Schneider Electric IT Corporation Legal Disclaimer
The information presented in this manual is not warranted by the Schneider Electric IT Corporation to be authoritative,
error free, or complete. This publication is not meant to be a substitute for a detailed operational and site specific
development plan. Therefore, Schneider Electric IT Corporation assumes no liability for damages, violations of codes,
improper installation, system failures, or any other problems that could arise based on the use of this Publication.
The information contained in this Publication is provided as is and has been prepared solely for the purpose of evaluating
data center design and construction. This Publication has been compiled in good faith by Schneider Electric IT
Corporation. However, no representation is made or warranty given, either express or implied, as to the completeness or
accuracy of the information this Publication contains.
IN NO EVENT SHALL SCHNEIDER ELECTRIC IT CORPORATION, OR ANY PARENT, AFFILIATE OR
SUBSIDIARY COMPANY OF SCHNEIDER ELECTRIC IT CORPORATION OR THEIR RESPECTIVE
OFFICERS, DIRECTORS, OR EMPLOYEES BE LIABLE FOR ANY DIRECT, INDIRECT,
CONSEQUENTIAL, PUNITIVE, SPECIAL, OR INCIDENTAL DAMAGES (INCLUDING, WITHOUT
LIMITATION, DAMAGES FOR LOSS OF BUSINESS, CONTRACT, REVENUE, DATA, INFORMATION, OR
BUSINESS INTERRUPTION) RESULTING FROM, ARISING OUT, OR IN CONNECTION WITH THE USE
OF, OR INABILITY TO USE THIS PUBLICATION OR THE CONTENT, EVEN IF SCHNEIDER ELECTRIC
IT CORPORATION HAS BEEN EXPRESSLY ADVISED OF THE POSSIBILITY OF SUCH DAMAGES.
SCHNEIDER ELECTRIC IT CORPORATION RESERVES THE RIGHT TO MAKE CHANGES OR UPDATES
WITH RESPECT TO OR IN THE CONTENT OF THE PUBLICATION OR THE FORMAT THEREOF AT
ANY TIME WITHOUT NOTICE.
Copyright, intellectual, and all other proprietary rights in the content (including but not limited to software, audio, video,
text, and photographs) rests with Schneider Electric It Corporation or its licensors. All rights in the content not expressly
granted herein are reserved. No rights of any kind are licensed or assigned or shall otherwise pass to persons accessing this
information.
This Publication shall not be for resale in whole or in part.
Contents
General Information................................................................... 1
Read and adhere to the following important safety considerations when working with this
cooling unit.
DANGER
HAZARD OF ELECTRIC SHOCK, EXPLOSION, OR ARC FLASH
Turn off all power supplying this equipment before working on the equipment. All electrical
work must be performed by licensed electricians. Practice Lockout/Tagout procedures. Do
not wear jewelry when working with electrical equipment.
Failure to follow these instructions will result in death or serious injury.
WARNING
HAZARD FROM MOVING PARTS
Keep hands, clothing, and jewelry away from moving parts. Check the equipment for
foreign objects before closing the doors and starting the equipment.
Failure to follow these instructions can result in death, serious injury, or
equipment damage.
WARNING
DAMAGE TO EQUIPMENT OR PERSONNEL
The equipment is heavy and can easily be tipped. For safety purposes, adequate
personnel must be present when moving this equipment.
Failure to follow these instructions can result in death, injury, or equipment
damage.
CAUTION
HAZARD TO EQUIPMENT OR PERSONNEL
All work must be performed by Schneider Electric authorized personnel.
Failure to follow these instructions can result in injury or equipment damage.
1EcoBreeze System Installation
Inspecting the Equipment
Inspect for missing components. All shipped loose components are identified by part number
and description on the bill of lading. Ensure each item is present before accepting delivery of
the unit.
Filing a claim. If damage has occurred, or if shipped loose parts are missing, report it
immediately to the delivering carrier and note the problem on the receiving copy of the bill of
lading. Failure to do so will result in replacement parts and repairs being billed to the customer.
In case of shipping damage, do not operate the equipment. Keep all packaging for inspection
by the shipping company and contact Schneider Electric.
Storing the equipment before installation
WARNING
DAMAGE TO EQUIPMENT OR PERSONNEL
• Do not remove tension rods until the EcoBreeze™ Frame is placed and secured on
its supports.
• Move the EcoBreeze Frame directly from the truck to its permanent foundation or
supports. If it must be stored temporarily, it must be placed on a flat and level
surface to avoid damage.
• Leave the protective plastic wrap in place until you are prepared to install the
equipment.
Failure to follow these instructions can result in death, serious injury, or
equipment damage.
Heavy: Ensure the lifting equipment has sufficient capacity for the load.
The recommended tools for moving the equipment include the following:
Crane
(Frame,
ductwork)
EcoBreeze System Installation2
Model Identification
Model identification label location
Frames
SKUDescription
ACECFR20101SEn* 6 m (20 ft) ISO Frame 400/3/50
ACECFR20200SEn* 6 m (20 ft) ISO Frame 480/3/60
ACECFR20201SEn* 6 m (20 ft) ISO Frame 600/3/60
ACECFR40101SEn* 12 m (40 ft) ISO Frame 400/3/50
ACECFR40200SEn* 12 m (40 ft) ISO Frame 480/3/60
ACECFR40201SEn* 12 m (40 ft) ISO Frame 600/3/60
*Where n is the number of Modules populating the Frame upon order.
na3462a
Modules
SKUDescription
ACEC101SEEcoBreeze Module 400/3/50
ACEC200SEEcoBreeze Module 480/3/60
ACEC201SEEcoBreeze Module 600/3/60
Other components
SKUDescription
ACECINS100SEFrame install kit
ACECCP100SEEcoBreeze remote interface panel
ACECSJ100SEEcoBreeze screw-jack assembly
3EcoBreeze System Installation
Access Door and Panel Operation
Module access doors and panels have latches with a locking mechanism. Secondary door
latches are provided on doors on compartments that have positive air pressure to prevent the
doors from opening quickly if a door is opened while the unit is in operation.
WARNING
HAZARD OF ELECTRIC SHOCK
To avoid possible personal injury or death, re-engage the access door locking mechanism
after access to a compartment for inspection or service requirements.
Failure to follow these instructions can result in death or serious injury.
na3463a
Frame access panels and the main power enclosure have locking latches that open with a key.
na3584a
EcoBreeze System Installation4
Component Identification
SUPPLY
OWER
BL
ACCESS
COIL
SUPPLY
BLOWER
ACCESS
COIL
SUPPLY
BLOWER
ACCESS
ACCESS
ACCESS
COIL
UPPLY
S
BLOWER
CCESS
A
COIL
ACCESS
ACCESS
na3449a
ItemDescription
EcoBreeze Frame and Module assembly*11
Remote display interface11
Frame electrical panel latch tool44
Module access door latch tool48
Water treatment module signal generator key11
Technical manuals55
Pipe adapter kit (50 Hz only)
3/4 NPT x 3/4 - 14 BSPT (4)
2-in. NPT x 2 - 11 BSPT (1)
* Version shown is the 12 m (40 ft) model.
Esc
Quantity
20 ft
Quantity
40 ft
11
5EcoBreeze System Installation
EcoBreeze Frame and Modules
SUPPLY
BLOWER
ACCESS
Item Description
SUPPLY
BLOWER
ACCESS
COIL
SUPPLY
BLOWER
ACCESS
COIL
ACCESS
ACCESS
ISO corner fittings
Return air inlets
Module anchor brackets
Module
Tension rods and mounts
Screw-jack mounting points
Water drain outlet
Water supply inlets
Frame main power enclosure
Frame power distribution panel
Direct digital controller (DDC)
panel
COIL
SUPPLY
BLOWER
ACCESS
COIL
ACCESS
ACCESS
ns3560a
EcoBreeze System Installation6
Loading...
+ 22 hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.