MAINTENANCE Ash container
Maintenance
Ash removal
Placement
On the boiler´s side
Procedure
Check up the ash content in the container, empty it when
necessary.
Maitenance period
When necessaryd
Pos.
MAINTENANCE-01
MAINTENANCE Igniter
Maintenance
Igniter
Placement
On the side of heating boiler
procedure
Unscrew the ignition tube and clean it
Maintenance period
Half a year
Pos.
MAINTENANCE-02
CLEANING Multicyclone
Maintenance
Multicyclone
Placement
Maintenance cover on the side of heating boiler
Procedure
Open the cover plate and clean the multicyclone using
industrial vacuum cleaner
Maintenance period
Quarterly
Pos.
MAINTENANCE-03
MAINTENANCE Ash removal from rost
Maintenance
Ash removal from rost
Placement
On the heating boiler´s back side, near the stocker
Procedure
Open the cover plates, or door and remove the ash from
the rost.
Maintenance period
Quarterly
Pos.
MAINTENANCE-04
MAINTENANCE Cleaning of the
combustion chamber
Maintenance
Combustion chamber UTSK- under stocker
Placement
‚Front side of the heating boiler
Procedure
1. Cleaning of retort and combustion chamber
2. Cleaning of the surface over the fire bricks
Maintenance period
Quarterly
Pos.
MAINTENANCE-05a
MAINTENANCE Cleaning of
combustion chamber
Maintenance
Combustion chamber UTSK- step grate
Placement
‚Front side of the heating boiler
Procedure
3. Cleaning of the combustion surface
4. Cleaning of the surface over the fire bricks
Maintenance period
Quarterly
Pos.
MAINTENANCE-05c
MAINTENANCE Cleaning of burning
grate
Maintenance
Burning grate UTSK- understocker
Placement
Front side of the heating boiler
Procedure
1. Remove the ash from the combustion space
2. Cleaning of the burning grate
Maintenance period
Quarterly
Pos.
MAINTENANCE-06a
MAINTENANCE Cleaning of burning
grate
Maintenance
Burning grate UTSK-Step grate
Placement
Front side of the heating boiler
Procedure
3. Remove the ash from beneath of the step grate
4. Clean the gragesurface and the buring space
Maintenance period
Quarterly
Pos.
MAINTENANCE-06c
MAINTENANCE Cleaing of heat
exchanger
Maintenance
Heat exchanger
Placement
Front side of the heating boiler
Procedure
Clean the heat exchanger using the delivered brush.
Maintenance period
Quarterly
Pos.
MAINTENANCE-07
Pay attention to the flue gas sensor, also when cleaning
MAINTENANCE Cleaning of suction
blowers
Maintenance
Suction blower
Placement
Back side of the heating boiler
Procedure
Clean the suction blower from ash using an industrial
vacuum cleaner.
the flue gas pipe.
Maintenance period
Quarterly
Pos.
MAINTENANCE-08
MAINTENANCE Cleaning of flue gas
tube
Maintenance
Flue gas tube and chimney
Placement
Down the suction blower
Procedure
1. Clean and exhaust the flue gas tube
2. Clean the chimney
Maintenance period
Quraterly
Pos.
MAINTENANCE-09
CLEANING Compressor
Maintenance
Compressor
Placement
In the heating room near the switch box
Procedure
Empty the condensed water vessel on the compressor
Maitenance period
Half a year
Pos.
CLEANING-02
CLEANING
Maintenance
Cleaning
Place
Heating room
Procedure
Cleaning of all motors and blowers
Maintenance period
Half a year
Pos.
CLEANING-03