Triton T100e Installation Instructions

Page 1
T100e
Thermostatic
Care and
Care Plus
electric shower
Installation and
operating
instructions
Installers please note these Instru ctIons are to be left wIt h the user
2180375J - November 2011
Page 2
T100e thermostatic care & care plus
CONTENTS Page
Important safety information .......................................................... 1
Introduction ................................................................................... 2
Specifications .................................................................................. 2
Understanding your shower ........................................................... 2
Main components .......................................................................... 3
Electrical requirements .................................................................... 4
Water requirements ........................................................................ 6
Siting of the shower ....................................................................... 7
Fitting the shower to the wall ......................................................... 8
Plumbing connections ................................................................... 10
Electrical connections .................................................................... 11
Commissioning .............................................................................. 12
Replacing the cover ....................................................................... 14
Operating the shower.................................................................... 15
Operating functions ....................................................................... 18
Instructions for installers and service engineers only ................... 19 - 20
Cleaning the inlet filter ........................................................... 19
Cleaning the scale trap........................................................... 20
Spare parts .................................................................................... 21
Fault finding ...............................................................................22 - 23
Water/Cable entry points diagram .................................... 24
Guarantee, service policy, etc. ..................................................rear cover
To check the product suitability for commercial and multiple installations, please contact Triton’s specification advisory service before installation.
Telephone:
Facsimile:
0844 980 0730
0844 980 0744
E mail:
technical@tritonshowers.co.uk
Page 3
T100e thermostatic care & care plus
PLEASE READ THIS IMPORTANT SAFETY INFORMATION
Products manufactured by Triton are safe and without risk provided they are installed, used and maintained in good working order in accordance with our instructions and recommendations.
WARNING: DO NOT operate shower if frozen, or suspected of being frozen. It must thaw out before using.
DO NOT operate the unit if the showerhead or spray hose becomes damaged. DO NOT restrict flow out of shower by placing showerhead in direct contact with your body. DO NOT operate the shower if water ceases to flow during use or if water has entered inside
the unit because of an incorrectly fitted cover.
1 GENERAL
1.1 Isolate the electrical and water supplies before
removing the cover.
1.2 Read all of these instructions and retain them
for later use.
1.3 DO NOT take risks with plumbing or electrical
equipment.
1.4 Isolate electrical and water supplies before
proceeding with the installation.
1.5 The unit must be mounted onto the finished
wall surface (on top of the tiles). DO NOT tile up to or seal around ANY PART of the unit using silicone sealer after fixing to the wall. Special care must be taken NOT TO BLOCK OR SEAL ANY PRD VENTS ON THE UNIT.
1.6 Contact Customer Service (see back page), if
any of the following occur:
a) If it is intended to operate the shower at
pressures above the maximum or below the minimum stated.
b) If the unit shows a distinct change in
performance.
c) If the shower is frozen.
1.7 If it is intended to operate the shower in areas
of hard water (above 200 ppm temporary hardness), a scale inhibitor may have to be fitted. For advice on the Scale Inhibitor, contact Customer Service.
1.8 The showerhead must be cleaned regularly
with descalent to remove scale and debris, otherwise restrictions to the flow on the outlet of the unit will result in higher temperatures and could also cause the (PRD) Pressure Relief Device in the unit to operate.
1.9 This product is not suitable for mounting into
steam rooms or steam cubicles.
2 PLUMBING
2.1 The plumbing installation must comply with
Water Regulations, Building Regulations or any particular regulations as specified by Local Water Company or Water Undertakers and should be in accordance with BS 6700.
2.2 The supply pipe must be flushed to clear debris
before connecting to the shower unit.
2.3 DO NOT solder pipes or fittings within 300mm
of the shower unit, as heat can transfer along the pipework and damage components.
2.4 DO NOT fit any form of outlet flow control as
the outlet acts as a vent for the heater can.
2.5 DO NOT use excessive force when making
connections to the flexible hose or showerhead, finger tight is sufficient.
2.6 All plumbing connections must be completed
before making the electrical connections.
3 ELECTRICAL
3.1 The installation must comply with BS 7671
‘Requirements for electrical installations’ (IEE wiring regulations), building regulations or any particular regulations as specified by the local Electrical Supply Company.
3.2 This appliance MUST be earthed.
3.3 In accordance with ‘The Plugs and Sockets etc.
(Safety) Regulations 1994’, this appliance is intended to be permanently connected to the fixed wiring of the electrical mains system.
3.4 Make sure all electrical connections are tight to
prevent overheating.
3.5 A 30mA residual current device (RCD) MUST
be installed in all UK electric and pumped shower circuits. This may be part of the consumer unit or a separate unit.
3.6 Switch off immediately at isolating switch if
water ceases to flow during use.
3.7 Other electrical equipment i.e. extractor fans,
pumps must not be connected to the circuits within the unit.
3.8 Switch off at isolating switch when not in use.
This is a safety procedure recommended with all electrical appliances.
3.9 As with all electrical appliances it is
recommended to have the shower and installation checked at least every two years by a competent electrician to ensure there is no deterioration due to age and usage.
1
Page 4
T100e thermostatic care & care plus
SPECIFICATIONS
INTRODUCTION
UNDERSTANDING YOUR SHOWER
Introduction This book contains all the necessary installation
and operating instructions for your Triton T100e Thermostatic Care or Care Plus electric shower.
Take time to read this book thoroughly and familiarise yourself with all instructions BEFORE starting installation. Please keep it for future reference.
The shower installation must be carried out by a suitably qualified person and in the sequence of this instruction book.
Care taken during the installation will provide a long, trouble-free life from your shower.
Specifications
Electrical
Nominal power Nominal power rating at 240V rating at 230V
8.5kW – (40A MCB rating) 7.8kW – (40A MCB rating)
Water
Inlet connection – 15 mm diameter. Outlet connection – ½” BSP male thread.
Entry Points
Water – Right: back, bottom, top.
Cable – Right: back, bottom, top.
Materials
Backplate, cover, controls, showerhead – ABS. Sprayplate – Acetal. Elements – Minerally insulated corrosion resistant metal sheathing.
Dimensions
Height - 343mm Width - 222mm Depth - 114mm (including lever)
Standards and Approvals
Waterproof rating IPX4.
Complies with the requirements of current British and European safety standards for household and similar electrical appliances.
Complies with requirements of the British Electrotechnical Approvals Board (BEAB).
Meets with Compliance with European Community Directives (CE).
Understanding your shower
IMPORTANT: When first installed the unit will be empty. It is essential the unit should contain water before the elements are switched on. It is vital that the commissioning procedure is followed. Failure to carry out this operation will result in damage to the unit and will invalidate the guarantee.
I-001-A
Temperature/flow rate
The temperature control on the unit can be adjusted to provide shower temperatures to meet individual needs.
Note: The maximum flow rate for the given temperature will be greater in the summer than in winter because of ambient temperature variance of the mains water supply.
It is strongly advised to select economy power during periods of hot weather, otherwise at all other times, leave the power setting at full to provide the maximum flow rate.
Safety cut-out
The unit is fitted with a non-resettable over­temperature safety device. In the event of abnormal operation which could cause unsafe temperatures within the unit, the device will disconnect the heating elements. It will require a visit from a qualified engineer to determine the nature of the fault and replace the safety device, once the unit has been repaired.
Replacement parts can be ordered from Customer Service. See ‘spare parts’ for details and part numbers.
Y-003-A
2
Page 5
T100e thermostatic care & care plus
MAIN COMPONENTS
L
L
N
N
17
1
2
17
3
3
3
4
5
6
10
12
8
7
9
11
14
13
15
16
17
20
20
20
19
21
18
Main components
Inside unit (fig.1)
1. Top cable / pipe entry
2. Bottom cable / pipe entry
3. Wall screw fixings
4. Power Printed Circuit Board
5. Thermal cut-out
6. Can and element assembly
7. Ribbon cable connector
8. Terminal block
9. Earth connection
10. PRD
11. Solenoid valve
12. Trim plate
13. Thermostatic valve
14. Scale trap
15. Pressure switch
16. Shower outlet
17. Guide pockets
Inside cover (fig.2)
18. Control Printed Circuit Board
19. Start/stop Printed Circuit Board
20. Cover tags
21. Ribbon cable
Fig.1
17 17
3
4
1
3
5
9
6
7
8
10
11
12
13
16
3
15
2
14
17
Note: Not all wires have been depicted for reason of clarity.
Fig.2
3
20 20
18
21
20
19
Page 6
T100e thermostatic care & care plus
Meter
Incoming
supply
fuse
Meter
tails
Consumer
unit
Pull cord
isolating switch
Shower
unit
Fuse or
MCB
RCD
(can be part of
consumer unit)
80A or 100A
main switch
Shepperton Park,
Triton Road, Nuneaton,
Warwickshire, CV11 4NR
MCB
30/32A
32A
40A
40A
40A
40/45A
45A
cartridge
fuse
30A
35A
35A
45A
45A
45A
45A
unit
rating
7.0kW
7.5kW
8.0kW
8.5kW
9.0kW
9.5kW
10.5kW
CIRCUIT PROTECTION
ELECTRICAL REQUIREMENTS
The installation, supply cable and circuit protection must conform with BS 7671 (IEE wiring regulations) and be sufficient for the amperage required. The following notes are for guidance only:
1 The shower must only be connected to a
230-240V ac supply. If you are installing a shower with a kilowatt rating above 9kW, it is advisable to contact the local electricity supply company.
1.1 The electrical rating of the shower is shown on the rating label (Fig.3) within the unit.
2 Before making any sort of electrical
connection within the installation make sure that no terminal is live. If in any doubt, switch off the whole installation at the mains supply and remove the correct fuse.
3 The shower must be connected to its own
independent electrical circuit. IT MUST NOT be connected to a ring main, spur, socket outlet, lighting circuit or cooker circuit.
3.1 The electrical supply must be adequate for the loading of the unit and existing circuits.
4 Check your consumer unit (main fuse box)
has a main switch rating of 80A or above and that it has a spare fuse way which will take the fuse or Miniature Circuit Breaker (MCB) necessary for the shower (Fig.4).
4.1 If your consumer unit has a rating below 80A or if there is no spare fuse way, then the installation will not be straightforward and may require a new consumer unit serving the house or just the shower.
4.2 You will need to contact the local electricity company. They will check the supply and carry out what is necessary.
5 For close circuit protection DO NOT use a
rewireable fuse. Instead use a suitably rated Miniature Circuit Breaker (MCB) or cartridge fuse (see Table A).
Fig.3
Fig.4 Schematic of installation circuit
Table A
4
Page 7
Note: Cable selection is dependent on
derating factors
Twin and earth PVC insulated cable
Current carrying capacity
In conduit
trunking
6 mm²
38A
10 mm²
52A
16 mm²
69A
Installed in an insulated wall
6 mm²
35A
10 mm²
47A
16 mm²
63A
Clipped direct
or buried in a non-insulated
wall
6 mm²
47A
10 mm²
64A
16 mm²
85A
installation will not be straightforward and may require a new consumer unit serving the house or just the shower.
4.2 You will need to contact the local electricity
company. They will check the supply and carry out what is necessary.
5 For close circuit protection DO NOT use a
rewireable fuse. Instead use a suitably rated Miniature Circuit Breaker (MCB) or cartridge fuse (see Table A).
E-002-A
5.1 A 30mA residual current device (RCD) must
be installed in all UK electric and pumped shower circuits. This may be part of the consumer unit or a separate unit.
6 A 45 amp double pole isolating switch with
a minimum contact gap of 3 mm in both poles must be incorporated in the circuit.
6.1 It must have a mechanical indicator showing
when the switch is in the OFF position, and the wiring must be connected to the switch without the use of a plug or socket outlet.
6.2 The switch must be accessible and clearly
identifiable, but out of reach of a person using a fixed bath or shower, except for the cord of a cord operated switch, and should be placed so that it is not possible to touch the switch body while standing in a bath or shower cubicle. It should be readily accessible to switch off after using the shower.
7 Where shower cubicles are located in any
rooms other than bathrooms, all socket outlets in those rooms must be protected by a 30mA RCD.
8 The current carrying capacity of the cable
must be at least that of the shower circuit protection (see Table B).
8.1 To obtain full advantage of the power
provided by the shower, use the shortest cable route possible from the consumer unit to the shower.
8.2 It is also necessary to satisfy the
disconnection time and thermal constraints which means that for any given combination of current demand, voltage drop and cable size, there is a maximum permissible circuit length.
9 The shower circuit should be separated from
other circuits by at least twice the diameter of the cable or conduit.
9.1 The current rating will be reduced if the
cabling is bunched with others, surrounded by thermal loft or wall insulation or placed in areas where the ambient temperature is above 30°C. Under these conditions, derating factors apply and it is necessary to select a larger cable size.
9.2 In the majority of installations, the cable
5.1 A 30mA residual current device (RCD) must be installed in all UK electric and pumped shower circuits. This may be part of the consumer unit or a separate unit.
6 A 45 amp double pole isolating switch with
a minimum contact gap of 3 mm in both poles must be incorporated in the circuit.
6.1 It must have a mechanical indicator showing when the switch is in the OFF position, and the wiring must be connected to the switch without the use of a plug or socket outlet.
6.2 The switch must be accessible and clearly
7 Where shower cubicles are located in any
8 The current carrying capacity of the cable
8.1 To obtain full advantage of the power
8.2 It is also necessary to satisfy the
9 The shower circuit should be separated from
9.1 The current rating will be reduced if the
identifiable, but out of reach of a person using a fixed bath or shower, except for the cord of a cord operated switch, and should be placed so that it is not possible to touch the switch body while standing in a bath or shower cubicle. It should be readily accessible to switch off after using the shower.
rooms other than bathrooms, all socket outlets in those rooms must be protected by a 30mA RCD.
must be at least that of the shower circuit protection (see Table B).
provided by the shower, use the shortest cable route possible from the consumer unit to the shower.
disconnection time and thermal constraints which means that for any given combination of current demand, voltage drop and cable size, there is a maximum permissible circuit length.
other circuits by at least twice the diameter of the cable or conduit.
cabling is bunched with others, surrounded by thermal loft or wall insulation or placed in areas where the ambient temperature is above 30°C. Under these conditions, derating factors apply and it is necessary to select a larger cable size.
T100e thermostatic care & care plus
E-002-A
will unavoidably be placed in one or more of the above conditions. This being so, it is strongly recommended to use a minimum of 10mm cabling throughout the shower installation.
9.3 In any event, it is essential that individual
site conditions are assessed by a competent electrician in order to determine the correct cable size and permissible circuit length.
Table B
5
Page 8
T100e thermostatic care & care plus
Isolating
stopvalve
Mains water supply
Shower unit
Switch may
be wall
mounted
in accordance
with IEE regs.
Mains electric supply (via double pole switch)
Double
pole
isolating
switch
Separate permanently connected supply from consumer unit
WATER REQUIREMENTS
Fig.5 Diagrammatic view (not to scale)
WARNING!
If planning to use a silicon seal
around the backplate edge, do not
place sealant in the area of the PRD
exit channel.
Water requirements The installation must be in accordance with
Water Regulations/Bylaws.
To guarantee activating the heating elements, the shower must be connected to a mains water supply with a minimum running pressure of 100kPa (1.0 bar) at a minimum flow rate of nine litres per minute with a maximum static pressure of 1 000kPa (10 bar).
Note: If the stated flow rates are not available, it may not be possible to achieve optimum performance from the unit throughout the year.
Under site conditions where the power supply is below 220 volts and the mains water pressure is above 5 bar, it is recommended to fit a pressure reducing valve set at 3.5 bar.
Fig.5 shows a typical system layout.
DO NOT use jointing compounds on any pipe fittings for the installation.
During periods of high ambient temperatures it may be necessary to select a low power setting to achieve your preferred shower temperature.
The water supply can be taken from a cold water storage cistern provided there is a minimum head of ten metres above the showerhead. It must be an independent supply to the shower only.
If it is intended to operate the shower at pressures above the maximum or below the minimum stated, contact Customer Service.
6
Page 9
T100e thermostatic care & care plus
Outline of shower tray
Mains cold
water supply
(either top, side, bottom or rear entry)
Shower unit
can be mounted
either side of riser rail
Height of
shower
should
be a
minimum of 1 metre from base
Spillover level
Height of
sprayhead
and shower
to suit user's
requirement
Area to keep clear
PRD outlet
SITING OF THE SHOWER
Siting of the shower
IMPORTANT: If installing onto a tiled wall always mount the unit on the surface of the tiles. NEVER tile up to the unit.
Refer to fig.6 for correct siting of the shower.
Position the unit where it will NOT be in direct contact with water from the showerhead. Position the shower unit vertically.
Allow enough room between the ceiling and the shower to access the cover top screws.
Note: Water regulations require the showerhead be ‘constrained by a fixed or sliding attachment so that it can only discharge water at a point not less than 25mm above the spill-over level of the relevant bath, shower tray or other fixed appliance’. The use of the supplied soap dish will in most cases meet this requirement, but if the showerhead can be placed within a bath, basin or shower tray, then a double check valve, or similar, must be fitted in the supply pipework to prevent back-flow.
Pressure relief safety device
A pressure relief device (PRD) is designed into the shower unit which complies with European standards. The PRD provides a level of appliance protection should an excessive build up of pressure occur within the shower.
DO NOT operate the shower with a damaged or kinked shower hose, or a blocked showerhead. This can cause the PRD to operate.
Make sure the PRD outlet at the bottom of the unit is not blocked (fig.7).
When commissioning, the showerhead must be removed from the flexible hose. Failure to follow this procedure may cause the PRD to operate.
Make sure the shower is positioned over a bath or shower tray because if the PRD operates, then water will eject from the bottom of the unit. Should this happen, turn off the electricity and water supplies to the shower at the isolating switch and stopvalve. Contact Customer Service for advice on replacing the PRD.
WARNING!
The shower must not be positioned
where it will be subjected to freezing
W-008-A
conditions.
Fig.6 Diagrammatic view (not to scale)
Fig.7
IMPORTANT: The unit must be mounted on a flat surface which covers the full width and length of the backplate. It is important that the wall surface is flat otherwise
I-002-A
difficulty may be encountered when fitting the cover and subsequent operation of the unit may be impaired.
7
Page 10
T100e thermostatic care & care plus
21
mm
INLET
L
L
N
N
INLET
N
N
Olive
Nut
FITTING THE SHOWER TO THE WALL
Fig.8
Fig.11
Fig.12
Fitting the shower to the wall
WARNING!
Check there are no hidden cables or
pipes before drilling holes for wall
plugs. Use great care when using power
W-005-A
tools near water. The use of a residual current device (RCD) is recommended.
Note: The control lever is an integral part of the cover — DO NOT attempt to remove it.
Unscrew the two top and one bottom retaining
Fig.10Fig.9
screws. There is no need to completely remove the screws, just enough to lift the cover from the backplate. To allow access for the pipe and cable connections, remove the trimplate by lifting it away from the backplate.
Entry positions for the mains water are from the top, bottom or back. Cable entry is via the top, bottom or back.
Note: Deviations from the designated entry points will invalidate product approvals.
If bottom surface entry is required, then the necessary hole will need to be cut out in the thinned section of the trimplate using a junior hacksaw and file (fig.8).
If bottom or rear entry is chosen, the pipe trim will need to be fitted in the top entry position on the backplate (fig.9). The pipe trim is packaged separately.
If installing a supply pipe from the bottom, the centre of the inlet valve to the wall surface is 21mm.
If entry is from the back, the nut of the compression fitting will be partially behind the surface of the wall. This area MUST be left clear when plastering over the pipework to make the nut accessible for future adjustments.
Note: the distance between the centre of the inlet valve and the wall is 21mm (fig.10).
To ease the installation of the unit remove the shaded area shown in fig.11.
8
Page 11
T100e thermostatic care & care plus
. . . . . .
. . . . . .
. . . . . .
. . . . . .
L
L
N
N
. . . . . .
. . . . . .
. . . . . .
. . . . . .
NL
NL
. . . . . .
. . . . . .
. . . . . .
. . . . . .
L
L
N
N
. . . . . .
. . . . . .
. . . . . .
. . . . . .
NL
NL
L
L
N
N
Slide the compression nut and olive onto the unit inlet pipe. Make sure the inlet filter is in place before attempting to fit onto the elbow connector (fig.12).
Turn the unit at an angle similar to that shown in fig.13. This will allow easier access for fitting the inlet pipe onto the elbow connector.
Fit the unit, taking care to make sure that the inlet pipe is connected to the elbow. Once the inlet pipe is located, carefully turn the unit anti­clockwise until it is level and push gently into place onto the elbow (fig,14).
After choosing the site for the shower, use the backplate as a template (fig.15) and mark the three fixing holes.
Drill and plug the wall.
(An appropriate drill bit should be used. If the wall is brick, plasterboard or a soft building block, appropriate wall plugs and screws should be fitted).
Secure the unit in place. Do not fully tighten the screws at this stage, as the fixing holes are elongated for out of square adjustment after the plumbing connections has been completed.
Fig.13
Fig.14
Fig.15
9
Page 12
T100e thermostatic care & care plus
Inlet filte
r
PLUMBING CONNECTIONS
Fig.16
WARNING!
The outlet of the shower acts as a
vent and MUST NOT be connected to
anything other than the hose and
IMPORTANT: Using a suitable sealant, always seal around the incoming pipework to prevent water entering the wall.
W-004-A
showerhead supplied.
Plumbing connections
Plumbing to be carried out before wiring
DO NOT use jointing compounds on any pipe fittings for the installation.
DO NOT solder fittings near the shower unit as heat can transfer along the pipework and damage components.
Compression fittings MUST be used to connect to the inlet of the shower.
Note: An additional stopvalve (complying with Water Regulations) MUST be fitted in the mains water supply to the shower as an independent means of isolating the water supply should maintenance or servicing be necessary.
Procedure
Turn off the water supply either at the mains stopvalve or the isolating stopvalve. Connect the mains water supply to the inlet of the shower via 15mm copper, stainless steel or plastic pipe using a 15mm x 15mm brass elbow compression fitting. The plastic filter protrudes from the inlet (fig.16) so make sure it is in place before connection.
The compression fitting must be pushed fully home onto the inlet to ensure full engagement.
Note: The inlet fitting is designed to enter a compression fitting only. DO NOT use push­fit connectors as full engagement cannot be guaranteed. DO NOT use excessive force when making these connections.
IMPORTANT: Before completing the connection of the water supply to the inlet of the shower, and in compliance with Water Regulations, flush out the pipework to remove all swarf and system debris. This can be achieved by connecting a hose to the pipework and turning on the mains water supply long enough to clear the debris to waste.
Make sure the backplate is square on the wall and tighten the three retaining screws which hold it to the wall. Check the backplate is not distorted when screws are fully tightened.
Turn on the mains water supply and check for leaks in the pipework connection to the shower.
Note: At this stage no water can flow through the unit.
10
Page 13
T100e thermostatic care & care plus
L
N
E
Start/stop switch
Control
PCB
Power
PCB
Connector socket
Terminal
block
Thermal
cut-out
Pressure
switch
Thermistor
Earth
post
inlet
Solenoid
valve
outlet
Elements
Care Plus only
ELECTRICAL CONNECTIONS
Electrical connections Fig.17 shows a schematic wiring diagram.
The cable entry points are top, bottom or back. The cable can be surface clipped, hidden or via 20mm conduit.
Note: Conduit entry can only be from rear.
SWITCH OFF THE ELECTRICITY SUPPLY AT THE MAINS.
Route the cable into the shower unit and connect to the terminal block as follows:
Earth cable to terminal marked
Neutral cable to terminal marked N
Live cable to terminal marked L
IMPORTANT: Fully tighten the terminal block screws and make sure that no cable insulation is trapped under the screws. Loose connections can result in cable overheating.
Note: The supply cable earth conductor must be sleeved. The outer sheath of the supply cable must be stripped back to the minimum.
The supply cable must be secured either by routing through conduit or in trunking or by embedding in the wall, in accordance with current IEE regulations.
The use of connections within the unit to supply power to other equipment i.e. extractor fans, pumps etc. will invalidate the guarantee.
DO NOT switch on the electricity supply until the cover has been fitted.
Note: The elements on UK models are to 240V specifications and will give a lower kW rating if the v oltage supply is below 240V.
Fig.17
11
Page 14
T100e thermostatic care & care plus
Valve
spindle
COMMISSIONING
Fig.18
Fig.19
Commissioning
WARNING!
Before normal operation of the
shower, it is essential the following
commissioning procedure is completed
The first operation of the shower is intended to flush out any remaining system debris, to make sure that water is purged through the unit and that the heater unit contains water before the elements are switched on.
Refit the trimplate by carefully guiding into the locating slots in the backplate.
Temporarily fit the cover in order to carry out the commissioning procedure.
a. Offer the cover to the unit. DO NOT connect
the 14-way ribbon cable at this stage.
b. Make sure the valve spindle has the ‘flat’
and keyway slot uppermost (12 o’clock position) as shown in fig.18.
c. Make sure the temperature control lever
is positioned correctly — the lever ‘flat’ inside the cover should be uppermost (fig.19).
d. Carefully locate the cover tags into the
guide pockets on the backplate and make sure the wires are not trapped.
e. Guide into position so that the control
spindle locates correctly (the ‘flats’ will only allow the spindle and lever to fit one way).
Should any difficulty arise, recheck the points above.
While applying slight pressure to the front cover, secure in position with the three retaining screws.
Fit the flexible hose (but without the showerhead) to the shower outlet making sure the outlet of the hose is directed to waste. Check the supplied sealing washer is in place.
Turn on the water supply to the shower at the isolating stopvalve. Switch on the electricity supply to the shower at the isolating switch. Water will start to flow through the unit and discharge from the flexible hose.
W-001-A
correctly.
12
Page 15
T100e thermostatic care & care plus
L
L
N
N
It will take about thirty seconds for a smooth flow of water to be obtained while air and any debris is being flushed from the shower. When a smooth flow of water is obtained, disconnect the electricity supply to the shower at the isolating switch. This will stop the water flow. Unscrew the cover retaining screws again and lift the cover from the backplate.
Attached to the control PCB inside the cover is a 14-way ribbon cable. The ribbon cable connector must be plugged into the socket located on the power PCB inside the unit (fig.20). The connector can only be correctly plugged in one way because of a location lug on the plug. The ribbon cable also has a coloured edge which is on the right-hand side when correctly fitted to the socket.
Fig.20
13
Page 16
T100e thermostatic care & care plus
REPLACING THE COVER
IMPORTANT: Before finally fitting the cover, the following steps must be taken:
a. Check all plumbing connections are
watertight.
b. Check terminal block screws are fully
tightened.
c. Make sure the pipe and cable entering
the unit do not prevent the cover locating correctly to the backplate.
d. Make sure the valve spindle has the
‘flat’ and keyway slot uppermost (12 o’clock position) as shown in fig.18.
e. Make sure the temperature control
lever has the ‘flat’ inside the cover uppermost (fig.19).
Replacing the cover Offer the cover to the unit. Carefully locate
the cover tags into the guide pockets on the backplate and make sure wires are not trapped. Guide into position so that the control spindle locates correctly (the ‘flats’ will only allow the spindle and knob to fit one way). While applying slight pressure to the front cover, secure in position with the three retaining screws.
The flexible hose can be left attached to the shower outlet. Make sure the supplied sealing washer is fitted.
Once the riser rail kit is installed, the shower is ready for normal operation.
14
Page 17
T100e thermostatic care & care plus
Cold button
Power button
Temperature control lever
Start/Stop
button
Cold setting
indicator
Power
indicators
OPERATING THE SHOWER
Operating the shower The shower controls are shown in fig.21.
Make sure the water supply is turned fully on.
Switch the electric supply back on at the isolating switch.
Immediately the start up routine commences and the four LED’s flash simultaneously three times (the Care Plus will also emit a single ‘bleep’).
Starting the shower
Press the START/STOP button and water will begin to flow (the Care Plus will emit a single ‘bleep’). The two power indicators light, to show the shower is running at full power.
Stopping the shower
Press the START/STOP button (the Care Plus will emit a single ‘bleep’) and the phased shutdown will begin. Water continues to flow for a few seconds, flushing out any remaining hot water. This guarantees that the next immediate user does not receive a slug of hot water if standing under the showerhead when starting the shower.
Using the control buttons
The shower has two control buttons — POWER and COLD, as shown.
This symbol is for COLD water only. When pressed, the LED above the button lights up (the Care Plus will ‘bleep’ once). It will remain in this state until the power button is pressed.
Note: Adjustment of the temperature control at this setting has no effect on the force of water from the showerhead.
This symbol is the POWER button, which is a toggle switch between full power and economy power.
WARNING!
Before normal operation of the
shower, it is essential the following
W-001-A
commissioning procedure is completed
correctly.
Fig.21
Note: The shower automatically starts up on the
full power setting.
Economy is for using less power when the ambient mains temperature is high during hot months.
15
Page 18
T100e thermostatic care & care plus
Fig.22
Fig.23
If the shower is on full power and the POWER button is pressed, one of the LED’s below the button goes out (the Care Plus will also emit a single ‘bleep’). During this time, the flow rate decreases to try to achieve the same temperature as before.
Note: If the temperature setting was high at full power, then it will not be possible to obtain the same temperature as before on the economy setting. The shower will attempt to provide the highest temperature at the best flow rate.
Adjust the temperature via the temperature control.
Note: If the stated flow rate required for the unit cannot be met due to low water pressure, it will be necessary to operate the shower on economy power during hot months because of flow rate limitations entering the unit.
If the shower is on economy power or the cold setting and the power button is pressed, both LED’s will light up (and the Care Plus will emit a single ‘bleep’). During this time, the flow rate increases to achieve the same temperature as before or to correspond to the current temperature control position.
It is advisable to select full power at all times, except during periods of hot weather.
Adjusting the shower temperature
The showering temperature is varied by turning the temperature control which changes the mix of hot water coming from the heater can and the incoming cold water.
On the display circumference are ten marked outer segments which represent the total angular movement of the temperature control.
To increase the shower temperature turn the temperature control clockwise (fig.22). (The Care Plus will ‘bleep’ three times when an outlet temperature of 41°C or above has been reached).
To decrease the shower temperature turn the temperature control anti-clockwise (fig.23).
After obtaining your preferred showering temperature the control can be left as the normal setting.
16
Page 19
T100e thermostatic care & care plus
Adjustable
stop
Centre
screw
A
WARNING
This appliance is not intended for use
by persons (including children) with
reduced physical, sensory or mental
capabilities, or lack of experience
and knowledge, unless they have
been given supervision or instruction
concerning use of the appliance by a
person responsible for their safety.
Children should be supervised to
ensure that they do not play
with the appliance.
Setting the adjustable temperature stop
This shower unit is fitted with a temperature stop. This is factory set to allow the full range of temperatures to be selected. If required, the temperature stop can be adjusted by the installer to lock at a selected temperature setting, according to individual needs.
Procedure
With the cover in place, start the shower as normal. Set the temperature control to the maximum required temperature. This can be with the pointer positioned at any point between 1 and 10 on the front cover markings.
Make a note of your chosen maximum position.
Turn off the shower and isolate the electricity supply at the mains.
With a suitable screwdriver, unscrew the three cover retaining screws and lift the cover from the backplate.
Inside the cover is the temperature control (fig.24). With a suitable screwdriver, remove the centre screw from the adjustable stop.
IMPORTANT: Take care not to disturb the temperature lever on the front cover from the position selected.
Lift out the adjustable stop and reposition it at position ‘A’ (fig.25). Screw the stop back into position.
IMPORTANT: DO NOT rotate the valve spindle when the cover is removed as this will alter your selected temperature.
Offer the cover to the unit and carefully locate the cover tags into the guide pockets, and the control spindle into the cover correctly. While applying slight pressure to the cover, secure in place with the three retaining screws.
Switch on the electricity supply and start the shower.
Check that the temperature control lever locks at a position which provides a satisfactory showering temperature for all users.
Note: It is advisable to be certain that the showering temperature is satisfactory by testing with your hand before stepping under the showerhead.
Fig.24
Fig.25
CAUTION!
It is recommended that persons who may
have difficulty understanding or operating
the shower controls should not be left
unattended while using the shower. Special
consideration should be given to young
children and the less able bodied.
17
Page 20
T100e thermostatic care & care plus
Low pressure indicator
OPERATING FUNCTIONS
Fig.26
Operating functions There will always be a time delay of a few
seconds between selecting a temperature and the water reaching the stable selected temperature.
Low pressure
When the low pressure indicator (fig.26) flashes steadily (the Care Plus will also ‘bleep’ intermittently) it means the water pressure has fallen below the minimum pressure required for correct operation of the shower, resulting in the low pressure switch operating. This switches off power to the heating elements preventing any maintained temperature rises. Water will no longer flow until the unit has been reset.
Press the START/STOP button once to reset the shower. The low pressure light will go out and the unit will now be ready for normal operation.
Once normal water pressure is restored, the unit can be restarted by pressing the START/STOP button.
Phased shutdown
In use, when the START/STOP button is pressed, power is switched off to the elements and the power indicator will extinguish. Water continues to flow for a few seconds, flushing out any remaining hot water. This makes sure that the next immediate user will not receive a slug of hot water if standing under the showerhead when starting the shower.
Safety cut-out
The shower is fitted with a thermal cut-out safety device. In the event of abnormal operation which could cause unsafe temperatures within the unit, the device will disconnect the heating elements.
It will require a visit from a qualified engineer to find out the nature of the fault and replace the safety device, once the unit has been repaired.
Note: In normal use, it is normal to leave the water supply permanently on to the shower unit, but as with most electrical appliances, the unit should be switched off at the isolating switch when not in use.
18
Page 21
T100e thermostatic care & care plus
CLEANING THE INLET FILTER
Inlet filte
r
Instructions for installers and service engineers only
It is recommended that the filter is periodically cleaned in order to maintain the performance of the shower.
It is essential that this operation is carried out by a competent person.
SWITCH OFF THE ELECTRICITY SUPPLY AT THE MAINS.
Remove the cover. The inlet filter is situated in the solenoid inlet (fig.27) and can be removed to clean.
Remove the trimplate to gain access to the filter and disconnect and remove the compression fitting. Also, depending on the incoming pipework arrangements, if there is not enough slack in the pipework, it could mean the removing the unit from the wall.
When cleaning the plastic filter, DO NOT use a sharp object, as it will cause damage. It is preferable to use an old toothbrush or similar.
INSTRUCTIONS FOR INSTALLERS AND SERVICE ENGINEERS ONLY
Cleaning the inlet filter
Fig.27
19
Page 22
T100e thermostatic care & care plus
CLEANING THE SCALE TRAP
INSTRUCTIONS FOR INSTALLERS AND SERVICE ENGINEERS ONLY
Fig.28
Cleaning the scale trap
It is recommended in hard water areas, the scale trap is periodically cleaned to maintain the performance of the shower.
It is essential that this operation is carried out by a competent person.
SWITCH OFF THE ELECTRICITY SUPPLY AT THE MAINS.
Remove the cover and unplug the ribbon cable. The scale trap is located at the lower left-hand side of the unit. Unscrew the single central screw (fig.28) then pull off the cap complete with ‘O’ rings. Be aware of water discharging as the heater can empties Clean out the trap and remove all sediment. Flush the can through by leaving the cap off and switching on the power at the isolating switch.
Note: Make sure the water that flows out of the scale trap will safely flow to waste.
Switch off the power at the isolating switch. Replace the cap making sure the ‘O’ rings are in place and free from debris. Secure with the central screw.
Switch the power back on again at the isolating switch to enable the can to fill with water. Check for water leakage at the scale trap. When water flows smoothly from the showerhead, stop the flow by switching the power off at the isolating switch.
Reconnect the connection cable, replace the cover and secure with the three screws.
20
Page 23
T100e thermostatic care & care plus
SPARE PARTS
T00339
L
L
N
N
1
2
3
4
5
7
9
6
12
13
14
11
8
10
Ref. Description Part No.
Spare parts
1. Printed circuit board .................... 7073730
2. Copper bus bar ............................ 7023005
3. Terminal block & wires ..............S07710901
Terminal block ........................... 22011410
4. Heater can assembly 8.5kW
c/w restrictor & TCO .............. 83307080
– Restrictor 8.5kW ......................... 22010400
5. Solenoid valve assembly
and ‘O’ ring ........................... 83307110
6. Pressure Relief Device ................. 82800450
7. Trimplate ..................................... 7053172
8. Can brace .................................... 7053008
9. Thermostatic valve
and ‘O’ rings (4) ..................... 83307130
10. Connecting tube ........................ 22010260
11. Scale trap cover
c/w ‘O’ rings and screw .......... 83307140
12. Outlet pipe assembly
Care ......................................... 7053196
Care Plus ...............................S07711000
13. Pressure switch microswitch
& wires ................................ P07710904
14. Pressure switch
and ‘O’ ring ........................... 83307120
15. Complete cover assembly
Care ......................................S07730600
Care Plus ...............................S07730601
– Wire set 2 x earth & 1 x solenoid
wires ...................................... 83307150
– Power PCB carrier ........................ 7052991
– Rubber microswitch cover ............ 7063046
– Inlet filter ..................................... 7053009
2
1
4
6
5
3
7
8
9
11
14
10
13
12
15
21
Page 24
T100e thermostatic care & care plus
FAULT FINDING
IMPORTANT: Switch off the electricity at the mains supply and remove the circuit fuse before attempting any fault finding inside the unit.
Problem/Symptom Cause Action/Cure
Fault finding
1 Shower inoperable. 1.1 Interrupted
2 Water flows when
isolating switch is switched on.
3 Water too hot. 3.1 Temperature control
4 Unstable shower
temperature or flow.
5 Water too cool or cold. 5.1 Temperature control
power supply.
1.2 Unit malfunction. 1.2.1 Have unit checked by suitably
2.1 Ribbon cable is not
connected.
2.2 Unit malfunction. 2.2.1 Contact Customer Service.
incorrect setting.
3.2 Unit malfunction. 3.2.1 Contact Customer Service.
4.1 Blockages. 4.1.1 Clean showerhead. Check inlet filter.
4.2 Loose ribbon cable
connection.
4.3 Unit malfunction. 4.3.1 Contact Customer Service.
incorrect setting.
5.2 Unit malfunction. 5.2.1 Contact Customer Service.
5.3 Safety cut-out operated. 5.3.1 The thermal safety cut-out device
1.1.1 Blown fuse or circuit breaker.
Check supply. Renew or reset fuse or circuit breaker. If it fails again, consult a qualified electrician.
1.1.2 Power cut? Check other appliances
and if necessary, contact local Electric Supply Co.
qualified electrician or contact Customer Service.
2.1.1 Switch off the electric supply,
remove the shower cover and plug in ribbon cable.
3.1.1 Turn anti-clockwise.
4.2.1 Check connections on PCB.
5.1.1 Turn clockwise.
has operated. Have unit checked by suitably qualified electrician or contact Customer Service.
6 Low pressure indicator
flashing.
6.1 Water pressure has
dropped below minimum required.
6.2 Blockage in outlet. 6.2.1 Check and clean outlet and/or
6.3 Loose connection on PCB. 6.3.1 Check connection on PCB from
6.1.1 Wait until water pressure has
returned to normal.
showerhead.
pressure switch.
22
Page 25
T100e thermostatic care & care plus
FAULT FINDING
Problem/Symptom Cause Action/Cure
6 Low pressure indicator
flashing.
7 Water continues to flow
when unit is isolated at isolating switch.
8 Pressure relief device
has operated (water ejected from PRD tube).
6.4 Blocked connecting tube
to pressure switch.
7.1 Debris in solenoid. 7.1.1 Contact Customer Service for
8.1 Blocked showerhead. 8.1.1 Clean or replace blocked
8.2 Twisted/blocked flexible
shower hose.
8.3 Showerhead not removed
whilst commissioning.
6.4.1 Make sure the tube from solenoid
valve to pressure switch is not kinked or blocked.
advice.
showerhead cartridge and then fit a new PRD.
8.2.1 Check for free passage through
hose. Replace the hose if necessary, then fit new PRD.
8.3.1 Fit new PRD. Commission unit with
showerhead removed.
Note: Identify cause of operation before fitting new PRD unit.
When fitting a new PRD, follow the commissioning procedure.
It is advised all electrical maintenance/repairs to the shower
N-003-A
should be carried out by a suitably qualified person.
In the unlikely event of unit failure other than detailed in the fault finding page,
please contact Customer Service for advice.
Y-001-A
23
Page 26
T100e thermostatic care & care plus
Entry Points
Diagram Key:
L
Water Entry Points
Cable Entry Points
L
N
N
24
Page 27
T100e thermostatic care & care plus
As a producer and a supplier of electric showers, Triton Showers is committed to the protection of the environment
WEEE Directive – Policy Statement
via our own environmental policy and the compliance with the WEEE directive.
Triton Showers is fully registered with the Environment Agency under the following schemes:
Repic: Producers take-back scheme (PTS), registration number WEE/EJ3466QV
Valpak: Distributor take-back scheme (DTS), registration number 9659
All our electric products are labelled accordingly with the crossed out wheeled bin symbol. This indicates, for disposal purposes at end of life, that these products must be taken to a recognised collection points, such as local authority sites/local recycling centres; this will be free of any charges. Do not return to Triton Showers.
25
Page 28
UK SERVICE POLICY
In the event of a product fault or complaint occurring, the following procedure should be followed:
1. Telephone Customer Service on 0844 980 0750 having available,
your details including post code, the model number and power rating of the product, together with the date of purchase and, where applicable, details of the particular fault.
2. If required, the Customer Service Advisor will arrange
for a qualified engineer to call.
3. All products attended to by a Triton service engineer must be
installed in full accordance with the Triton installation guide applicable to the product. (Every product pack contains an installation
guide, however, they can also be bought via our Customer Service Spares Department).
4. Our engineer will require local parking and if a permit is required this
must be available to the engineer on arrival at the call.
5. It is essential that you or an appointed representative (who must
be over 18 years of age) is present for the duration of the service
engineer's visit. If the product is in guarantee you must produce proof of purchase.
6. Where a call under the terms of guarantee has been booked and
the failure is not product related (i.e. scaling and furring, incorrect
water pressure, pressure relief device operation or electrical/plumbing installation fault) a charge will be made. A charge will also be issued
if nobody is at home when the service engineer calls or adequate parking/permit is not available.
7. If the product is no longer covered by the guarantee an up front
fixed fee will be charged before the site visit.
8. Should proof of purchase not be available on an “in-guarantee” call,
or should the service engineer find that the product is no longer under guarantee, the engineer will charge the same fixed price and the customer will be expected to pay the engineer before he leaves. If payment is not made on the day an administration charge will be added to the fixed charge.
9. If a debt is outstanding from a previous visit, or from any other Triton
purchase. Triton reserves the right to withhold service until the debt has been settled.
10. Triton takes the health, safety and wellbeing of its employees very
seriously and expects customers to treat all staff members with respect. Should any employee feel threatened or receive abuse, either verbally or physically, Triton reserves the right to withhold service and will support the employee with a legal prosecution.
Replacement Parts Policy
It is the policy of Triton Showers to maintain parts availability for the duration of production and a period of 5 years thereafter in accordance with industry standards. In the event of a spare part not being available a substitute part will be supplied.
Spare parts can be ordered via our online spare parts store, or by telephoning Triton Spares Department. Payment should be made by credit/debit card (excluding American Express or Diners Card). Payment can also be made by pre-payment of a pro-forma invoice, by cheque or postal order.
Telephone orders are based on information given during of the call. Before contacting Triton, please verify your requirements using the information contained in the user guide. Triton cannot accept liability for incorrect part identification.
TRITON STANDARD GUARANTEE
Triton guarantee this product against all mechanical and electrical defects arising from faulty workmanship or materials for a period of two years for domestic use only, from the date of purchase, provided that it has been installed by a competent person in full accordance with the fitting instructions.
Any part found to be defective during this guarantee period we undertake to repair or replace at our option without charge so long as it has been properly maintained and operated in accordance with the operating instructions, and has not been subject to misuse or damage.
This product must not be taken apart, modified or repaired except by a person authorised by Triton. This guarantee applies only to products installed within the United Kingdom and does not apply to products used commercially. This guarantee does not affect your statutory rights.
What is not covered:
1. Breakdown due to: a) use other than domestic use by
you or your resident family; b) wilful act or neglect; c) any malfunction resulting from the incorrect use or quality of electricity, gas or water or incorrect setting of controls; d) failure to install in accordance with this installation guide.
2. Claims for missing parts once the product has been
installed.
3. Repair costs for damage caused by foreign objects
or substances.
4. Total loss of the product due to non-availability
of parts.
5. Compensation for loss of use of the product or
consequential loss of any kind.
6. Call out charges where no fault has been found with the
appliance.
7. Call out charges where the water supply cannot be
isolated, this includes consequential losses arising from unserviceable supply valves.
8. The cost of repair or replacement of pressure relief
devices, showerheads, hoses, riser rails and/or wall brackets, isolating switches, electrical cable, fuses and/or circuit breakers or any other accessories installed at the same time.
9. The cost of routine maintenance, adjustments, overhaul
modifications or loss or damage arising therefrom, including the cost of repairing damage, breakdown, malfunction caused by corrosion, furring, pipe scaling, limescale, system debris or frost.
For the latest Terms & Conditions, please see:
www.tritonshowers.co.uk
Triton Showers Triton Road Nuneaton Warwickshire CV11 4NR
Triton is a division of Norcros Group (Holdings) Limited
Customer Service: % 0844 980 0750
Trade Installer Hotline:
www.tritonshowers.co.uk
E-mail: serviceenquiries@tritonshowers.co.uk
0844 980 0730
%
0844 980 0744
Fax:
Extended Warranty AVAILABLE NOW. Call 0844 980 0740 for more details.
8-8-2012
TRITON reserve the right to change product specification without prior notice. E&OE. © TRITON SHOWERS 2012
Loading...