Landoll 4K647 User Manual

4K647
V-BELT INSTALLATION FOR FLAIR SHREDDER
TO CHECK PULLEY ALIGNMENT
Straight Edge
Lay straight edge against both pulleys. Straight edge should touch on both edges of each pulley. It may be necessary to slide the pulley in or out of the shaft, as well as move the gearbox to properly align the belts.
TO CHECK PROPER BELT TENSION ON MODELS
WITH MULTIPLE ā€œCā€ SECTION BELTS
1-1/4
Force
1. Using spring scale at right angles to the center of the span, apply a force to one belt large enough to deflect the belt 1-1/4ā€.
2. The force required should be about 20 lbs. For a new belt that is being tightened for the first time the force required for 1-1/4ā€ deflection should be 30 lbs.
3. At the end of 2 - 4 hours of operation the should be retightened to the normal tension.
4. After 24 - 48 hours the belt tension should be rechecked. Either too high or too low a belt tension will shorten belt life.
Loading...