Schneider A9PTGEXTNP User Manual

3.5 mm
PowerTag Extension Kit A9PTGEXTNP
PLEASE NOTE
b This equipment must be installed and maintained by a qualied electrician in accordance with the appropriate statutory regulations and codes of practice, e.g. Electricity at Work Regulations, BS7671 IET Wiring regulations, etc. b All pertinent state, regional, and local safety regulations must be observed when installing and using this device. b The manufacturer cannot be held responsible for failure to follow the instructions given in this instruction sheet.
WARNING
HAZARD OF ELECTRIC SHOCK, EXPLOSION OR ARC FLASH
b This equipment must only be installed by a qualied person. This operation must only be carried out after reading all the instructions in this document. b NEVER work alone. b Before making the visual inspections, tests or maintenance operations on this equipment, disconnect all electrical power supplies. b Start off with the principle that all circuits are live until they have been completely powered down, tested and labeled. Pay special attention to the design of the power supply
circuit. Take account of all power supply sources, including the possibility of feedback.
b Wear suitable personal protective equipment and respect applicable electrical safety instructions. b Use a Voltage Tester of the appropriate rating.
b Take account of possible hazards. Carefully inspect the work area to check that no tools or objects could have been left inside the equipment.
Failure to follow these instructions can result in death, serious injury, or equipment damage.
1
2
PZ2
Ethernet connector RJ45
A
Extension box enclosure
B
PowerTag neutral distribution block
C
Fuse carrier (2 A fuse tted inside)
D
Acti 9 Smartlink SI D
E
NOTE:
Ensure satisfactory earth continuity between enclosures.
QGH3152601-00 02/2017 1/4
3
NOTE:
b Any 1P PowerTag neutral reference cables shall be connected to the dedicated neutral block contained within the PowerTag Extension b 3P PowerTags do not require a neutral reference connection. b Fit bootlace ferrule to 1P PowerTag neutral cable before screwing into neutral distribution block.
v
C
Kit.
14 mmMCB connection 1...4mm² 2 N.m
NOTE:
b The power supply for the Acti 9 Smartlink SI D shall be taken from one of the outgoing distribution board 1P ways. b Fit bootlace ferrule to L cable from MCB before screwing into fuse carrier.
PZ2
Ethernet connection
54
Technical characteristics:
Schneider Electric Ltd.
Stafford Park 5 Telford, TF3 3BL
www.schneider-electric.co.uk
QGH3152601-00
b Acti 9 Smartlink SI D power supply: 230 V AC ±20 %, 2 A. b Wireless communication:
v Up to 20 PowerTag sensors per Acti 9 Smartlink SI D. b Ethernet connection type: Cat6 STP (RJ45). b Fuse type: 2 A FF 5 x 20 mm M084007P
© 2017 Schneider Electric - All rights reserved.
2/4
Loading...
+ 2 hidden pages