Installation plan
Commercial dryer
PDR914/514 EL
Electrically heated
To avoid the risk of accidents or damage to the
machine, it is essential to read these instructions before it is installed and used for the first
time.
en-GB
M.-Nr. 11 863 720
Contents
Installation notes ............................................................................................................. 3
Installation requirements ................................................................................................... 3
Electrical connection ......................................................................................................... 3
Supply air/exhaust air........................................................................................................ 4
PDR914/514, electrically heated ................................................................................... 5
Dimensions........................................................................................................................ 5
Installation ......................................................................................................................... 6
Set up (Standard/Miele base)............................................................................................ 7
Set up (Concrete platform/Offshore)................................................................................. 8
Technical data.................................................................................................................. 9
Voltage variants/electrical data ......................................................................................... 9
Voltage variant 1............................................................................................................ 9
Voltage variant 2............................................................................................................ 9
Waste air............................................................................................................................ 9
Air intake............................................................................................................................ 9
Equipotential bonding (option) .......................................................................................... 9
Peak load energy management (option)............................................................................ 10
Machine data..................................................................................................................... 10
Mounting variants.............................................................................................................. 10
Mounting without base.................................................................................................. 10
Mounting on concrete platform..................................................................................... 11
Mounting on Mielebase................................................................................................ 11
Optional extras .................................................................................................................. 11
Miele base (option) ........................................................................................................ 11
Concrete platform (on site)............................................................................................ 11
2
Installation notes
Installation requirements
The tumble dryer must only be installed and commissioned by Miele Customer Service
Department or an authorised dealer.
The tumble dryer must be installed in accordance with all relevant regulations and
standards.
The dryer must only be operated in a room that has sufficient ventilation and which is
frost-free.
Electrical connection
The electrical connection must be established by a qualified electrician.
The electrical connection may only be made to an electrical system provided in accord-
ance with all appropriate local and national legislation, regulations and guidelines. Please
also observe the regulations set out by your insurance provider and energy supplier, accident prevention regulations, as well as recognised codes of practice.
Reliable and safe operation of this tumble dryer is only ensured if it has been connected
to the mains electricity supply.
The required supply voltage, power rating and fuse rating can be found on the data plate
on the tumble dryer. Ensure that the supply voltage matches the voltage quoted on the
data plate before establishing the electrical connection to the tumble dryer.
Connection to a supply voltage other than the one quoted on the data plate can damage
the tumble dryer if the voltage is too high.
If more than one voltage is specified on the data plate, the tumble dryer can be conver-
ted for connection to the relevant input voltage. This conversion must be performed by the
Miele Customer Service Department or by an authorised dealer. During the conversion, the
wiring instructions given on the wiring diagram must be followed.
The tumble dryer can either be hard-wired or connected using a plug-and-socket connection in accordance with IEC60309-1. For a hard-wired connection, an all-pole isolation
device must be available at the installation site.
An isolation device is a switch which ensures a contact opening of more than 3mm.
These include circuit breakers, fuses and contactors (IEC/EN60947).
If the mains supply cannot be permanently disconnected, the isolation device (including
plug and socket) must be safeguarded against being switched on either unintentionally or
without authorisation.
Tip: We recommend connecting the tumble dryer to the power supply via a plug and
socket so that it is easier to conduct electrical safety checks (e.g. during maintenance or
repair work).
The tumble dryer must not be connected to devices such as timers which would switch
it off automatically.
If it is necessary to install a residual current device (RCD) in accordance with local regulations, a residual current device typeB (sensitive to universal current) must be used.
PDR914/514 EL / Electrically heated 3
Installation notes
Equipotential bonding with a good contact connection should be carried out in accord-
ance with local and national installation regulations. Equipotential bonding with a leakage
current of >10mA should be carried out. Accessories required for equipotential bonding
(washers and nuts) are not supplied with the machine.
Supply air/exhaust air
The tumble dryer may only be operated when the ducting has been connected and the
room is sufficiently ventilated (see installation instructions).
Accessory parts may only be fitted when expressly approved by Miele. If other parts are
used, warranty, performance and product liability claims will be invalidated.
4 PDR914/514 EL / Electrically heated