Life Fitness 897104 User Manual

897104 WEIGHT STACK OPTION
ASSEMBLY INSTRUCTIONS
Part # 6819801 Revision: 2/17/991
IMPORTANT NOTES
WELCOME TO THE WORLD OF Serious steel!
Please note:
* Thank you for purchasing the Parabody 897104 WEIGHT STACK OPTION. Please read
these instructions thoroughly and keep them for future reference. This product must be as­sembled on a flat, level surface to assure its proper function.
We recommend cleaning your product (pads and frame) on a regular basis, using warm soapy water. Touch-up paint can be purchased from your Parabody customer service representative at (800) 328-9714.
There is a risk assumed by individuals who use this type of equipment. To minimize risk, please follow these rules:
1. Inspect equipment daily . T ighten all loose connections and replace worn parts immediately. Failure to do so may result in serious injury.
2. Do not allow minors or children to play on or around this equipment.
3. Exercise with care to avoid injury .
4. If unsure of proper use of equipment, call your local Parabody distributor or call the Parabody customer service department at (800) 328-9714.
5. Consult a physician before beginning any exercise program.
T ools Required for Assembly
* 3/4” wrench * 9/16” wrench * 5/32 Allen wrench * Ratchet with 3/4” and 9/16” sockets * Adjustable wrench * Tape measure
Bolt Length Ruler
NOTE: BOL T LENGTH IS MEASURED FROM THE UNDERSIDE OF THE HEAD OF THE BOLT .
BOL T LENGTH RULER:
1/2 1/2 1/2 1/2 1/2 1/2
0
1
BOLT LENGTH
2
345
2
6
PARTS LIST
KEY
PART #
1 2 3 4 5 6 7 8
9 10 11 12 13
6xxxx 6819403 6819703 6577801 6284501 3116201 6660101 6692601 3103302 6214401 6236701 3102901 3102922
FIGURE 1
DESCRIPTION
ST ACK BASE
ST ACK BOOM
1-3/4” X 9-3/8” TUBE
77-1/4” GUIDE ROD
20 HOLE WEIGHT ST ACK SHAFT
3-1/2” PULLEY
129-1/2” CABLE
3 X 2” END CAP
13/16” SHAFT COLLAR
WEIGHT ST ACK SELECTOR PIN
1-3/4” SQ. END CAP
3/8 X 1-1/4” BOL T 3/8 X 2-3/4” BOL T
QTY
1 1 1 2 1 2 1 4 2 1 1 1 2
TOP BOOM
KEY
14 15 16 17 18 19 20 21 22 23 24 25 26
PART #
6480301 3102501 3102802 3102953 3102918 3102502 3102801 3108002 6595201 6382301 6714601 6214501 6198501
DESCRIPTION
3/8” FLANGE SP ACER
3/8” W ASHER
3/8” LOCK NUT 1/2 X 2-3/4” BOL T 1/2 X 3-1/4” BOL T
1/2” W ASHER
1/2” LOCK NUT
WEIGHT ST ACK CUSHION
GUIDE ROD BUSHING
WEIGHT PLA TE BUSHING (10 CT)
HEAD PLA TE
WEIGHT PLA TE
WEIGHT ST ACK LABELS (1-25)
QTY
4 1 2 1 1 2 2 2 2 4 1
20
1
CABLE
1/4” QUICK LINK
CARRIAGE
STEP 1:
• Remove the CABLE and the 1/4” QUICK LINK from the CARRIAGE as shown in FIGURE 1.
• Remove CABLE and the 1/4” QUICK LINK from the TOP BOOM as shown in FIGURE 1 and discard. (NOTE: PULLEYS may have to be
loosened or removed to allow CABLE to pass through.)
3
FIGURE 2
TOP BOOM
UPPER
CROSS
SUPPORT
3/8 X 4”
1/2 X 2-1/2”
1/2 X 3”
3/8 X 2-3/4”
UPRIGHT FRAME
STEP 2:
LOOSEN the TOP BOOM from the UPRIGHT FRAME by removing one 1/2 X 2-1/2” BOL T , one 1/2 X 3” BOL T , one 3/8 X 2-3/4” BOL T ,
two 1/2” WASHERS, one 1/2” LOCK NUT, and one 3/8” LOCK NUT as shown in FIGURE 2.
LOOSEN the TOP BOOM from the UPPER CROSS SUPPORT by removing two 3/8 X 4” BOL TS, four 3/8” WASHERS and two 3/8”
LOCK NUTS. See FIGURE 2.
REMOVE TOP BOOM.
2” SQ. END CAP
CARRIAGE
UPRIGHT FRAME
FIGURE 3
STEP 3:
• Remove and discard one 2” SQ. END CAP from the end of the UPRIGHT FRAME as shown in FIGURE 3.
• Slide the CARRIAGE off the UPRIGHT FRAME and discard as shown in FIGURE 3.
1/2 1/2 1/2 1/2 1/2 1/2
0
1
2
345
4
6
11
3
22
FIGURE 4
20
19
1/2 X 2-3/4” 17
2
8
STEP 4:
• Insert two 3 X 2” END CAPS (8) into the ends of the ST ACK BOOM (2) as shown in FIGURE 4.
• Insert two GUIDE ROD BUSHINGS (22) into the tubes on the STACK BOOM (2) as shown in FIGURE 4.
SECUREL Y assemble the 1-3/4 X 9-3/8” TUBE (3) to the ST ACK BOOM (2) using one 1/2 X 2-3/4” BOL T (17), two 1/2” W ASHERS (19),
and one 1/2” LOCK NUT (20) as shown in FIGURE 4.
• Insert one 1-3/4” END CAP (11) into the 1-3/4 X 9-3/8” TUBE (3) as shown in FIGURE 4.
1
FIGURE 5
STEP 5:
Insert two 3 X 2” END CAPS (8) into the ends of the ST ACK BASE (1) as shown in FIGURE 5. 5
8
UPRIGHT FRAME
20
18 1/2 X 3-1/4”
1
FIGURE 6
STEP 6:
SECUREL Y assemble the ST ACK BASE (1) to the bottom of the UPRIGHT FRAME using one1/2 X 3-1/4” BOL T (18) and one 1/2” LOCK
NUT (20) as shown in FIGURE 6.
23
25
FIGURE 7
STEP 7:
Snap two WEIGHT PLA TE BUSHINGS (23) into the top of all twenty WEIGHT PLA TES (25) as shown in FIGURE 7.
1/2 1/2 1/2 1/2 1/2 1/2
0
1
2
345
6
6
24
15
3/8 X 1-1/4” 12
4
9
STEP 8:
• Insert two GUIDE RODS (4) into the ST ACK BASE (1) as shown in FIGURE 8. Lubricate the GUIDE RODS (4) with a slicon or teflon spray that is available at most hardware stores.
• Slide two WEIGHT STACK CUSHIONS (21) down over the GUIDE RODS (4). See FIGURE 8.
5
25
26
21
• Using EXTREME CARE slide twenty WEIGHT PLA TES (25) down over the GUIDE RODS (4) with the key-hole facing as shown in FIGURE 8.
• Securely assemble the 20 HOLE SELECTOR SHAFT (5) to the HEAD PLATE (24) using one 3/8 X 1-1/4” BOL T (12) and one 3/8” WASHER (15). (Note: The bolt hole in the HEAD PLATE
(24) should be on top.)
• Carefully Slide the HEAD PLA TE ASSEMBL Y (5 & 24) down over the GUIDE RODS (4) onto the weight stack as shown in FIGURE 8.
• Slide two 13/16” SHAFT COLLARS (9) over the GUIDE RODS (4) as shown in FIGURE 8.
• Apply one set of WEIGHT ST ACK LABELS ­1-25 (26) to each WEIGHT PLA TE (25) as shown in FIGURE 8.
1
FIGURE 8
7
FIGURE 9
2
UPRIGHT
FRAME
4
STEP 9:
• Slide the ST ACK BOOM (2) over the GUIDE RODS (4) and inside the tube on the UPRIGHT FRAME as shown in FIGURE 9.
FIGURE 10
TOP BOOM
UPPER CROSS
SUPPORT
1/2 X 3”
3/8 X 2-3/4”
1/2 X 2-1/2”
9
UPRIGHT
FRAME
3/8 X 4”
STEP 10:
LOOSLY assemble the TOP BOOM to the UPRIGHT FRAME using the previously removed 1/2 X 2-1/2” BOL T , one 1/2 X 3” BOL T ,one
3/8 X 2-3/4” BOL T , two 1/2” WASHERS, one 1/2” LOCK NUT, and one 3/8” LOCK NUT as shown in FIGURE 10.
LOOSEL Y assemble the TOP BOOM to the UPPER CROSS SUPPOR T using two previously removed 3/8 X 4” BOLTS, four 3/8”
W ASHERS, and two 3/8” LOCK NUTS. See FIGURE 10.
• Slide the 13/16” SHAFT COLLARS (9) to the top of the GUIDE RODS (4) and SECURELY tighten the SHAFT COLLAR (9) set screws.
See FIGURE 10.
SECURELY tighten all connections made up to this point.
1/2 1/2 1/2 1/2 1/2 1/2
0
1
2
345
8
6
FIGURE 11
Make sure CABLE
is routed over bolt!
STEP 1 1:
• Route the 129-1/2” CABLE (7) through the TOP BOOM and the ST ACK BOOM (2) as shown in FIGURE 11.
3/8 X 2”
TIGHTEN any LOOSENED PULLEY connection after CABLE has been routed.
FIGURE 12
14
3/8 X 2-3/4” 13
6
7
16
2
STEP 12:
SECUREL Y assemble two 3-1/2” PULLEYS (6) to the STACK BOOM (2) using two 3/8 X 2-3/4” BOL TS (13), four 3/8” FLANGE SP ACERS (14), and two 3/8” LOCK NUTS (16) as shown in FIGURE 12. (NOTE: Make sure the cable is routed over all the pulleys.)
TIGHTEN any LOOSENED PULLEY connection after CABLE has been routed.
9
FIGURE 13
7
!IMPORT ANT!
SECUREL Y
TIGHTEN
JAM NUT
5
24
10
STEP 13:
• Screw the threaded end of the CABLE (7) approximately 3/4” into the end of the 20 HOLE SELECTOR SHAFT (5) and tighten jam
nut securely. See FIGURE 13.
• Insert the WEIGHT ST ACK PIN (10) into the WEIGHT ST ACK as shown in FIGURE 13.
• If the HEAD PLA TE (24) does not sit on top of the first WEIGHT PLATE (25), push the head plate down, insert the SELECTOR PIN
(10) and perform several repetitions on the machine. This will relax the cable system and prevent the HEAD PLA TE (24) from lift ing up.
• If after completing the previous step the HEAD PLATE (24) still does not sit on top of the first WEIGHT PLA TE (25) or if there is
excess slack in the cable system, adjust the threaded end of the CABLE accordingly and retighten the jam nut.
Thank you for purchasing the Parabody 897104 WEIGHT ST ACK OPTION. If unsure of proper use of equip­ment, call your local Parabody distributor or call the Parabody customer service department at (800) 328-9714.
1/2 1/2 1/2 1/2 1/2 1/2
0
1
2
345
10
6
Loading...