Kohler K-77123T, K-77125T Installation Instructions Manual

-1-
JUTE
INSTALLATION INSTRUCTIONS
CABINET
K-77123T/K-77125T
BEFORE YOU BEGINBEFORE YOU BEGIN
·
·
·
·
·
·
·
Turn off the water supply. The pluming installation must comply with Water Supply Regulations/Bye-laws, Building Regulations or any particular regulations and practices, specified by the local water company or water undertakers. The installation should be carried out by a plumber. Before installation carefully inspect the new fixture for any signs of damage.
please leave instructions for the
consumer.
JUTE bathroom cabinet adopts E1 grade natural black walnut wood-based panel of high quality. With further processing, its harmful emission is less than 1.5mg/L.
· This product complies with GB 24977-2010.
·
·
·
·
·
·
·
-
E1
1.5mg/L
· GB 24977-2010
ORDERING INFORMATION
This installation covers the following products in the JUTE range:
JUTE Cabinet 914mm........................................K-77125T
JUTE Cabinet 1220mm......................................K-77123T
914mm.............................................K-77125T
1220mm...........................................K-77123T
SAFETY WARNINGS
Kohler products are precision-engineered and should give continued superior and safe performance, provided:
1. They are installed, commissioned, operated and maintained in accordance with the recommendations given in this Manual.
2. Periodic attention is given, as necessary, to maintain the product in good functional order. Recommended guidelines are given in the section.
Carefully inspect the new fixture for any signs of damage.
When installing Kohler Products, manufacturers guidelines for power tool safety should be followed.
MAINTENANCE
1.
2.
KOHLER CHINA INVESTMENT CO., LTD NO.158, JIANG CHANG SAN ROAD,
ZHABEI DISTRICT, SHANGHAI, PRC POST CODE: 200436
( ) 158 200436
©©Copyright Kohler China Investment Co., Ltd. 2016
2016
1282794-T01-A
-2-
ROUGHING-IN
UNIT : mm
K-77125T
Cabinet 914mm
914mm
K-77123T
Cabinet 1220mm
1220mm
INSTALLATION
A. Install Washbasin Cabinet
Install the services. Hot (H) and Cold (C) inlets must be connected to the correct inlet pipes. Install the drain in accordance with the manufacturer's instructions. We suggest using P-trap drain. Connect P-trap pipe with washbasin drain.
Make sure a watertight seal exisits on all
washbasin drain connections.
Provide access to the plumbing
connections for future plumbing maintenance.
The hot and cold water supplies must be installed
with isolating valves.
CAUTION !
CAUTION !
NOTE
A.
(H) (C)
P
Fig.2
2
Reference Value
Kohler reserves the right to change marked dimensions without prior notice.
Fig.1
1
914
1220
556
556
495
495
1282794-T01-A
Loading...
+ 4 hidden pages