Amber
INSTRUCTIONS FOR 5K282 WARNING LIGHT KIT
7
6
Amber
1
5
8
7
1
2
4
8
3
2
3
4
10
9
FRONT
WARNING LAMP ASSEMBLY
Assemble a 4K869 Bracket Weldment to the right side of the machine center frame. Attach to outer
surface of front frame tube with ½” U-bolt, lockwashers, and nuts as illustrated above. Assemble
the other Bracket Weldment in similar fashion on the left side of the machine. (Note: On the left
side of the machine the bracket weldment needs to be assembled to the front frame tube on its
inside surface). Attach lamp assemblies with fasteners shown (Amber facing forward; Red and Amber
facing rearward with Amber in the outermost position).
Connect the “Wishbone” wiring harness ends to the connectors on the lamp assemblies. (Important:
wires are color coded on wishbone harness. Connect end with yellow wire to left side lamp assembly.
Connect end with green wire to right side lamp assembly). Run wishbone harness wires along front
frame member to the center of machine.
Run “Straight Section” wiring harness from front of the drawbar, along the hydraulic lines and over
to the wishbone harness connector at the center of the machine. Then assemble the straight section
harness connector to the wishbone harness connector. All wires must be firmly attached to the machine
frame members or hydraulic lines so they don’t droop or become torn loose by field debris. Use plastic
cable ties and electrical tape to secure all wiring.
0912 5K284
5K282 - Warning Light Kit Parts List
ITEM PART NUMBER DESCRIPTION
QTY
1 4K869 BRACKET WELDMENT 2
2 3J562 U-BOLT,1/2-13 X 4 9/16 X 5-1/2 2
3 1C109 WASHER, LOCK 1/2 ZP 4
4 1C390 NUT HEX 1/2-13 ZP 4
5 4K772 LH DUAL LAMP (002600) 1
6 4K773 RH DUAL LAMP (002601) 1
7 4K782 MACHINE SCREW (1/4-20 X 1-1/4, ZP) 8
8 6J150 NUT FLANGE LOCK 1/4-20 GRF ZP 8
9 4K864 AG HARNESS - 25’ (002425) 1
10 4K780 10’ WISHBONE AG HARNESS (2510) 1
11 9D674 PLASTIC CABLE TIE 10
12 9D851 PLASTIC CABLE TIE 4
13 5K284 INSTRUCTION SHEET 1
0912 1-800-423-4320 5K284
Landoll Corp.