Toshiba TCB-PCIN4E INSTALLATION MANUAL

English
1
INSTALLATION MANUAL Model:TCB-PCIN4E
Output control board
Precautions for Safety
• Read these “Precautions for Safety” carefully before installation work.
• The precautions described below include important items regarding safety. Observe them without fail.Understand the following details (indications a nd symbols) before reading the body text, and follow the instructions.
The meanings of indications
Text set off in this manner indicates that failure to adhere to the
WARNING
CAUTION
• After completion of installation, perform trial operation to check for any problems. Explain method of use and maintenance to the customer by following the descriptions in the manual. Ask customer to keep this Manual at accessible place for future reference.
Only a qualified installer or qualified service person is allowed to do installation work.
If installation is carried out by an unqualified individual, fire or electric shock may result.
Perform installation work reliably according to this installation manual. Incomplete installation may cause electric shock, fire or abnormal operation.
Electrical work must be performed by a qualified installer or qualified service person in accordance with this installation manual. The work must satisfy all local, national and international regulations. Inappropriate work may result in electric shock or fire.
Connect the specified wires firmly and clamp them securely so that external force applied to the wires does not affect the connector pins. Improper wire connection or clamping may result in fire or malfunction.
Do not disassemble, modify, repair or move the product yourself. Doing so may cause fire, electric shock, injury or water leaks.
Ask a qualified installer or qualified service person to do any repairs or to move the product.
1 External View
2 Accessories
No. Part Name Q'ty
Connection cable 1 (for CN511)
1
Connection cable 2 (for CN514)
2
Support to fix the board 4
3
Wire clamp 1
4
Wire clamp fixing screw 1
5
Earth screws 2
6
Binding band A 4
7
Clamp filter 2
8
Binding band B 2
9
directions in the warning could result in serious bodily harm or loss of life if the product is handled improperly.
Text set off in this manner indicates that failure to adhere to the directions in the caution could result in serious bodily injury or damage to property if the product is handled improperly.
WARNING
73 63
1
PJ20
5
C2
C4
D1 D2 D3
C3
69
79
K1
12
OUTPUT1 OUTPUT2 OUTPUT3
MCC-1613-02
K2
K3
34 5 6
Terminal block (M3)
4-4 mm dia. mounting holes
TB1
(4 wires)
(5 wires)
1
1
3 Installation
1. Before starting installation work, be sure to turn the power supply OFF.
2. Install the "Optional PCB" at the position on the electrical components box shown in the figure on
the right.
3. Install the "Optional PCB" at the specified location inside the electrical components box using the
fixing support.
4. There are four mounting holes for the fixing support at specified locations inside the electrical
components box.
5. Connect the connector (PJ20 (green)) on the "Optional PCB" to the connector (CN511 (green) or
CN514 (green)) on the "interface PCB" using the connector cable (provided). (See figure on right.)
6. The cable (provided) is long. Tie it using the binding band.
[PCB Installation Position]
SMMS-i
MMY-MAP080 to 120
MMY-MAP140, 160
Optional PCB
(max. number installed: 2 pcs)
SMMS, SHRM
Optional PCB
Outdoor unit interface PCB
(max. number installed: 1 pcs)
MiNi-SMMS Install this optional P.C. board to the
Screw
Screw
Hook part
Interface P.C. board
Optional P.C. board
• Up to total of two boards Optional PCB (right side)
(max. number installed: 1 pc)
SMMS-i Connector Positions
CN514 (green)
CN511 (green)
Outdoor unit
interface PCB
SMMS, SHRM Connector Positions
CN511 (green)
Outdoor unit
interface PCB
back side of the Interface P.C. board on outdoor unit.
1. If the screw of the position
shown in the figure is removed and an upper right hook is slipped, an interface board will open.
2. Place this P.C. board by using
the support of the electric component box. There are four installation holes to place the support of the electric component box.
MiNi-SMMS Connector Positions
CN511 (green)
Outdoor unit
interface PCB
4 Wiring
1. Tie the output wiring using the
SMMS-i
Optional
7
PCB
9
-a
8
or
1 2
binding band A ( ) at the
8
-b
7
-b
7
9
4 5
[A] Output
wiring
position in the figure on the left. ( -a):Tie the output wiring
7
togerther with other leads. ( -b):Tie the output wiring
7
after passing the upper fixation hole on of the bandling band.
2. Attach the clamp filter () to
the output wiring and connection cable ( or ) as shown in the figure. Use binding band B
()
to fix the clamp filter ()
9 8
to the wirings. * When more than one optional
PC boards are installed, band all the connection cables and attach one clamp filter.
3. Fix the wire clamp () using
the screw holes at location [A] in
7
8
1 2
4
the figure on the left.
SMMS, SHRM
1. Pass the binding band A ( )
7
[B]
[A]
through securing hole [B] shown in the figure on the left and tie the output wiring together with other wiring.
2. Fix the wire clamp () using
the screw () holes at location [A] in the figure on the left.
5
7
4
4 5
Output wiring
MiNi-SMMS
Electric component box
5
4
Grounding ()
6
1. Tie the output wiring with the
wire clamp ().
4
Output wiring
5 Details of Operation, Electrical Wiring Diagram
CAUTION
Output Relay (K1, K2, K3) Contact Specifications
• Output terminals (OUTPUT1, 2, 3) must satisfy the following electrical rating.
• When connecting a conductive load (e.g. relay coil) to loads K1, K2 and K3, insert a surge killer CR (for an AC power supply) or a diode for preventing back electromotive force (for a DC power supply) on the bypass circuit.
<Electrical Rating> 220-240 VAC, 10 mA or more, 1A or less 24 VAC, 10 mA or more, 1 A or less (non-conductive load)
Error / Operation output
Functions
The operation error indication PCB can output operation and error states by connecting to the interface PCB of outdoor units.
Operation
Operation output: The operation indication is output when even one of the indoor units in the system
Error output: The error indication is output when an error has occurred on even one of the
Wiring example
Header outdoor unit
Outdoor unit
interface PCB
SW16
ON
OFF
1
C1 Connector cable 1 () CN511 Connector on interface side (green) K1, K2 Relays L1 Error indication Lamp L2 Operation indication Lamp
is operating.
indoor units or outdoor units in the system.
Optional PCB
C1
CN511
234
PJ20
Locally procured
(See “CAUTION”)
TB1
1
K1
OUTPUT1
2 3
K2
OUTPUT2
4 5
OUTPUT3
6
Shield wire
L1
L2
PS
PS
1
OUTPUT1 Error output OUTPUT2 Operation output PJ20 Connector on optional PCB side PS Power supply unit TB1 Terminal block
* Connect optional boards to the center outdoor unit. * [OUTPUT3] is normally output when power is turned on.
Compressor Operation Output (This function is supported only on the SMMS-i.)
Functions
This function can be applied, for example, to the elapsed operation time count of each compressor mounted on an outdoor unit since the compressor in operation signal can be output externally.
Operation
During compressor operation, the relay of the output terminal corresponding to that compressor turns ON (closes) and turns OFF (opens) when compressor operation stops. As shown in the figure, the output terminals are "OUTPUT1", "OUTPUT2" and "OUTPUT3" from the left compressor facing the front of the outdoor unit.
Wiring example
2
Locally procured
Shield wire
Outdoor unit
C2
Optional PCB
PJ20
TB1
K1
K2
K3
Outdoor unit
interface PCB
SW16
CN514
ON
OFF
1
234
C2 Connector cable 2
1
OUTPUT1
2 3
OUTPUT2
4 5
OUTPUT3
6
()
1 2 3 1 2
(See “CAUTION”)
L1 PS
CTR1
L2 PS
CTR2
L3 PS
CTR3
CN514 Connector on interface side (green) CTR1 Elapsed operation counter 1 CTR2 Elapsed operation counter 2 CTR3 Elapsed operation counter 3 K1, K2, K3 Relays L1, L2, L3 Operation indication LEDs OUTPUT1 Compressor 1 operation output terminal OUTPUT2 Compressor 2 operation output terminal OUTPUT3 Compressor 3 operation output terminal PJ20 Connector on optional PCB side PS Power supply unit TB1 Terminal block
Operating Rate Output (This function is supported only on the SMMS-i.)
Functions
The operation state can be remotely checked since the system operating rate signal can be output externally.
Operation
As shown in the table, each of the output terminals turns ON (relay closes) and OFF (relay opens) according to the system operating rate.
Functions SW16 OUTPUT1 OUTPUT2 OUTPUT3 Operating rate FA
OFF OFF OFF FA=0% ON OFF OFF 0%<FA<20% OFF ON OFF 20%FA<35%
1
234
ON ON OFF 35%FA<50% OFF OFF ON 50%FA<65% ON OFF ON 65%FA<80%
System operating rate output
ON
OFF
bit 1 : ON bit 2 : OFF
OFF ON ON 80%FA<95% ON ON ON 95%FA
Wiring example
Header outdoor unit
Outdoor unit
interface PCB
SW16
ON
CN514
OFF
1
234
Optional PCB
C2
PJ20
C2 Connector cable 2
K1
K2
K3
TB1
1
OUTPUT1
2 3
OUTPUT2
4 5
OUTPUT3
6
()
2
OFF=relay open ON=relay closed
Locally procured
(See “CAUTION”)
MONITOR
Shield wire
CN514 Connector on interface side (green) K1, K2, K3 Relays MONITOR Monitoring device OUTPUT1 Output terminal for each function OUTPUT2 Output terminal for each function OUTPUT3 Output terminal for each function PJ20 Connector on optional PCB side TB1 Terminal block
* Connect optional boards to the center outdoor unit.
CH49961301
Loading...