardware Manual
n ZXMBW RA25 Agile 2.5G Remote Radio Frequency Unit
Maintenance Manual
ii Confidential and Proprietary Information of ZTE CORPORATION
About this Manual
Conventions
ZTE documents employ the following typographical conventions.
Typographical Conventions
TABLE 2 TYPOGRAPHICAL CONVENTIONS
Typeface Meaning
Italics References to other Manuals and documents. “Quotes” Links on screens. Bold Menus, menu options, function names, input
fields, radio button names, check boxes, drop­down lists, dialog box names, window names.
CAPS Keys on the keyboard and buttons on screens
and company name.
Constant width
Text that you type, program code, files and
directory names, and function names. [ ] Optional parameters. { } Mandatory parameters. | Select one of the parameters that are delimited
by it.
Note: Provides additional information about a
certain topic.
Checkpoint: Indicates that a particular step needs
to be checked before proceeding further.
Tip: Indicates a suggestion or hint to make things
easier or more productive for the reader.
Mouse Operation Conventions
TABLE 3 MOUSE OPERATION CONVENTIONS
Typeface Meaning
Click Refers to clicking the primary mouse button (usually
the left mouse button) once.
Double-click Refers to quickly clicking the primary mouse button
(usually the left mouse button) twice.
Right-click Refers to clicking the secondary mouse button
(usually the right mouse button) once.
Drag Refers to pressing and holding a mouse button and
moving the mouse.
Confidential and Proprietary Information of ZTE CORPORATION iii
ZXMBW RA25 Agile 2.5G Remote Radio Frequency Unit Installation Manual
How to Get in Touch
The following sections provide information on how to obtain support for the documentation and the software.
Customer Support
If you have problems, questions, comments, or suggestions regarding your product, contact us by e-mail at support@zte.com.cn. You can also call our customer support center at (86) 755 26771900 and (86) 800-9830-9830.
Documentation Support
ZTE welcomes your comments and suggestions on the quality and usefulness of this document. For further questions, comments, or suggestions on the documentation, you can contact us by e-mail at doc@zte.com.cn; or you can fax your comments and suggestions to (86) 755 26772236. You can also browse our website at http://support.zte.com.cn, which contains various interesting subjects like documentation, knowledge base, forum and service request.
iv Confidential and Proprietary Information of ZTE CORPORATION
Chapter 1
Overview
This chapter explains:
n Installation flow n Installation precautions
Confidential and Proprietary Information of ZTE CORPORATION 1
ZXMBW RA25 Agile 2.5G Remote Radio Frequency Unit Installation Manual
Installation Flow
This section describes the RA25 components to be installed on site and the RA25 installation flow.
Installation Components
Figure 1 shows RA25 chassis overall installation schematic diagram and dimensions.
FIGURE 1 RA2 5 CHASSIS OVERALL INSTALLATION SCHEMATIC DIAGRAM
1
4
7
2
5
3
1 Sunshade 2 Chassis body 3 Base 4 Support 5 Name plate label 6 Chassis protection grounding terminal
7 RA25 label 8 Hinge
Figure 2 shows the operations to be performed on site.
6
Unit: mm
8
2 Confidential and Proprietary Information of ZTE CORPORATION
FIGURE 2 RA25 ON -SITE INSTALLATION OPERATION S CHEMATIC DIAGRAM
Chapter 1 Overview
You need to install the following components of the RA25:
1. RA25 chassis, including:
n Support n Chassis body n Internal cables n Module n Sunshade
Note: The cables and functional modules inside the chassis have already been installed before delivery. You only need to check whether their installations meet the requirements.
2. Power supply system
3. Grounding system
4. Main antenna feeder system, including:
n Antenna n Jumper n Main feeder
5. External cable
Confidential and Proprietary Information of ZTE CORPORATION 3
ZXMBW RA25 Agile 2.5G Remote Radio Frequency Unit Installation Manual
Hardware Installation Flow
Figure 3 shows the general installation flow of the RA25. However, you do not necessarily have to follow strictly this flow on site. Some steps can be performed at the same time, and an earlier or later step may be performed later or earlier, depending on whichever is more convenient on site.
FIGURE 3 RA25 INSTALLATION FLOW
4 Confidential and Proprietary Information of ZTE CORPORATION
Chapter 1 Overview
Installation Precautions
The installation personnel of the RA25 must check the running environment of the equipment and learn about the communication networking and data configuration of the operator, the status of the equipment in the network, the interfaces of the line transmission equipment, and the lengths of various cables prior to installation, for successful commissioning of the project. The hardware installation personnel must read carefully the installation manual before the installation.
In addition, pay attention to the following:
n Do not operate with the chassis or any module when it is
energized during the installation.
n Do not install the antenna feeder system in the case of
lightning.
n Verify the various lightning arresters (including the power
supply lightning arrester, RF lighting arrester, and main antenna feeder arrester) are in good contact and good condition. Replace any damaged ones.
n Lock the door in time after the chassis has been installed. If
any maintenance needs the door being opened, all operations must be performed under the guidance of professionals.
Confidential and Proprietary Information of ZTE CORPORATION 5
ZXMBW RA25 Agile 2.5G Remote Radio Frequency Unit Installation Manual
This page is intentionally blank.
6 Confidential and Proprietary Information of ZTE CORPORATION
Chapter 2
Installation Preparations
This chapter explains:
n Installation environment check n Tools and instruments preparation n Technical documents preparation n Unpacking inspection
Confidential and Proprietary Information of ZTE CORPORATION 7
ZXMBW RA25 Agile 2.5G Remote Radio Frequency Unit Installation Manual
Installation Environment Check
Prior to your installation of this equipment, check the installation environment in accordance with the requirements provided in the ZTE Environment Acceptance Report. The contents in this section are for reference only.
Installation Location Check
The installation location of the RA25 must meet the following requirements of engineering design:
n Stay away from the environment with heavy dust, poisonous
gases, and inflammables and explosives;
n Stay away from the places with great shock or strong noise. n Stay away from transformer substations; n Stay away from pollution sources; n Stay away from industrial boilers and heating boilers; n Stay away from large-power radio interference sources.
Temperature/Humidity Check
Table 4 lists the temperature/humidity requirements for the operation of the RA25.
TABLE 4 TEMPERATURE AND HUMIDITY REQUIREMENTS
Name Working Conditions
Temperature
Humidity
Operating temperature: - 40 °C ~ + 50 °C Storage temperature: -45 °C ~ +75 °C
Working humidity: 5% RH ~ 98% RH Storage humidity: 5% RH ~ 98% RH
8 Confidential and Proprietary Information of ZTE CORPORATION
Chapter 2 Installation Preparations
Power Supply Check
Table 5 lists the power supply requirements for the RA25 chassis.
TABLE 5 POWER SUPPLY REQUIREMENTS
Type Nominal Value Operating Range
AC
DC -48 V DC -40 V~-57 V
110 V AC 85 V AC~138 V AC 220 V AC 150 V AC~300 V AC
Grounding Check
The RA25 must use the joint grounding mode, with the grounding resistance less than 5 ohm.
Other Checks
n The support equipment or parts (for example, outdoor
cabling rack, antenna pole, iron tower, and grounding copper busbar) must comply with the engineering design requirements of the RA25;
n The equipment to be interconnected with the BBUA and
power equipment is ready.
Confidential and Proprietary Information of ZTE CORPORATION 9
ZXMBW RA25 Agile 2.5G Remote Radio Frequency Unit Installation Manual
Tools and Instruments Preparation
Make available the installation tools and test instruments, as listed in Table 6, and select the appropriate ones to use according to the project and on-site requirements.
TABLE 6 TOOLS LIST
Category Name
Feeder knife
Special-purpose tools
Coaxial cable stripper Coaxial crimping pliers Multi-functional crimping pliers
Drilling tools
General­purpose tools
Electrical percussion drill Several appropriate drill bits Dust cleaner Power connector board (with 2-phase, 3-phase
sockets) Cross screwdriver (4?, 6?, 8?)
Straight screwdriver (4?, 6?, 8?) Adjustable wrench (6", 8", 10", 12") Combination benches (17", 19") Socket wrench (one set) Claw hammer, 5 kg Electric iron, 300 W Electric iron, 40 W Solder wires Hot air blower Tin sucker Tweezers Paint brush Electric knife Paper cutter Scissors
Ribbon tape, 50 m
Measurement tools
Protection tools
Small tools Hacksaw (with several spare saw blades)
10 Confidential and Proprietary Information of ZTE CORPORATION
Steel tape, 5 m Horizontal ruler, 400m Angle instrument Plumb
Antistatic wrist strap Safety helmet, slip-proof glove, etc.
Chapter 2 Installation Preparations
Category Name
Sharp-nose pliers (8?) Diagonal pliers (8?) Carp-nose pliers (8?) Vice (8?) Needle file (medium-sized) Hydraulic crimper Pry
Pulley block Rope
Auxiliary tools
Ladder Forklift Crane
TABLE 7 INSTRUMENTS LIST
Instrument Name Manufacturer
VSWR tester SITE MASTER Optical fiber tester ­Compass ­Multimeter ­Earth resistance tester -
Note: No instruments can be used unless they are first found to be up to the standard in tests.
Confidential and Proprietary Information of ZTE CORPORATION 11
ZXMBW RA25 Agile 2.5G Remote Radio Frequency Unit Installation Manual
Technical Documents Preparation
Read and prepare the following manuals before installation.
n ZXMBW RA25 Agile 2.5G Remote Radio Frequency Unit
Technical Manual
n ZXMBW RA25 Agile 2.5G Remote Radio Frequency Unit
Hardware Manual
n ZXMBW RA25 Agile 2.5G Remote Radio Frequency Unit
Maintenance Manual
n ZXMBW RA25 Agile 2.5G Remote Radio Frequency Unit
Guide to Documentation
12 Confidential and Proprietary Information of ZTE CORPORATION
Chapter 2 Installation Preparations
Unpacking Inspection
The ZTE Engineers must perform the unpacking inspection along with operator’s side engineers.
1. Check whether the total pieces are correct, packages are in
good condition, and the destination location matches the installation location. If the results are all normal, start unpacking inspection.
2. The equipment inspection list and unpacking inspection
report are contained in package #1. First open the #1 package and take out the Unpacking Inspection Report. Check the total number of the goods against the inspection list and record it for filing.
3. If any item is missing, lack, incorrect, excessive or damaged,
the reason must be found out, and the engineering supervisor should fill in the Unpacking Inspection Feedback Table, which must be fed back to ZTE in time for handling.
Note: When the equipment is moved a hotter and damper place, wait for 30 minutes before unpacking the equipment. Otherwise, moisture may condense on the surface of the equipment and damage the equipment as a result.
Wooden Case Unpacking Procedure
1. Insert the screwdriver or claw hammer into the tab hole on
the cover plate of the wooden case, and turn the tab straight;
2. Lift and remove the cover plate after all tabs have been
turned straight;
3. Turn straight the tabs of the plates on four sides of the
wooden boxes, and remove the plates.
Confidential and Proprietary Information of ZTE CORPORATION 13
ZXMBW RA25 Agile 2.5G Remote Radio Frequency Unit Installation Manual
Carton Unpacking Procedure
1. Cut the straps by using the diagonal pliers;
2. Cut the adhesive tape along the slits on the cover by using a paper cutter. Note that the cut shall not be too deep to avoid damaging the goods inside;
3. Open the carton and take out the foam pads;
4. Check the contents in the carton against the attached delivery list.
Note: Do not damage the antistatic bags during the unpacking inspection process, as they may be useful in future storage of spare parts and return of failed parts.
Properly dispose of the desiccants to keep them away from children.
Goods Acceptance and Handover
1. Acceptance check
Check the goods carefully one by one for acceptance according to the names, models, and quantities shown on the packaging list:
n There must not be dents, bulges, scratches, peels, blithers,
blisters or stains on the outer surface of the chassis.
n The surface paint on the cabinet must not peel off or be
scratched.
n The fastening bolts must be tight, not fall off or be displaced; n The accessories and fittings needed for installation shall be
complete.
n Arrange the inspected goods in good order by category.
2. Handover
After inspection, the user representative and the engineering supervisor must sign on the Unpacking Inspection Report . In accordance with the contract, if the goods are to be kept by the equipment operator after inspection, the goods should be handed over to the equipment operator after both parties sign on the Unpacking Inspection Report.
14 Confidential and Proprietary Information of ZTE CORPORATION
Chapter 3
Chassis Installation
This chapter explains:
n Pole mounting n Wall mounting n Chassis mounting check
Confidential and Proprietary Information of ZTE CORPORATION 15
ZXMBW RA25 Agile 2.5G Remote Radio Frequency Unit Installation Manual
Depending on the installation environment, the RA25 chassis can be installed in two ways: pole mounting and wall mounting.
Pole Mounting
Figure 4 shows the installation flow for pole mounting of the chassis.
FIGURE 4 INSTALLATION FLOW - POLE MOUNTING
Support Component Installation
For installing the support component perform the following steps:
1. Take out the support component provided with the chassis.
Figure 5 shows the structure of this component;
16 Confidential and Proprietary Information of ZTE CORPORATION
FIGURE 5 SUPPORT COMPONENT SCHEMATIC DIAGRAM
Chapter 3 Chassis Installation
Top view Side view
2. Fasten the support component onto the pole by using the fastening plate and bolts, as shown in Figure 6. The façade of the equipment must face south and the back of the equipment with the radiator face north. (This applies to the Northern Hemisphere and the contrary to the Southern Hemisphere).
FIGURE 6 SUPPORT COMPONENT FASTENING ONTO THE POLE
3
1
2
4
5
6
Confidential and Proprietary Information of ZTE CORPORATION 17
ZXMBW RA25 Agile 2.5G Remote Radio Frequency Unit Installation Manual
1. Plain washer 2. Support 3. Bolt 4. M12 nut, spring washer, plain washer 5. Pole 6. Fastening plate
END OF STEPS
Note: The diameter of the post is usually 60 mm ~ 90 mm, with
75 mm recommended.
Sunshade Component Installation
As shown in Figure 7, fasten the sunshade onto the support with four M4 bolts.
FIGURE 7 SUNSHADE INSTALLED -POLE MOUNTING
Chassis Body Installation
For installing the chassis body, perform the following steps:
1. Lift the chassis body and hang the upper part of the chassis onto the support component, as shown in Figure 8;
18 Confidential and Proprietary Information of ZTE CORPORATION
Loading...
+ 69 hidden pages