Panasonic windb-1 installation

Wind Baffle
WINDB-1
Approval: Date: Construction: Unit#: Drawing#:
Reference:
Applications
Mini Split And Mini ECOi Systems
GENERAL: This wind shield is sized so it will fit onto all Panasonic outdoor mini splits and the mini-ECOi models. It is made to be placed on the fan discharge side of the unit. See Fig. 1 below. One wind shield will be used for 9,000 to 36,000 BTU outdoor units. 42,000 BTU and larger outdoor units require two shields.
INSTALLATION PROCEDURES:
1. Remove all the protective film on the clear parts.
2. The pre-drilled holes on baffle will match up with pilot holes on the 26, 30, 36 and 42,000 BTU mini splits, and also the ECOi models.
3. For the 9,000 -24,000 BTU mini splits and the Flexi Multi models some of the pre-drilled holes will not be able to be used.
4. Pre drill 5/16 inch holes into the plastic wind shield flange where necessary and ream them out slightly, with drill, to ensure nylon spacer fits without forcing.
5. Shift the wind shield left/right and/or up/down as needed.
BEFORE DRILLING OR SCREWING INTO THE UNIT, MAKE SURE THERE WILL BE NO CONTACT WITH REFRIGERANT TUBING OR ELECTRICAL WIRES. CHECK FOR CLEARANCE.
Note: Pre-assemble all parts and turn or rotate the assembled parts upside down and then add 1 drop of thread locker to the female nut. Wipe away any excess thread locker before turning over.
CAUTION: Use only mild soap or detergent and water to clean baffle. DO NOT USE ANY CHEMICALS.
Data is Subject to Change.
Panasonic North America Air Conditioning Division
1690 Roberts Blvd., NW, Suite 110 Kennesaw, GA 30144 http://www.panasonic.com/aircon
Loading...