COPYRIGHTS & TRADEMARKS: For complete copyright and trademark information, go to: www.zebra.
com/copyright
WARRANTY: For complete warranty information, go to: www.zebra.com/warranty
END USER LICENSE AGREEMENT: For complete EULA information, go to: www.zebra.com/eula
Terms of Use
Proprietary Statement This manual contains proprietary information of Zebra Technologies Corporation
and its subsidiaries (“Zebra Technologies”). It is intended solely for the information and use of parties
operating and maintaining the equipment described herein. Such proprietary information may not be used,
reproduced, or disclosed to any other parties for any other purpose without the express, written permission
of Zebra Technologies.
Product Improvements Continuous improvement of products is a policy of Zebra Technologies. All
specications and designs are subject to change without notice.
Liability Disclaimer Zebra Technologies takes steps to ensure that its published Engineering specications
and manuals are correct; however, errors do occur. Zebra Technologies reserves the right to correct any
such errors and disclaims liability resulting therefrom.
Limitation of Liability In no event shall Zebra Technologies or anyone else involved in the creation,
production, or delivery of the accompanying product (including hardware and software) be liable for any
damages whatsoever (including, without limitation, consequential damages including loss of business
prots, business interruption, or loss of business information) arising out of the use of, the results of use
of, or inability to use such product, even if Zebra Technologies has been advised of the possibility of such
damages. Some jurisdictions do not allow the exclusion or limitation of incidental or consequential damages,
so the above limitation or exclusion may not apply to you.
Included Hardware ........................................................................................................................................................... 1
Angle Iron Installation with Existing Bollard .....................................................................................................................3
Angle Iron Installation without Existing Bollards ..............................................................................................................4
Panel Installation with Angle Iron .....................................................................................................................................5
Panel Installation without Angle Iron and with Existing Bollard ........................................................................................6
Panel Installation without Angle Iron and without Existing Bollard ...................................................................................7
Panel Installation with Canting ......................................................................................................................................... 8
Bollard Installation without Angle Iron ..............................................................................................................................9
Bollard Installation with Angle Iron .................................................................................................................................10
Power Over Ethernet (PoE) Connection ........................................................................................................................ 13
Fast, reliable, highly automated updates. Used primarily at dock doors, these integrated portals can
reduce the need for human intervention and manual scanning at common chokepoints. Specialized
antennas tune out cross-talk, reducing erroneous reads and sustaining a highly accurate read rate
through the portal.
This document describes how to perform a typical installation of the Zebra Transition RFID Portal.
Included Hardware
Introduction
y3/8-inch x 3-inch Screw Anchor (Stands/Angle Iron)
y1/2-inch x 3-inch Screw Anchor (Bollards)
y#14 X 1-inch Metal Screws (Stack Light/Photo Eye)
y1/2-inch U-Shaped Wall Stays
y1/4-inch Concrete/Drywall Anchors (Wall Stays)
ySmall/Large Zip-Ties
Typical Tool Requirements
yBox Cutter
ySnips
yTape Measure
ySpeed Square
yHammer Drill
1/2-inch Concrete Drill Bit (Bollards)
3/8-inch Concrete Drill Bit (Stand/Angle Iron)
1/4-inch Concrete Drill Bit (Wall Stays)
yImpact Driver
3/8-inch Socket (Stack Light/Photo Eye)
PH3 Impact Drill Bit (Feet Screws)
3/4-inch Socket (Bollards)
9/16-inch Socket (Stands/Angle Iron)
1
yDrill
1-inch Hole Saw (Door Tracks)
Drill Bit Assortment Box
Reamer Bit (Door Tracks)
yNeedle Nose Pliers
yHex Wrench Set
yPhilips / Flat Screwdrivers
yMini Flat Head Screwdriver
y5/32 T-Handle
yLadder
yExtension Cord(s)
yVacuum or Broom
Introduction
2
Installation
This installation should only be performed by a professional technician trained to install this
hardware.
Read these instructions thoroughly before performing the installation.
Angle Iron Installation with Existing Bollard
1. Measure 6 inches from the side of the bollard.
2. Align the angle iron to the side of the existing bollard.
3
Installation
Angle Iron Installation without Existing Bollards
1. Measure 1-foot, 4 inches (16 inches) from door track to side of angle iron.
2. Align the angle iron to the door track.
3. Mark the hole locations onto the oor.
4. Using a 3/8-inch concrete drill bit, drill the two holes to a depth of 3 inches.
5. Using an impact driver, secure the angle iron to the oor using two 3/8-inch HD screw
anchors.
4
Installation
Panel Installation with Angle Iron
The A-Panel must be installed on the side of the Power over Ethernet (PoE) drop. It is advised that
the PoE drop be no less than 8 feet from the oor to avoid accidental disconnect.
The A-panel and the B-panel are installed in the same way.
1. Position the panel base up to and centered on the angle iron.
2. Mark the hole locations onto the oor.
3. Using a 3/8-inch concrete drill bit, drill one hole to a depth of 3 inches.
4. Using an impact driver, secure the panel base to the oor using one 3/8-inch HD screw
anchor.
5. Check the alignment of the base before proceeding with drilling the remaining holes.
6. Once the alignment is veried, remark the remaining hole locations if necessary.
7. Drill the remaining holes and reposition the panel.
8. Secure the panel to the oor with the remaining 3/8-inch HD screw anchors.
5
Installation
Panel Installation without Angle Iron and with Existing Bollard
The A-Panel must be installed on the side of the Power over Ethernet (PoE) drop. It is advised that
the PoE drop be no less than 8 feet from the oor to avoid accidental disconnect.
The A-panel and the B-panel are installed in the same way.
1. Measure 6 inches from the side of the bollard and align the panel to the centerline of the
bollard.
2. Position the panel and mark the hole locations onto the oor.
3. Using a 3/8-inch concrete drill bit, drill one hole to a depth of 3 inches.
4. Using an impact driver, secure the panel base to the oor using one 3/8-inch HD screw
anchor.
5. Check the alignment of the base before proceeding with drilling the remaining holes.
6. Once the alignment is veried, remark the remaining hole locations if necessary.
7. Drill the remaining holes and reposition the panel.
8. Secure the panel to the oor with the remaining 3/8-inch HD screw anchors.
6
Installation
Panel Installation without Angle Iron and without Existing Bollard
The A-Panel must be installed on the side of the Power over Ethernet (PoE) drop. It is advised that
the PoE drop be no less than 8 feet from the oor to avoid accidental disconnect.
The A-panel and the B-panel are installed in the same way.
1. Measure 1-foot, 4 inches (16 inches) from the door track (measuring away from the door)
and 2 inches from the side of the door track (measuring from the outside edge of the door
track).
2. Position the panel and mark the hole locations onto the oor.
3. Using a 3/8-inch concrete drill bit, drill one hole to a depth of 3 inches.
4. Using an impact driver, secure the panel base to the oor using one 3/8-inch HD screw
anchor.
5. Check the alignment of the base before proceeding with drilling the remaining holes.
6. Once the alignment is veried, remark the remaining hole locations if necessary.
7. Drill the remaining holes and reposition the panel.
8. Secure the panel to the oor with the remaining 3/8-inch HD screw anchors.
7
Panel Installation with Canting
1. Using the top corner of the panel (facing the opposite panel) as the pivot point, rotate the
bottom of the panel out 6 inches.
2. Mark the hole locations onto the oor.
3. Using a 3/8-inch concrete drill bit, drill one hole to a depth of 3 inches.
4. Using an impact driver, secure the panel base to the oor using one 3/8-inch HD screw
anchor.
5. Check the alignment of the base before proceeding with drilling the remaining holes.
6. Once the alignment is veried, remark the remaining hole locations if necessary.
7. Drill the remaining holes and reposition the panel.
8. Secure the panel to the oor with the remaining 3/8-inch HD screw anchors.
Installation
8
Installation
Bollard Installation without Angle Iron
The coaxial cable is stored in and pre-connected to B-panel.
1. Measure 5 inches from the side of the panel base to the bollard base.
2. Align the bollard base to the side of the panel base.
3. Mark the hole locations onto the oor.
4. Using a 1/2-inch concrete drill bit, drill the holes to a depth of 3 inches.
5. Using an impact driver, secure the panel base to the oor using four 1/2-inch HD screw
anchors.
9
Installation
Bollard Installation with Angle Iron
1. Measure 4 inches from the front edge of the angle iron furthest from dock door.
2. Align the bollard base to the side of angle iron (facing the opposite panel).
3. Mark the hole locations onto the oor.
4. Using a 1/2-inch concrete drill bit, drill the holes to a depth of 3 inches.
5. Using an impact driver, secure the panel base to the oor using four 1/2-inch HD screw
anchors.
10
Coaxial Cable Installation
The coaxial cable is stored in and pre-connected to B-panel.
1. Remove the B-panel front cover.
2. Remove the ties that secure the cable bundle and unwrap the cables, straightening them.
3. Plan the cable routing.
a. Use existing conduit and space behind the dock door track (if available) to route the
coaxial cable.
b. If there is no existing conduit to route, use the wall stays to mount the cable to the dock
door wall.
Installation
11
Installation
c. If access through the dock door track is required, make sure the passthrough hole does
not interfere with the operation of the dock door.
d. Use 1-inch hole saw to drill a hole through the door track on both sides. Remove any
burrs from the hole using a reamer bit or metal le.
e. Fasten the cables together along the route using zip ties.
4. Pass the number of coaxial cables through the top opening of A-panel.
5. Connect the coaxial cables to their respective locations on the reader.
12
Installation
Power Over Ethernet (PoE) Connection
1. Plug in the PoE cable from the drop and into the ETHERNET quick connect port on the back
of A-panel.
WARNING • Do not plug the ethernet cable into the console port as this may damage the reader.
2. The reader will power up.
13
GPIO Connector
The GPIO connector is used to enable photo eye and stack light functionality.
1. Connect the GPIO to the reader.
2. Connect the USB to the reader.
3. Connect the stack light (labeled Sensor) to its respective quick connect.
4. Connect the photo eye (labeled Tower Light) to its respective quick connect.
Installation
14
Photo Eye Installation
The photo eye mounts to the A panel closest to the dock door. This ensures that the photo eye will
be within 10 feet of the reective tape on the dock door—the maximum recommended distance.
1. Using the #14 screw, secure the photo eye bracket to the portal extrusion hole second from
the panel edge facing the opposite panel.
2. Adhere the reective tape to the inside of the dock door at the same level as the phot eye
lens.
Installation
15
Installation
3. Connect the photo eye cable to the quick connect on the rear of A-panel closest to the dock
door.
4. The red light in the back of photo eye will blink when it is in line with the reective tape—the
faster the light blinks, the better the signal).
5. Adjust the position of the photo eye as necessary.
16
Stack Light Installation
1. Using the #14 screw, secure the stack light bracket to the portal extrusion hole second from
the panel edge facing the opposite panel.
2. Connect the stack light cable to the quick connect on the rear of A-panel farthest from the
dock door.
Installation
Stack Light Conditions
ColorCondition
RedInventory Inactive / Standby
GreenInventory Active
Red + Green + AudibleSystem Alert, Contact Support
Red + Green PulseLicense Key Error / Network Failure
No Light or AudibleNo Power, Check Connection
17
Cleanup
Make sure to remove any packing material, packing ties, tools, and other equipment from the
installation.
Make sure to clean up any dust or debris created by the installation.
18
www.zebra.com
Loading...
+ hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.