Miele PDR 914 G, PDR 514 G Installation diagram

Installation plan Commercial dryer PDR914/514 G Gas heated
To avoid the risk of accidents or damage to the machine, it is essential to read these instruc­tions before it is installed and used for the first time.
M.-Nr. 11 867 670
Contents
Installation notes ............................................................................................................. 3
Installation requirements ................................................................................................... 3
Electrical connection ......................................................................................................... 3
Gas connection ................................................................................................................. 4
Supply air/exhaust air........................................................................................................ 4
PDR914/514, gas heated................................................................................................ 5
Dimensions........................................................................................................................ 5
Installation ......................................................................................................................... 6
Set up (Standard/Miele base)............................................................................................ 7
Set up (Concrete platform)................................................................................................ 8
Technical data.................................................................................................................. 9
Voltage variants/electrical data ......................................................................................... 9
Gas connection ................................................................................................................. 9
Waste air/gas..................................................................................................................... 9
Air intake............................................................................................................................ 9
Machine data..................................................................................................................... 9
Mounting variants.............................................................................................................. 10
Mounting without base.................................................................................................. 10
Mounting on concrete platform..................................................................................... 10
Optional extras .................................................................................................................. 11
Concrete platform (on site)............................................................................................ 11
2

Installation notes

Installation requirements

The tumble dryer must only be installed and commissioned by Miele Customer Service Department or an authorised dealer.
The tumble dryer must be installed in accordance with all relevant regulations and
standards.
The dryer must only be operated in a room that has sufficient ventilation and which is
frost-free.

Electrical connection

The electrical connection must be established by a qualified electrician.
The electrical connection may only be made to an electrical system provided in accord-
ance with all appropriate local and national legislation, regulations and guidelines. Please also observe the regulations set out by your insurance provider and energy supplier, acci­dent prevention regulations, as well as recognised codes of practice.
Reliable and safe operation of this tumble dryer is only ensured if it has been connected
to the mains electricity supply.
The required supply voltage, power rating and fuse rating can be found on the data plate on the tumble dryer. Ensure that the supply voltage matches the voltage quoted on the data plate before establishing the electrical connection to the tumble dryer.
Connection to a supply voltage other than the one quoted on the data plate can damage the tumble dryer if the voltage is too high.
If more than one voltage is specified on the data plate, the tumble dryer can be conver-
ted for connection to the relevant input voltage. This conversion must be performed by the Miele Customer Service Department or by an authorised dealer. During the conversion, the wiring instructions given on the wiring diagram must be followed.
The tumble dryer can either be hard-wired or connected using a plug-and-socket connec­tion in accordance with IEC60309-1. For a hard-wired connection, an all-pole isolation device must be available at the installation site.
An isolation device is a switch which ensures a contact opening of more than 3mm. These include circuit breakers, fuses and contactors (IEC/EN60947).
If the mains supply cannot be permanently disconnected, the isolation device (including plug and socket) must be safeguarded against being switched on either unintentionally or without authorisation.
Tip: We recommend connecting the tumble dryer to the power supply via a plug and socket so that it is easier to conduct electrical safety checks (e.g. during maintenance or repair work).
The tumble dryer must not be connected to devices such as timers which would switch
it off automatically.
If it is necessary to install a residual current device (RCD) in accordance with local regu­lations, a residual current device typeB (sensitive to universal current) must be used.
PDR914/514 G / Gas heated 3
Installation notes

Gas connection

The gas connection must only be carried out by a registered installation technician in ac­cordance with the applicable national regulations (see installation instructions).
The use of a gas socket is not permitted at the specified heater rating as the flow rate is too low.
The gas heating is configured at the factory in line with the gas specifications on the sticker on the rear of the appliance.
If the gas family is changed, a conversion kit must be requested from the Miele Cus­tomerService Department (please specify the appliance type, serial number, gas family, gas group, gas connection pressure and country of installation). Follow the installation in­structions. This conversion may only be carried out by a registered specialist.

Supply air/exhaust air

The tumble dryer may only be operated when the ducting has been connected and the room is sufficiently ventilated (see installation instructions).
Accessory parts may only be fitted when expressly approved by Miele. If other parts are
used, warranty, performance and product liability claims will be invalidated.
4 PDR914/514 G / Gas heated

Dimensions

906
900 >20>20
Ø 520
650
1400
595
Ø 630
20
1400
752
642
38
67
852
747
1300
1300
747
852
900
906
< 180°
PDR914/514, gas heated
Measurements in millimeters
PDR914/514 G / Gas heated 5
PDR914/514, gas heated
620
280
90
G
501
305
1600
150
305
1600
~ 50
2 x
150
128
200
EL
AL
ZL
ZL
EL
AL
501
G
G
ZL
EL
AL
AL
ZL
161
160
"Z"
"Y"
"Y"
"Z"
XCI
96
31
~350
54
128

Installation

Measurements in millimeters
EL
Electrical connection
G
Gas connection
AL
ZL
XCI
Vented Air intake
XCI-/Connector-Box (option)
6 PDR914/514 G / Gas heated

Set up (Standard/Miele base)

20
1400
Ø 12
1400
UG
UG 900
B
~ 48
55
747
~ 55
127
Ø 10
~ 65
B
1300
55
790
395
754
900
546
B
B
A
A
UG 685
409
818
587
617
B
B
B
B
B
B
A - A
B - B
PDR914/514, gas heated
B
Fittings/drill hole
UG
Miele base
PDR914/514 G / Gas heated 7
PDR914/514, gas heated
20
1400
M6 x 20
1400
BS
900
B
~ 48
>55
BS >900
>50
20
Ø 10
B
BS 1300
>55
790
395
754
BS >900
546
B
B
C
C
747
463
926
546
651
D
D
B
B
B
B
>50
BS
1300
790
55
55
103
395
BS
~55
OFFSHORE
C - C
D - D
~ 48

Set up (Concrete platform)

Measurements in inches
B
Fittings/drill hole
BS
Concrete platform
8 PDR914/514 G / Gas heated

Technical data

Voltage variants/electrical data

Standard connection
Voltage 1N AC 230V
Frequency 50Hz
Total connected load 0.6kW
Fuse rating (on-site) 10A
Connection cable, min. cross-section 3×1.5mm²
Cable gland M20

Gas connection

Nominal heat rating 15kW
Machine-side connection according to ISO 7-1
To connect the gas appliance, a corrugated metal hose line made of stainless steel according to DIN3384 must be used. The shut-off device must be provided on-site. Due to an insufficient flow rate, the use of a gas socket is not permissible with the specified heating output.
Connection thread for natural gas, on-site (internal thread) ½"
Connection thread for liquid gas, on-site (internal thread) ½"
Alternative on-site connection with high-precision steel pipe according to DIN 2391/DIN2393, with smooth pipe end
Min. connection length
Connection pressure according to DIN EN 437. Connection to gas supply must comply with national regulations.
DN12
40mm
½"

Waste air/gas

Max. nominal air flow in vented mode (PDR9xx only) 620m³/h
Max. nominal air flow (PDR5xx only) 620m³/h
Max. permissible pressure loss 280Pa
Connection on machine side (ext. diameter) 150mm
Connection pipe provided on site (int. diameter) 150mm
Max. temperature 80°C
This tumble dryer is a gas-burning machine without a flow-operated safety device with fan downstream of heat exchanger (technical design: B22). Waste gas pipework must be pressure-tight. Waste gas connections should be performed in accordance with national and local regulations and may require approval.
As relative humidity inside the vent ducting can be as high as 100%, suitable measures must be taken to prevent a backflow of con­densate into the machine.

Air intake

Standard connection: Air intake from installation site
Unobstructed air intake into room recommended: (corresponding to 3 times the vent cross-section of machine).
A sufficient supply of fresh air should be ensured to replace the air extracted.
Alternative connection: Ducted air intake (from outside building)
Connector on machine (int. diameter) 161mm
Connection pipe provided on site (ext. diameter) 160mm
Lid removal exposes live components. For safety reasons, the pipe connected for central air intake should be at least 900mm long and secured using two screws.
531cm²

Machine data

Overall machine width 906mm
Overall machine height 1400mm
PDR914/514 G / Gas heated 9
Technical data
Overall machine depth 852mm
Niche width 1250mm
Recommended distance between front of machine and the wall 1300mm
Minimum distance between rear edge of lid and the wall 500mm
Packaging width 1090mm
Packaging height 1526mm
Packaging depth 938mm
Maximum gross volume 1560.2l
Maximum gross weight 173.7kg
Maximum net weight 162.4kg
Max. floor load in operation 1799N
Exhaust air spigot diameter 150mm
Drum diameter 850mm
Drum opening diameter 520mm
Drum depth 480mm
Drum volume 250l
Door opening diameter 520mm
Max. door opening angle 180°
Emission sound pressure level 51 dB(A) re 20 µPa
Sound power level 62
Heat dissipation rate to installation site 3.9MJ/h
Permitted ambient temperature 2–40°C

Mounting variants

Mounting without base

Quantity Screw size
Clamps 2
Wood screws DIN 571 (Ø×lenght) 2 6×40mm
Dowel (Ø×lenght) 2 10×50mm
Machine must be bolted to the floor. Fixing materials for a floating screed floor are to be provided on site.

Mounting on concrete platform

Quantity Screw size
Clamps 2
Wood screws DIN 571 (Ø×lenght) 2 6×40mm
Dowel (Ø×lenght) 2 10×50mm
Machine must be bolted to the floor. Fixing materials for a floating screed floor are to be provided on site.
10 PDR914/514 G / Gas heated
Technical data

Optional extras

Concrete platform (on site)

Minimum width 900mm
Recommended height 100mm
Minimum height 50mm
Minimum depth 900mm
Quality and density of concrete must comply with load. Concrete platform must be firmly secured to floor.
PDR914/514 G / Gas heated 11
Malaysia
Miele Sdn Bhd Suite 12-2, Level 12 Menara Sapura Kencana Petroleum Solaris Dutamas No. 1, Jalan Dutamas 1 50480 Kuala Lumpur, Malaysia Phone: +603-6209-0288 Fax: +603-6205-3768
Miele New Zealand Limited IRD 98 463 631 8 College Hill Freemans Bay, Auckland 1011, NZ Tel: 0800 464 353 Internet: www.miele.com.au/professional E-mail: sales@miele-professional.com.au
New Zealand
Miele Pte. Ltd. 29 Media Circle, #11-04 ALICE@Mediapolis Singapore 138565 Tel: +65 6735 1191, Fax: +65 6735 1161 E-Mail: info@miele.com.sg Internet: www.miele.sg
Singapore
Miele (Pty) Ltd 63 Peter Place, Bryanston 2194 P.O. Box 69434, Bryanston 2021 Tel: (011) 875 9000, Fax: (011) 875 9035 E-mail: info@miele.co.za Internet: www.miele.co.za
South Africa
Miele Appliances Ltd. Showroom 1, Eiffel 1 Building Sheikh Zayed Road, Umm Al Sheif P.O. Box 114782 - Dubai Tel. +971 4 3044 999, Fax. +971 4 3418 852 800-MIELE (64353) E-Mail: info@miele.ae, Website: www.miele.ae
United Arab Emirates
United Kingdom
Miele Co. Ltd., Fairacres, Marcham Road Abingdon, Oxon, OX14 1TW Professional Sales, Tel: 0845 365 6608 E-mail: professional@miele.co.uk Internet: www.miele.co.uk/professional
Miele Australia Pty. Ltd. ACN 005 635 398, ABN 96 005 635 398 1 Gilbert Park Drive, Knoxfield, VIC 3180 Tel: 1300 731 411 Internet: www.miele.com.au/professional E-mail: sales@miele-professional.com.au
Australia
Miele Electrical Appliances Co., Ltd. 1-3 Floor, No. 82 Shi Men Yi Road Jing' an District, 200040 Shanghai, PRC Tel: +86 21 6157 3500, Fax: +86 21 6157 3511 E-mail: info@miele.cn, Internet: www.miele.cn
China Mainland
Miele (Hong Kong) Ltd. 41/F - 4101, Manhattan Place 23 Wang Tai Road, Kowloon Bay, Hong Kong Tel: (852) 2610 1025, Fax: (852) 3579 1404 Email: customerservices@miele.com.hk Website: www.miele.hk
Hong Kong, China
Miele India Pvt. Ltd. 1st Floor, Copia Corporate Suites, Commercial Plot 9, Mathura Road, Jasola, New Delhi - 110025 E-mail: customercare@miele.in, Website: www.miele.in
India
Miele Ireland Ltd. 2024 Bianconi Ave., Citywest Business Campus, Dublin 24 Tel: (01) 461 07 10, Fax: (01) 461 07 97 E-Mail: info@miele.ie, Internet: www.miele.ie
Ireland
Manufacturer: Miele & Cie. KG Carl-Miele-Straße 29, 33332 Gütersloh, Germany
Alteration rights reserved / Publication date: 21.21 M.-Nr. 11 867 670 / 00
PDR914/514 G
Gas heated