Loren Cook Gemini Installation, Operation And Maintenance Instructions

Page 1
Gemini
Ceiling and cabinet fans
®
INSTALLATION, OPERATION, AND MAINTENANCE MANUAL
This publication contains the installation, operation and
maintenance procedures for standard units of the Gemini
- Ceiling and Cabinet Fans. Carefully read this publication prior to installation.
Loren Cook Company’s Gemini catalog provides additional information describing the equipment, fan performance, available accessories and specication data.
For additional safety information, refer to AMCA publication 410-96, Safety Practices for Users and Installers of Industrial and Commercial Fans.
All of the publications listed above can be obtained from Loren Cook Company by phoning (417) 869-6474, extension 166; by FAX at (417) 832-9431; or by e-mail at info@lorencook.com.
For information and instructions on special equipment, contact Loren Cook Company at (417) 869-6474.
Rotating Parts & Electrical Shock Hazard:
Disconnect electric power before working on unit.
Follow proper lockout / tagout procedures to ensure the unit cannot be energized while being installed or serviced.
A disconnect switch should be placed near the fan in order that the power can be swiftly cut off, in case of an emergency and in order that maintenance personnel are provided complete control of the power source.
Handling
Lift fan by the outside housing (box) or by the blower
mounting brace. Never lift by the shaft or motor.
Storage
If the fan is stored for any length of time prior to installation, store it in its original shipping crate and protect it from dust, debris and the weather.
Installation
Motor Installation
All Gemini units are shipped with motors mounted at the factory.
Gemini 100 Inline to Ceiling Conversion
The Gemini 100 series can be converted from inline to ceiling by ordering the Inline to Ceiling Conversion Kit from Loren Cook Company (Part Number 797180). The kit includes all parts required, plus detail instructions on how to convert the Gemini 100.
Gemini 100 Ceiling to Inline Conversion
The Gemini 100 series can be eld converted from ceiling to inline by following these steps:
1. Remove and discard the inlet box end plate.
2. Install the inline cover panel with sheet metal screws as shown on the following page.
Ceiling to Inline Conversion Kit can be ordered from Loren Cook Company (Part Number 797181), or fabricate the required part using the following sketch.
Grounding is required. All eld-installed wiring must be completed by qualied personnel. All eld installed wiring must comply with National Electric Code (NFPA 70) and all applicable local codes.
Failure to follow these instructions could result in death or serious injury.
Receiving and Inspection
Carefully inspect the fan and accessories for any
damage and shortage immediately upon receipt of fan.
Turn the wheel by hand to ensure it turns freely and does not bind.
Inspect dampers (if included) for free operation of all moving parts.
Remove mounting brackets from packing insert & install mounting brackets (Gemini 100 only).
Remove shipping tape.
Record on the Delivery Receipt any visible sign of damage.
Gemini 100
1
Page 2
Exhaust
Duct Collar
Side
Panel
Intake
Outlet
Box
Mounting
Brackets
SEE NOTE
Mounting
Bracket
Grille
Screw
Figure 1
s
atte
Inline Cover Panel
18 Ga. Galvanized Steel
14-1/16
11-15/16
1-7/16
Formed View
16-3/4
13-15/16
Break up at 90
Flat P
rn View
1-3/8
11-15/16
13-5/16
Direction of Discharge (200-900 Series)
The duct collar (damper frame), for fastening a standard duct, is located so discharge will be from the top, as shown in gure 1. When discharge from the side is desired, follow these steps:
1. Remove the side panel and install with the duct collar in the side position, as shown in gure 2.
2. Move the mounting bracket from the top discharge to the side discharge position for securing the housing to the joists. See in gure 2.
Fan Installation
1. Adjust housing, using the adjust mounting bracket provided, to allow for the thickness nished ceiling and grille. Refer to gure 3. If a unit is furnished with lters allow 3/8” for lters. Refer to gure 4.
2. Fasten duct work to the outside of the duct collar (damper frame) using sheet metal screws. Make sure sheet metal screws are placed where they do not interfere with damper operation.
3. Fasten the housing to the bottom of the joists through the holes provided in the mounting bracket. Refer to gures 1 and 2.
For Ceiling Radiation Damper Installation see separate document “Gemini/CRD Installation Supplement.”
Figure 2
Side
Panel
Mounting
Brackets
Intake
Duct Collar
Exhaust
Side Discharge
Figure 3. Note: Allow for ceiling thickness. Suggested Installation: Unit without lter.
Figure 4 Note: Allow for ceiling thickness. Suggested Installation: Unit with lter.
Mounting
SEE NOTE
Allow 3/8"
for filter
Screw
Bracket
Optional Filter
Grille
2
Page 3
White (Common) Wire
Red (Low Speed) Wire
White (Common) Wire
Black (High Speed) Wire
Plug options
Notice! Do not install above or inside shaded area
Gemini 200 - 300 and 600 - 700 Series:
White Line
45
Cooking
Equipment
45
Floor
Wiring Installation
All wiring should be in accordance with local ordinances and the National Electrical Code, NFPA 70. Ensure the power supply (voltage, frequency, and current carrying capacity of wires) is in accordance with the motor nameplate. Refer to Wiring Diagrams.
Lock off all power sources before unit is wired to power source.
Follow the wiring diagram in the disconnect switch and the wiring diagram provided with the motor. Correctly label the circuit on the main power box and always identify a closed switch to promote safety (i.e., red tape over a closed switch).
Note: Insulate Unused Leads. Fan plug box is designed for single speed operation, using an FSC to vary speed if required. Do not wire to more than two leads.
Black (High)
Red (Low)
Line
Electrical Shock & Fire Hazard:
Insulate Unused Lead
Failure to follow these instructions could result in death or serious injury.
Gemini 400 - 500 Series:
White Line
Black Line
Gemini 800 - 900 Series:
White Line
Black (High)
Blue (Medium)
Red (Low)
Line
Wiring Diagrams
Gemini 100 Series:
Snap either the red wire, low-speed plug or the black wire, high-speed plug into the eld wiring compartment as shown. Low speed: Connect red and white wires to line. Red wire, low-speed plug is for Model 122, 142, 162 and 182. High speed: Connect black and white wires to line. Black wire, high-speed plug is for Model 124, 144, 164 and 184.
Electrical Shock & Fire Hazard:
Insulate Unused Leads Separately
Failure to follow these instructions could result in death or serious injury.
Gemini 1000:
1 PH / 60 HZ / 115V
MARATHON 6.0 AMPS
Purple
White
Yellow Orange
Brown
1 PH / 60 HZ / 115V
MAGNETEK 8.0 AMPS
Black
White
Red Blue
Orange
Line 1
Line 2
Insulate
Line 1
Line 2
Insulate
Gemini 1000 is continued on the next page.
1 PH / 60 HZ / 208-230 V
MARATHON 2.8-3.0 AMPS
Purple
Yellow
Brown Orange
White
1 PH / 60 HZ / 208-230 V
MAGNETEK 4.1 AMPS
Purple
Yellow
Blue Orange White
Line 1
Line 2
Insulate
Insulate
Insulate
Line 2
Line 1
3
Page 4
T4
2
3
2
3
2
1
3
e
e
e
P4
T5
P6 T6
P6
T4
T7
T6
T9 T5
T8
3 PH / 60 HZ / 208-230 V MARATHON 2.2-2.0 AMPS MAGNETEK 2.2-2.0 AMPS
Insulate
Insulate
Insulate
3 PH / 60 HZ / 460 V MARATHON 1.0 AMP MAGNETEK 1.0 AMP
Insulate
Insulate
Insulate
T1
T7
T2
T8 T3
T9
T1
T2
T3
P4 P5
P6
Line 1
Line
Line
Line 1
Line
Line Insulate Insulate
Insulate
FSC:
Fan
Time Delay Switch:
light
Fan
FSC
Red
Blue
Switch
White
Black
White Black
Gemini 2000:
1 PH / 60 HZ / 115V
MARATHON 10.8 AMPS
Purple
Brown
Blue White
Black
1 PH / 60 HZ / 115 V
LEESON 10.2 AMPS
P1
P2
T3 T2
T4 T5 T5
T4
P4
T5
P6 T6
P6
T4
T7
T6
T9 T5
T8
Line 1
Insulate
Line 2
Line 1
Insulate
Line 2
3 PH / 60 HZ / 208-230 V
MARATHON 4.1-4.2 AMPS
LEESON 3.4 AMPS
Insulate
Insulate
Insulate
3 PH / 60 HZ / 460 V
MARATHON 2.1 AMPS
LEESON 1.7 AMPS
Insulate
Insulate
Insulate
1 PH / 60 HZ / 208-230 V
MARATHON 6.0-5.4 AMPS
Orange
Brown
Blue White
Black
1 PH / 60 HZ / 208-230 V
LEESON 5.2 AMPS
P1
P2
T3 T2 T4
T1
T7
T2
T8 T3
T9
T1
T2
T3
P4 P5
T6
Insulate
Insulate
Insulate
Insulate
Insulat Insulat
Insulat
Line 1
Line 2
Line 1
Line 2
Line 1
Line 2
Line 3
Line
Line
Line
Final Installation Steps
1. Inspect fasteners and setscrews, particularly fan mounting fasteners, and tighten as required.
2. Inspect for correct amperage and voltage with an ammeter and voltmeter.
3. Ensure blower is secured to duct work.
4. Ensure all accessories are installed.
5. Inspect wheel-to-inlet clearance. Make sure wheel does not rub against the inlet.
6. Test the fan to be sure the rotation is the same as indicated by the arrow marked Rotation.
Grille installation is described after the operation and inspection sections.
Operation
Pre-Start Checks
1. Lock out all the primary and secondary power sources.
2. Inspect fasteners and setscrews, particularly those used for mounting the fan, and tighten if necessary.
3. Inspect motor wiring.
4. Ensure fan and ductwork are clean and free of debris.
5. Test the fan to ensure the rotation of the wheel is the same as indicated by the rotation label.
6. Restore power to unit.
Start Up
Before attaching the grille, turn the fan on and inspect
for the following:
Direction of rotation.
Excessive vibration.
Unusual noise.
Motor noise.
Improper motor amperage or voltage.
If a problem is discovered, immediately shut off the fan. Lock out all electrical power and check for the cause of the trouble — refer to the ‘Troubleshooting’ section.
4
Page 5
Inspection
Inspection of the fan should be conducted at the rst 30 minute interval of satisfactory operation. During the inspection, stop the fan and inspect as per directions below.
Inspect bolts, setscrews, and motor mounting bolts.
Adjust and tighten as necessary.
Grille Installation
Attach the grille by hand-tightening the knurled screws. When the unit is furnished with a lter, place the knurled screws through the hole in the grille. Install the lter through the holes provided in the lter frame.
Maintenance
Establish a schedule for inspecting all parts of the fan. The frequency of inspection depends on the operating conditions and location of the fan.
Fans exhausting contaminated air (airborne abrasives) should be inspected every three months.
Regular inspections are recommended for fans exhausting non-contaminated air.
It is recommended the following inspections be conducted twice per year.
Inspect bolts and setscrews for tightness. Tighten as necessary.
Inspect for cleanliness. Clean exterior surfaces only. Removing dust and grease on motor housing assures proper motor cooling.
Access
Gemini 100: To inspect, clean or repair refer to gure 6 and follow
these steps:
1. Remove grille.
2. Remove blower assembly from housing:
1. Disconnect the motor from electrical supply
2. Remove the mounting bolts on the inlet plate assembly and remove the motor/wheel assembly
3. Remove the blower wheel with an allen wrench
Gemini 200 - 700 series To inspect, clean, or repair, refer to gure 7 and follow these steps:
1. Remove grille.
2. Remove blower assembly from housing:
1. Disconnect the motor from electrical supply.
2. Remove mounting bolts.
3. Slide discharge ange out of spring clip and remove motor/blower assembly from box.
3. Remove inlet ring from blower housing.
4. Remove blower wheel with an allen wrench.
Blower Mounting Brace
Wheel
Mounting Bolts
Unit
Mounting
Bracket
Adjustment
Wiring Box
Duct Collar
Bolts
Motor
Damper
Blade
Electrical Supply Junction Box & Cover
Grill Mount Holes
Mounting Bolts (4)
Inlet Plate
5
Page 6
Gemini 800 - 2000 series:
(Ensure proper clearance between wheel and inlet ring)
To inspect, clean, or repair, refer to gure 8 and follow these steps:
1. Remove grille.
2. Remove blower assembly from housing:
1. Disconnect the motor from the electrical supply.
2. Remove motor plate bolts.
3. Slide motor plate and remove motor/blower assembly from box.
3. Remove inlet rings from blower housing (both sides).
4. Mark the wheel and housing to ensure correct replacement of blower wheels (one is clockwise and the other is counter-clockwise), then remove the blower wheels with an allen wrench.
Wheel
Blower Housing
Mo tor Plate
Motor Plate B olts
2. Poor fan inlet conditions. There should be a straight clear duct at the inlet.
3. Improper wheel alignment.
4. Damper held shut by tape.
5. Screw attaching duct work to collar interfering with damper operation.
Excessive Vibration and Noise
1. Damaged or unbalanced wheel.
2. Speed too high.
3. Incorrect direction of rotation. Make sure the fan rotates in same direction as the arrows on the motor or belt drive assembly.
4. Motor needs lubrication or replacement.
5. Fan surge.
Overheated Motor
1. Motor improperly wired.
2. Incorrect direction of rotation. Make sure the fan rotates in same direction as the arrows on the motor or belt drive assembly.
3. Cooling air diverted or blocked.
4. Improper inlet clearance.
5. Incorrect fan RPMs.
6. Incorrect voltage.
Motor
Inlet Ring
Reassembly
Simply reverse the disassembly instructions. Make sure the wheels do not rub on the inlet rings. When replacing the motor, make sure the motor and wheels are properly aligned with the blower housing.
Notice! Ensure that the blower discharge ange is secured in slot of the cabinet on Gemini 200 - 700
series.
Motor Bearings
Motor bearings are pre-lubricated and sealed. Under normal conditions they will not require further maintenance for a period of ten years.
Motor Services
Should the motor prove defective within a one-year period, contact your local Loren Cook representative or your nearest authorized electric motor service representative
Troubleshooting
Problem and Potential Causes:
Low Capacity or Pressure
1. Incorrect direction of rotation. Make sure the fan rotates in same direction as the arrows on the motor or belt drive assembly.
6
Page 7
Gemini 100 Parts List
1
2
3
4
5
6
7
8
9
10
Air Flow
11
11
Gemini 200 - 900 Parts List
Parts Number
1 Inlet Box End Plate
(Ceiling only)
2 Housing/Scroll
3 Field Wiring Compartment
4 Motor
5 Tinnerman Clip (Grill)
6 Mounting Bracket
7 Backdraft Damper
8 Wheel
9 Motor Mount/Inlet
10 Inlet Box
11 Grille
Parts Number
1 Backdraft
Gemini 200 ­700
Damper
Gemini 800 ­900
Backdraft
Dampers (2)
2 Damper Frame Damper Frame
(2)
3 Mounting Bracket
(2)
Mounting Bracket
(2)
4 Wheel Wheel (2)
5 Grille (Ceiling
and Wall)
Grille (Ceiling
and Wall)
6 Blower Housing Blower Housing
(2)
7 Motor Motor
8 Insulation Insulation
9 Cabinet Cabinet
10 Cabinet Side
Cover
1
2
Cabinet Side
Cover
4
Air Flow
3
10
6 7
5
8
9
7
Page 8
Gemini 1000 - 2000 Parts List
Parts Number
1 Grille (ceiling and wall)
2 Backdraft Damper (2)
3 Wheel (2)
4 Blower Housing (2)
5 Motor
6 Insulation
7 Mount Brackets (2)
8 Cabinet
9 Cabinet Side Cover
2
1
4
Gemini 200 - 700
8
5
6
Limited Warranty
Loren Cook Company warrants that your Loren Cook fan was manufactured free of defects in materials and workmanship, to the extent stated herein. For a period of one (1) year after date of shipment, we will replace any parts found to be defective without charge, except for shipping costs which will be paid by you.
This warranty is granted only to the original purchaser placing the fan in service.
This warranty is void if the fan or any part thereof has been altered or modied from its original design or has been abused, misused, damaged or is in worn condition or if the fan has been used other than for the uses described in the company manual. This warranty does not cover defects resulting from
3
9
normal wear and tear.
To make a warranty claim, notify Loren Cook Company, General Ofces, 2015 East Dale Street, Springeld, Missouri 65803-4637, explaining in writing, in detail, your complaint and referring to the specic model and serial numbers of your fan. Upon receipt by Loren Cook Company of your written complaint, you will be notied, within thirty (30) days of our receipt of your complaint, in writing, as to the manner in which your claim will be handled. If you are entitled to warranty relief, a warranty adjustment will be completed within sixty (60) business days of the receipt of your written complaint by Loren Cook Company.
This warranty gives only the original purchaser placing the fan in service specically the right. You
7
may have other legal rights which vary from state to state.
Corporate Ofces 2015 E. Dale Street Springeld, MO 65803 Phone 417-869-6474 Fax 417-862-3820 lorencook.com
8
Gemini IOM - May 2011
Loading...